NIT No |
Description |
Unit |
Notification Date |
Date of Opening of Bids |
Corrigendum (if any) No. |
| NIT_5865 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF FRANCIS TYPE TURBINES, GENERATORS, TRANSFORMERS, SWITCHGEAR AND BUS DUCT, EXCITATION SYSTEM, C AND I ETC OF 4X130 MW PARBATI STAGE III HEP OF NHPC LTD AT BEHALI KULLU DISTRICT, HP |
BHEL, PSNR |
2009-01-06 05:01:00 |
2009-01-29 15:30:00 |
N/A |
| NIT_5864 |
PRESSURE GAUGES |
BHEL, Haridwar |
2009-01-06 02:01:00 |
2009-02-21 14:00:00 |
N/A |
| NIT_5863 |
FLOW METERS |
BHEL, Haridwar |
2009-01-06 02:01:00 |
2009-02-21 14:00:00 |
N/A |
| NIT_5862 |
BARRIER FILTER SYSTEM |
BHEL, Trichy |
2009-01-06 01:01:00 |
2009-02-28 14:30:00 |
N/A |
| NIT_5861 |
MAINTENANCE OF OXIDATION PONDS IN FACTORY UPTO MARCH 2010 |
BHEL, Ranipet |
2009-01-06 09:01:00 |
2009-01-23 15:00:00 |
N/A |
| NIT_5860 |
MAINTENENCE OF BHEL BROAD GAUGE, GANTRY TRACKS AND HORTICULTURE
MAINTENANCE UPTO MARCH 2010 IN FACTORY |
BHEL, Ranipet |
2009-01-06 09:01:00 |
2009-01-23 15:00:00 |
N/A |
| NIT_5859 |
250KVA DG SET ON HIRE BASIS FOR ONE MONTH |
BHEL, Jagdishpur |
2009-01-05 04:01:00 |
2009-01-15 15:00:00 |
N/A |
| NIT_5858 |
UNLOADING, VERIFICATION, STACKING ETC. OF PLANT AND OTHER MATERIALS OF BOILER, TG, ELECTRICAL AND ASSOCIATED AUXILIARIES AT 2X500 MW ANPARA-D TPS, ANPARA, UTTAR PRADESH |
BHEL, PSNR |
2009-01-05 04:01:00 |
2009-01-29 15:30:00 |
N/A |
| NIT_5857 |
LIFTING OF THE BOILER DRUMS BY MEANS OF STRAND JACKS AT KOSTI TPP 4X125 MW UNITS SUDAN |
BHEL, PSNR |
2009-01-05 12:01:00 |
2009-01-22 15:30:00 |
N/A |
| NIT_5856 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK APPLICATION OF REFRACTORY INSULATION WORK AND CONNECTED WORK FOR BOILER AND ITS AUXILIARIES AND PIPING WORKS FOR UNIT 1 AND 2 OF 2 X 250 MW CFBC BOILER AT NEYVELI THERMAL POWER STATION II EXPANSION NEYVELI CUDDALORE DIST TAMILNADU |
BHEL, PSSR |
2009-01-05 10:01:00 |
2009-01-27 15:30:00 |
N/A |
| NIT_5855 |
PROVIDING EMERGENCY EXITS TO ANNEXE BUILDINGS IN FACTORY AREA -PHASE -II |
BHEL, Hyderabad |
2009-01-03 08:01:00 |
2009-01-16 13:30:00 |
N/A |
| NIT_5854 |
PROVIDING JOB TILTING FACILITY- WOODEN FLOORING IN AB BAY OF 01 BLOCK |
BHEL, Hyderabad |
2009-01-03 08:01:00 |
2009-01-16 13:30:00 |
N/A |
| NIT_5853 |
MODIFICATIONS TO THE EXISTING USED/WASTE OIL STORAGE FACILITY -GALVALUEME SHEET ROOFING AT 32 STORES |
BHEL, Hyderabad |
2009-01-03 08:01:00 |
2009-01-16 13:30:00 |
N/A |
| NIT_5852 |
CORRIGENDUM TO THE TENDER NOTICE NO HY/FCD/OT-15/2008-09 DT-08.12.08 - PLANTATION OF SAPLINGS AND DEVELOPMENT OF GREEN COVERAGE OF LALBAHUDUR SASTRY PARK AND NEAR 9 FA SITE |
BHEL, Hyderabad |
2009-01-03 07:01:00 |
2009-01-09 13:30:00 |
N/A |
| NIT_5851 |
MULTI GAS MONITORCO H2S CL2 O2 |
BHEL, Haridwar |
2009-01-03 02:01:00 |
2009-02-18 14:00:00 |
N/A |
| NIT_5850 |
CO2 AMBIENT AIR MONITOR |
BHEL, Haridwar |
2009-01-03 01:01:00 |
2009-02-18 14:00:00 |
N/A |
| NIT_5849 |
DOMESTIC COURIER SERVICE CONTRACT |
BHEL, Bangalore |
2009-01-03 11:01:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5848 |
TENDER NOTICE FOR CIVIL WORKS IN FACTORY AREA |
BHEL, Hyderabad |
2009-01-02 07:01:00 |
2009-01-16 13:30:00 |
N/A |
| NIT_5847 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2009-01-02 10:01:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5846 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2009-01-02 10:01:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5845 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2009-01-02 10:01:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5844 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2009-01-02 10:01:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5843 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2009-01-02 10:01:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5842 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2009-01-02 10:01:00 |
2009-01-01 11:00:00 |
N/A |
| NIT_5841 |
MAINTAINANCE OF HORTICULTURE GARDEN SEWER LINES AND PATHWAYS INSIDE THE FACTORY PREMISIS |
BHEL, Bangalore |
2009-01-02 09:01:00 |
2009-01-23 15:15:00 |
N/A |
| NIT_5840 |
ARRANGEMENT OF SNACKS AND TEA/COFFEE FOR OUR ERP TEAM FOR A PERIOD OF 6 MONTHS FROM JAN2009 TO JUNE2009 |
BHEL, Hyderabad |
2009-01-02 08:01:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5839 |
DESIGN ENGINEERING MANUFACTURING SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 2MVA 3PHASE 11KV OUTPUT MOTOR GENERATOR SET.DELY REQD IN MAY-09. |
BHEL, Jhansi |
2009-01-01 03:01:00 |
2009-01-27 14:00:00 |
N/A |
| NIT_5838 |
BED PLATE 1.525M X 3.050M 5 X 10.DELY REQD IN MAY 09. |
BHEL, Jhansi |
2009-01-01 03:01:00 |
2009-01-27 14:00:00 |
N/A |
| NIT_5837 |
DESIGN ENGINEERING MANUFACTURING SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 10MVA 3PHASE 11KV OUTPUT MOTOR GENERATOR SET.DELY REDQ IN JULY 09 |
BHEL, Jhansi |
2009-01-01 03:01:00 |
2009-01-27 14:00:00 |
N/A |
| NIT_5836 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2008-12-31 03:12:00 |
2009-01-31 00:00:00 |
N/A |
| NIT_5835 |
SUPPLY OF ROTOR FORGING AS PER BHEL DRAWING AND SPECIFICATIONS. |
BHEL, Hyderabad |
2008-12-31 01:12:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5834 |
MANUFACTURE AND SUPPLY OF CREEP ALLOY STEEL OUTER CASING CASTINGS AS PER BHEL SPECIFICATIONS AND DRAWINGS |
BHEL, Hyderabad |
2008-12-31 01:12:00 |
2009-01-31 00:00:00 |
N/A |
| NIT_5833 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL SPECIFICATION AND DRAWINGS. |
BHEL, Hyderabad |
2008-12-31 01:12:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5832 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL SPECIFICATION AND DRAWINGS. |
BHEL, Hyderabad |
2008-12-31 12:12:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5831 |
SUPPLY OF ROTOR FORGINGS AS PER BHEL SPECIFICATION AND DRAWINGS. |
BHEL, Hyderabad |
2008-12-31 11:12:00 |
2009-01-31 11:00:00 |
N/A |
| NIT_5830 |
SUPPLY OF CEMENT AT SITE |
BHEL, PSNR |
2008-12-31 10:12:00 |
2009-01-12 15:30:00 |
N/A |
| NIT_5829 |
AMC FOR EXISTING NODES,LAYING AND TERMINATION OF FIBER OPTIC CABLE AND INSTALLATION OF NEW NETWORK NODES |
BHEL, Bhopal |
2008-12-31 10:12:00 |
2009-01-16 02:30:00 |
N/A |
| NIT_5828 |
NIT FOR RUNNING AND MAINTENANCE OF TELEPHONE SYSTEM,DATA AND VOICE SYSTEM, TELECOMMUNICATION SYSTEM AND TELEPHONE LINES FOR BHEL,PSER IN OFFICE AND AT DIFFERENT LOCATIONS OF BHEL BHAWAN, SALT LAKE ,KOLKATA. |
BHEL, PSER |
2008-12-31 09:12:00 |
2009-01-07 15:00:00 |
N/A |
| NIT_5827 |
MANUFACTURE AND SUPPLY OF CREEP STEEL OUTER AND INNER CASING CASTINGS |
BHEL, Hyderabad |
2008-12-31 09:12:00 |
2009-01-31 00:00:00 |
N/A |
| NIT_5826 |
MANUFACTURE AND SUPPLY OF CREEP STEEL CASTINGS AS PER BHEL SPECIFICATIONS AND DRAWINGS |
BHEL, Hyderabad |
2008-12-31 09:12:00 |
2009-01-31 00:00:00 |
N/A |
| NIT_5825 |
FABRICATION, ERECTION AND COMMISSIONING OF DSL LINE AT NEW PLANT, NEW SHIPPING OUTER YARD AND RPS. |
BHEL, Trichy |
2008-12-30 04:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5824 |
ERECTION AND CABLING/ WIRING OF CRANES CAPACITY 2 TO 5 TONS |
BHEL, Trichy |
2008-12-30 04:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5823 |
ERECTION AND CABLING/ WIRING OF CRANES CAPACITY 20 TO 40 TONS |
BHEL, Trichy |
2008-12-30 03:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5822 |
ERECTION AND CABLING/ WIRING OF CRANES CAPACITY 10 TO 50 TONS |
BHEL, Trichy |
2008-12-30 03:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5821 |
ERECTION AND CABLING/ WIRING OF CRANES CAPACITY 20 TO 100 TONS |
BHEL, Trichy |
2008-12-30 03:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5820 |
NIT FOR CONSTRUCTON OF COVERED , SEMI-COVERED STORES, SITE OFFICE, AREA LEVELLING AND GRADING, TEMPORARY ROADS, DRAINS AND CULVERTS, FENCING ETC AND MISC ENABLING CIVIL WORKS FOR 2X660 MW THERMAL UNITS 4 AND 5, AT BARH STPP STG-II PROJECT,PATNA, BIHAR. |
BHEL, PSER |
2008-12-30 02:12:00 |
2009-01-20 15:00:00 |
N/A |
| NIT_5819 |
11 |
BHEL, Jhansi |
2008-12-30 11:12:00 |
2008-01-01 00:00:00 |
N/A |
| NIT_5818 |
ASSISTANCE IN TRANSPORT SECTION FOR VEHICLES OPERATION, MAINTENANCE AND UPKEEP |
BHEL, Bangalore |
2008-12-29 05:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5817 |
ASSISTANCE IN WORKSHOP AND TOOLFILING SECTION FOR TURNING, MACHINING, WELDING AND CLEANING |
BHEL, Bangalore |
2008-12-29 05:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5816 |
ASSISTING MECHANICAL MAINTENANCE WORKS IN INSULATOR MECHANICAL MAINTENANCE, BOILERS AND COMPRESSORS SECTION |
BHEL, Bangalore |
2008-12-29 05:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5815 |
ASSISTING FOR WORKS LIKE WATER SUPPLY, SANITARY, HORTICULTURE, SWEEPING, TOILET CLEANING ETC., AT TOWNSHIPS |
BHEL, Bangalore |
2008-12-29 04:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5814 |
MULTI DISCIPLINARY SYSTEM SIMULATION SOFTWARE |
BHEL, Bangalore |
2008-12-29 02:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5813 |
ASSISTING FOR WORKS LIKE WATER SUPPLY AND MAINTENANCE, HORTICULTURE, TOILETS AND DRAIN CLEANING, ETP, ETC. |
BHEL, Bangalore |
2008-12-29 02:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5812 |
ERECTION AND COMMISSIONING OF 1X500 MW BOILER AND AUXILLIRAIES AT UKAI TPS EXPANSION PROJECT, TAPI DISTRICT, GUJARAT |
BHEL, PSWR |
2008-12-29 12:12:00 |
2009-01-20 11:00:00 |
N/A |
| NIT_5811 |
REAL TIME DIGITAL SIMULATOR |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5810 |
CONVERTER TRANSFORMER |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5809 |
ISOLATORS |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5808 |
LT DISTRIBUTION PANEL |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5807 |
VIBRATION MONITORING SYSTEM |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5806 |
UPS |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5805 |
REMOTE MONITORING SYSTEM |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5804 |
ACCESS CONTROL SYSTEM |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 13:30:00 |
N/A |
| NIT_5803 |
PHOTO COPYING, COMPILATION AND SPIRAL BINDING FOR 2 YEARS |
BHEL, Bangalore |
2008-12-29 10:12:00 |
2009-01-21 15:00:00 |
N/A |
| NIT_5802 |
MAINTENANCE OF HORTICULTURE AND UPKEEPING WORKS IN TOWNSHIP FOR
THE YEAR 2008-09 |
BHEL, Ranipet |
2008-12-27 04:12:00 |
2009-01-19 15:00:00 |
N/A |
| NIT_5801 |
CNC HORIZONTAL BORING MACHINE, SPINDLE DIA. 200 MM |
BHEL, Haridwar |
2008-12-27 02:12:00 |
2009-02-12 14:00:00 |
N/A |
| NIT_5800 |
ERECTION, TESTING AND COMMISSIONING OF BOILER, TG, PIPING, CNI, ELECTRICAL AND TOTAL MATERIAL HANDLING WORK OF 2X80 MW CPP AT DARIBA MINES, HZL, RAJASTHAN |
BHEL, PSNR |
2008-12-26 06:12:00 |
2009-01-07 15:30:00 |
N/A |
| NIT_5799 |
NIT FOR AUTOMATIC SPECIMEN MOUNTING PRESS |
BHEL |
2008-12-24 05:12:00 |
2009-01-15 14:00:00 |
N/A |
| NIT_5798 |
NIT FOR LAB VIEW SOFTWARE |
BHEL |
2008-12-24 05:12:00 |
2009-01-15 14:00:00 |
N/A |
| NIT_5797 |
NIT FOR CUSTOM DEVELOPMENT OF SIGNAL PROCESSING SOFTWARE MODULE |
BHEL |
2008-12-24 05:12:00 |
2009-01-10 14:00:00 |
N/A |
| NIT_5796 |
NIT FOR 9 NOS OF SA HOUSINGS IN MATERIAL SS-304L AS PER SPECIFICATIONS |
BHEL |
2008-12-24 05:12:00 |
2009-01-15 14:00:00 |
N/A |
| NIT_5795 |
NIT FOR ULTRASONIC HOMOGENIZER |
BHEL |
2008-12-24 05:12:00 |
2009-01-15 14:00:00 |
N/A |
| NIT_5794 |
SUPPLY , INSTALLATION AND MAINTENANCE OF 40 FAX MACHINES |
BHEL, Bhopal |
2008-12-22 11:12:00 |
2009-01-16 02:30:00 |
N/A |
| NIT_5793 |
INVITES SEALED QUOTATIONS AND SAMPLES FROM REPUTED MANUFACTURERS AND AUTHORIZED DEALERS/DISTRIBUTER OF MANUFACTURERS FOR SUPPLY OF PHOTO COPIER PAPER A3 SIZE 2600 RM AND PHOTO COPIER PAPER A4 SIZE 25000 RM |
BHEL, Bhopal |
2008-12-22 11:12:00 |
2009-01-31 02:30:00 |
N/A |
| NIT_5792 |
REGISTRATION AS MULTI MODAL TRANSPORT AGENTS FOR IMPORTS/EXPORTS |
BHEL |
2008-12-24 10:12:00 |
2009-01-17 00:00:00 |
N/A |
| NIT_5791 |
HYDRAULIC MOBILE CRANE 20 T AS PER TENDER SPECIFICATION ENCLOSED |
BHEL, New Delhi |
2008-12-24 09:12:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5790 |
NIT FOR ETC OF TURBINE, GENERATOR, CONDENSER, ASSOCIATED AUXILIARIES, PG TESTING AND HANDING OVER INCLUDING UNLOADING OF GENERATOR STATOR, GENERATOR ROTOR,TURBINE ROTOR ETC FOR 1X120 MW UNIT - 5 AT JOJOBERA PROJECT, JHARKHAND |
BHEL, PSER |
2008-12-23 06:12:00 |
2009-01-13 15:00:00 |
N/A |
| NIT_5789 |
SUPPLY OF STEEL WIRE ROPE OF 26 MM DIA |
BHEL, PSNR |
2008-12-23 05:12:00 |
2009-01-06 15:30:00 |
N/A |
| NIT_5788 |
MANUFACTURE, SUPPLY, ERRECTION AND COMMISSIONING OF RESIN STORAGE TANKS-2NOS. |
BHEL, Hyderabad |
2008-12-23 02:12:00 |
2009-01-03 14:00:00 |
N/A |
| NIT_5787 |
CONTRACT OF HIRING 32 SEATER BUS FOR EDN CISF ACTIVITIES |
BHEL, Bangalore |
2008-12-23 09:12:00 |
2009-01-05 15:00:00 |
N/A |
| NIT_5786 |
CANTEEN UPKEEP, SERVICE, ASSISTANCE |
BHEL, Hyderabad |
2008-12-22 09:12:00 |
2009-01-12 14:00:00 |
N/A |
| NIT_5785 |
CORRIGENDUM TO TENDER NOTICE- HY/FCD/OT-13/08-09 -MAINTENANCE OF ROADS IN FACTORY AND ADMN BUILDING AREA. |
BHEL, Hyderabad |
2008-12-22 05:12:00 |
2008-12-30 13:30:00 |
N/A |
| NIT_5784 |
NIT FOR INSTALLATION AND MAINTENANCE OF CGI FENCING ON LEASE BASIS FOR 2X500 MW MARWA TPP AND 1X500 MW KORBA WEST THERMAL POWER STATION, CHHATTISGARH. |
BHEL, PSER |
2008-12-22 04:12:00 |
2009-01-14 15:00:00 |
N/A |
| NIT_5783 |
NIT FOR HIRING OF 1 NO MID RANGE HEAVY LIFT CRANE 1 NO GENERAL PURPOSE CRANE 2 NO 75MT CRAWLER CRANE FOR 2X500 MW MARWA TPP, CHATTISGARH AND 1 NO MID RANGE HEAVY LIFT CRANE 1 NO GENERAL PURPOSE CRANE 1 NO 75MT CRAWLER CRANE FOR 1X500 MW KORBA -W TPS, CHATTISGARH. |
BHEL, PSER |
2008-12-22 04:12:00 |
2009-01-14 15:00:00 |
Yes 1 |
| NIT_5782 |
NIT FOR MATERIAL MANAGEMENT WORK OF BOILER AND AUXILIARIES, TG AND AUXILIARIES, ELECTRICAL SYSTEM, C AND I SYSTEM, NON-BHEL SYSTEM ETC FOR 1X500 MW UNIT AT BOKARO-A TPS, JHARKHAND. |
BHEL, PSER |
2008-12-22 04:12:00 |
2009-01-14 15:00:00 |
N/A |
| NIT_5781 |
AS PER SPEC |
BHEL, Hyderabad |
2008-12-22 11:12:00 |
2008-12-27 11:00:00 |
N/A |
| NIT_5780 |
CONSTRUCTION OF PRESS SHOP EXTENSION SOUTH SIDE INCLUDING MACHINE FOUNDATION |
BHEL, Bhopal |
2008-12-16 11:12:00 |
2009-01-23 02:30:00 |
N/A |
| NIT_5779 |
OUT SOURCING OF SANITATION, HOUSE KEEPING, HORTICULTURE WORKS IN AND AROUND HRD MAIN BUILDING. |
BHEL, Hyderabad |
2008-12-22 10:12:00 |
2008-12-27 13:30:00 |
N/A |
| NIT_5778 |
EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 400/220 KV SUBSTATION EXTENSION AT BELLARY IN KARNATAKA |
BHEL, Industry Sector |
2008-12-20 03:12:00 |
2009-01-14 15:30:00 |
N/A |
| NIT_5777 |
PROCUREMENT OF 24 MT AMMONIATED EDTA |
BHEL, PSNR |
2008-12-20 02:12:00 |
2009-01-05 15:30:00 |
N/A |
| NIT_5776 |
FOUR WHEEL STEEL TRAILOR 4T CAP. |
BHEL, Haridwar |
2008-12-19 11:12:00 |
2009-02-06 14:00:00 |
N/A |
| NIT_5775 |
ELETRIC FORK LIFTER 3T CAP. |
BHEL, Haridwar |
2008-12-19 10:12:00 |
2009-02-06 14:00:00 |
N/A |
| NIT_5774 |
BATTERY OPERATED TROLLY AND TOW MASTER |
BHEL, Haridwar |
2008-12-19 10:12:00 |
2009-02-06 14:00:00 |
N/A |
| NIT_5773 |
TRANSPORTATION OF VALVE ITEMS BY LORRY. |
BHEL, Trichy |
2008-12-19 09:12:00 |
2008-12-29 10:35:00 |
Yes 1 |
| NIT_5772 |
WORKS CONTRACT FOR PEST CONTROL TREATMENT ON ANNUAL BASIS |
BHEL, ROD |
2008-12-22 07:12:00 |
2009-01-12 00:00:00 |
N/A |
| NIT_5771 |
RENOVATION OF THE EXISTING TOILETS IN 04, 05 AND 08 BLOCKS |
BHEL, Hyderabad |
2008-12-18 07:12:00 |
2009-01-02 13:30:00 |
N/A |
| NIT_5770 |
DISMANTLING EXISTING TOILET AND CONSTRUCTION OF NEW TOILET AT 12 STORES. |
BHEL, Hyderabad |
2008-12-18 06:12:00 |
2008-12-30 13:30:00 |
N/A |
| NIT_5769 |
RENOVATION OF TOILETS WEST SIDE IN 51 BLOCK. |
BHEL, Hyderabad |
2008-12-18 06:12:00 |
2008-12-30 13:30:00 |
N/A |
| NIT_5768 |
PLANTATION OF SAPLINGS AND DEVELOPMENT OF GREEN COVERAGE AT LALBAHADUR SASTRY PARK AND NEAR 9FA SITE. |
BHEL, Hyderabad |
2008-12-18 06:12:00 |
2009-01-09 13:30:00 |
N/A |
| NIT_5767 |
AS PER SPEC |
BHEL, Hyderabad |
2008-12-18 02:12:00 |
2008-12-27 11:00:00 |
N/A |
| NIT_5766 |
AS PER SPEC |
BHEL, Hyderabad |
2008-12-18 01:12:00 |
2008-12-27 11:00:00 |
N/A |
| NIT_5765 |
E T AND C OF 1X292 TPH HRSG AND AUXL INCLUDING PIPING, INSULATIONS ETC AT 1X350MW CCPP AT GSEGL HAZIRA, VILLAGE MORA, GUJARAT |
BHEL, PSWR |
2008-12-18 10:12:00 |
2008-12-30 11:00:00 |
Yes 1 |
| NIT_5764 |
HIGH FREQUENCY GRINDER |
BHEL, Bhopal |
2008-12-02 02:12:00 |
2009-01-10 02:00:00 |
N/A |
| NIT_5763 |
STRESS RELIEVING FURNACE |
BHEL, Bhopal |
2008-12-02 02:12:00 |
2009-01-10 02:00:00 |
N/A |
| NIT_5762 |
10 TON WELDING POSITIONER |
BHEL, Bhopal |
2008-12-02 02:12:00 |
2009-01-08 02:00:00 |
N/A |
| NIT_5761 |
TEST AREA BED PLATES |
BHEL, Bhopal |
2008-12-02 02:12:00 |
2009-01-08 02:00:00 |
N/A |
| NIT_5760 |
STAND ALONE PROCESSING UNIT |
BHEL, Bhopal |
2008-12-02 02:12:00 |
2009-01-08 02:00:00 |
N/A |
| NIT_5759 |
5 TON DIESEL OPERATED FORK LIFT TRUCK, |
BHEL, Bhopal |
2008-12-02 02:12:00 |
2009-01-08 02:00:00 |
N/A |
| NIT_5758 |
CARBURISING AND HARDENING SYSTEM |
BHEL, Bhopal |
2008-12-02 11:12:00 |
2009-01-10 02:00:00 |
N/A |
| NIT_5757 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION ERECTION TESTING AND COMMG OF 1 X 500 MW STEAM TURBINE GENERATOR AUXILIARIES INTEGRAL PPG INCLUDING FINAL PAINTING |
BHEL, PSSR |
2008-12-17 10:12:00 |
2009-01-07 15:30:00 |
N/A |
| NIT_5756 |
MAINTENENCE OF PIPING SYSTEM IN FACTORY |
BHEL, Jhansi |
2008-12-16 04:12:00 |
2008-12-23 14:00:00 |
N/A |
| NIT_5755 |
TOPOGRAPHICAL SURVEY AND GEOTECHNICAL INVESTIGATION WORK OF 2 X 200 MW TISHREEN THERMAL POWER PROJECT AT SYRIA |
BHEL, PSNR |
2008-12-16 11:12:00 |
2009-01-10 15:30:00 |
Yes 1 |
| NIT_5754 |
CIVIL, STRUCTURAL, ARCHITECTURAL WORK INCLUDING FOUNDATIONS- SUPERSTRUCTURE OF VARIOUS PLANT EQUIPMENTS- SYSTEMS- FACILITIES, NON-PLANT BUILDINGS- FACILITIES, MISC CIVIL WORK, ENABLING WORK, BUT EXCLUDING BOP CIVIL WORKS FOR UNIT - 1 AND 2 OF 726.6 MW GAS BASED CCPP AT PALATANA, UDAIPUR, TRIPURA. |
BHEL, PSER |
2008-12-16 10:12:00 |
2009-01-06 15:00:00 |
Yes 5 |
| NIT_5753 |
FABRICATION OF PALLETS,SCRAP BIN, RAILING, BRIDGE, AND CRANE MONKEY LADDERPACKING OF STAMPINGS AT CSU, BHEL JAGDISHPUR AND TRANSPORTATION WORK FROM REPUTED/EXPERIENCED TRANSPORTERS |
BHEL, Jagdishpur |
2008-12-16 10:12:00 |
2009-01-06 15:00:00 |
Yes 1 |
| NIT_5752 |
OUTSOURCING OF CATERING AND HOUSE KEEPING SERVICES CONTRACT CANTEEN, BHEL RANIPET. |
BHEL, Ranipet |
2008-12-15 04:12:00 |
2009-01-12 15:00:00 |
N/A |
| NIT_5751 |
TRANSLATION OF DOCUMENTS FROM ENGLISH TO FRENCH |
BHEL, Trichy |
2008-12-15 01:12:00 |
2009-01-07 14:30:00 |
N/A |
| NIT_5750 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK ERECTION TESTING AND COMMISSIONING OF STEAM TURBINE GENERATOR INTEGRAL PIPING PUMPS AND OTHER AUXILIARIES CONNECTED WITH THE SYSTEM INCLUDING SUPPLY AND APPLICATION OF FINAL PAINTING FOR UNIT 5 OF 210 MW SET AT STAGE III RAYALASEEMATPP FOR APGENCO MUDDANUR CUDDAPAH DIST ANDHRA PRADESH |
BHEL, PSSR |
2008-12-15 10:12:00 |
2009-01-06 15:30:00 |
N/A |
| NIT_5749 |
PROCUREMENT OF SUPPLY, ERECTION, COMMISSIONING AND REVAMPING OF 50 MT LPG BULLET |
BHEL, Trichy |
2008-12-15 09:12:00 |
2009-01-16 14:33:00 |
N/A |
| NIT_5748 |
SHIFTING OF PREHEATING FURNACE FROM EXISTING LOCATION TO NEW LOCATION IN 02 BLOCK. |
BHEL, Hyderabad |
2008-12-15 07:12:00 |
2008-12-30 13:30:00 |
N/A |
| NIT_5747 |
CONSTRUCTION OF FABRICATION SHOP AND ASSOCIATED WORKS INCLUDING ARCHITECTURAL WORKS AT JAGDISHPUR
DISTT SULTANPUR UP |
BHEL, Jagdishpur |
2008-12-14 06:12:00 |
2009-01-06 15:00:00 |
Yes 1 |
| NIT_5746 |
PROCUREMENT OF GLOBE VALVE,Y TYPE STRAINER,GUN METAL TAPPING VALVE |
BHEL, Trichy |
2008-12-13 01:12:00 |
2009-01-05 14:30:00 |
N/A |
| NIT_5745 |
SUPPLY OF COOLING WATER PIPES -IS 3589- FOR BHUSAWAL, KHAPERKADA, UKAI AND KODERMA PROJECTS |
BHEL, Piping Centre |
2008-12-12 04:12:00 |
2008-12-22 14:30:00 |
Yes 1 |
| NIT_5744 |
NIT FOR ISSUE OF TENDER FOR MAIN CIVIL, STRUCTURAL AND ARCHITECTURAL WORK TOGETHER WITH ERECTION AND COMMISSIONING OF BOILER, ESP, ROTATING MACHINES, CRITICAL PIPING AND CW AND LP PIPING SYSTEM FOR 1X500 MW UNIT AT BOKARO- A TPS, JHARKHAND |
BHEL, PSER |
2008-12-12 02:12:00 |
2009-01-03 15:00:00 |
Yes 3 |
| NIT_5743 |
NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF FOUR 04 NOS. HEAVY LIFT CRAWLER CRANES SUITABLE FOR LIFTING CRITICAL LOAD FOR 250MW BOILER FOR BHEL SITES. |
BHEL, PSER |
2008-12-12 01:12:00 |
2009-01-05 15:00:00 |
Yes 1 |
| NIT_5742 |
NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF TEN NOS. 80MT HYDRAULIC CRAWLER CRANES FOR BHEL SITES |
BHEL, PSER |
2008-12-12 12:12:00 |
2009-01-06 15:00:00 |
Yes 1 |
| NIT_5741 |
CNC VERTICAL BORER TABLE DIA 1.6 M |
BHEL, Haridwar |
2008-12-12 11:12:00 |
2009-01-28 14:00:00 |
N/A |
| NIT_5740 |
TENDER NOTICE FOR CIVIL WORKS OT - 16 |
BHEL, Hyderabad |
2008-12-12 09:12:00 |
2009-01-02 13:30:00 |
N/A |
| NIT_5739 |
TENDER NOTICE FOR CIVIL WORKS OT - 15 |
BHEL, Hyderabad |
2008-12-12 09:12:00 |
2008-12-30 13:30:00 |
N/A |
| NIT_5738 |
METROLOGY WELLS |
BHEL, Haridwar |
2008-12-12 09:12:00 |
2009-01-28 14:00:00 |
N/A |
| NIT_5737 |
SUPPLY ERRECTION TESTING AND COMMISSIONING OF VCB S TRANSFORMER LTDB APFC PANEL BUS DUCT CABLES ETC |
BHEL, Haridwar |
2008-12-12 09:12:00 |
2009-01-28 14:00:00 |
Yes 1 |
| NIT_5736 |
E T AND C OF 2X500MW STEAM TURBINE, GENERATOR AND AUXL FOR UNIT 1 AND 2 AT BHUSAWAL TPS OF MSPGCL, AT BHUSAWAL, DIST JALAGAON MAHARASTRA |
BHEL, PSWR |
2008-12-12 08:12:00 |
2008-12-23 11:00:00 |
Yes 2 |
| NIT_5735 |
CNC VERTICAL MACHINING CENTRE, TABLE 1250MM X 650MM |
BHEL, Haridwar |
2008-12-12 08:12:00 |
2009-01-28 14:00:00 |
N/A |
| NIT_5734 |
INFRA RED THERMAL IMAGER DELY REQD IN APRIL 09. |
BHEL, Jhansi |
2008-12-11 10:12:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5733 |
TRANSFORMER ASSEMBLY PORTABLE PLATFORM FOR POWER ASSEMBLY DELY REQD IN MAY 09 |
BHEL, Jhansi |
2008-12-11 10:12:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5732 |
HYDRAULIC PRESS 80 TON CAPACITY DELY REQD IN MAY 09 |
BHEL, Jhansi |
2008-12-11 10:12:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5731 |
NIT FOR VACUUM CHAMBER WITH VACUUM SYSTEM |
BHEL |
2008-12-10 06:12:00 |
2009-01-03 14:00:00 |
N/A |
| NIT_5730 |
DATA ACQUISITION SYSTEM FOR BLADE VIBRATION MONITORING, INTERFACE UNIT FOR SENSORS, PRE-AMPLIFIERS FOR SENSORS, EDDY CURRENT PROBES ALONG WITH BLADE AND DISC HEALTH MONITOR SOFTWARE |
BHEL |
2008-12-10 06:12:00 |
2009-01-03 14:00:00 |
N/A |
| NIT_5729 |
NIT FOR ERECTION/ LAYING, TESTING, COMMISSIONING ETC OF GT, ST, UAT, OTHER TRANSFORMERS, BUS-DUCT, CABLE, CABLE TRAYS AND ACCESSORIES, HT SWGR, LT SWGR, ETC INCLUDING SUPPLY OF MATERIALS FOR 1X250 MW UNIT - 6 AT SANTALDIH TPS, WB. |
BHEL, PSER |
2008-12-10 06:12:00 |
2009-01-03 15:00:00 |
Yes 2 |
| NIT_5728 |
WOOLLEN JACKETS |
BHEL, Jhansi |
2008-12-10 01:12:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5727 |
SMOKE GREY TERRYCOT 80-20 PC GAB SUITING PANT , SMOKE GREY TERRYCOT 67X33 SHIRTING AND SMOKE GREY SAREE 80-20 POLYESTER-5.5MTRS. |
BHEL, Jhansi |
2008-12-10 01:12:00 |
2009-01-09 14:00:00 |
N/A |
| NIT_5726 |
NORMAL PROTECTIVE LEATHER SHOE IN BLACK COLOUR AND LADIES SANDLE IN BLACK COLOUR |
BHEL, Jhansi |
2008-12-10 01:12:00 |
2009-01-06 14:00:00 |
N/A |
| NIT_5725 |
O AND M AND W AND W SERVICES OF 16X250KW WEGS OF BHEL WIND FARM AT KADAVAKKALLU AT ANANTAPUR DT, ANDHRAPRADESH. |
BHEL, Ranipet |
2008-12-10 10:12:00 |
2008-12-24 15:00:00 |
N/A |
| NIT_5724 |
ERECTION, TESTING, COMMISSIONING, TRIAL OPERATION AND HANDING OVER OF 4X240 TPH UTILITY BOILERS, 2X110 TPH HRSG AND MATERIAL HANDLING WORK OF GGSRP / CPP AT BATHINDA HPCL MITTAL ENERGY LTD. |
BHEL, PSNR |
2008-12-10 10:12:00 |
2009-01-06 15:30:00 |
Yes 1 |
| NIT_5723 |
CONSTRUCTION OF RAW WATER RESERVOIR BOUNDARY WALL AND GENERAL CIVIL WORKS AT NORTH CHENNAI TPS TAMILNADU |
BHEL, PSSR |
2008-12-10 09:12:00 |
2008-12-30 15:30:00 |
Yes 2 |
| NIT_5722 |
RADIO INTERFERENCE VOLTAGE METER |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-27 02:00:00 |
N/A |
| NIT_5721 |
PORTABLE DRILLING MACHINE |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-27 02:00:00 |
N/A |
| NIT_5720 |
PORTABLE DIGITAL DEW POINT METER |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-27 02:00:00 |
N/A |
| NIT_5719 |
18 TON WELDING POSITIONER |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-27 02:00:00 |
N/A |
| NIT_5718 |
2 MT SINGLE GIRDER EOT CRANE |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-23 02:00:00 |
N/A |
| NIT_5717 |
GEAR / PINION SHOT PEENING MACHINE |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-23 02:00:00 |
N/A |
| NIT_5716 |
GEAR / PINION SHOT BLASTING MACHINE |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-23 02:00:00 |
N/A |
| NIT_5715 |
PINION DEBURRING MACHINE |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-23 02:00:00 |
N/A |
| NIT_5714 |
FLUX BAKING OVEN |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-20 02:00:00 |
N/A |
| NIT_5713 |
TURN TABLE |
BHEL, Bhopal |
2008-12-09 05:12:00 |
2008-12-20 02:00:00 |
N/A |
| NIT_5712 |
SUBMERGED ARC WELDING MACHINE |
BHEL, Bhopal |
2008-12-09 04:12:00 |
2008-12-20 02:00:00 |
N/A |
| NIT_5711 |
20 TON JOB ROTATOR |
BHEL, Bhopal |
2008-12-09 04:12:00 |
2008-12-20 02:00:00 |
N/A |
| NIT_5710 |
CONSTRUCTION OF WORK SHOPS, ALLIED STRUCTURES, MACHINE FOUNDATION, SERVICES AND ALLIED CIVIL WORKS |
BHEL, Jhansi |
2008-12-09 01:12:00 |
2009-01-02 14:00:00 |
Yes 1 |
| NIT_5709 |
SETTING UP OF 2X3 MWP GRID CONNECTED SPV POWER PLANT |
BHEL, Bangalore |
2008-12-09 12:12:00 |
2008-12-15 13:30:00 |
N/A |
| NIT_5708 |
CATERING AND HOUSEKEEPING SERVICES IN HRDI BLDG |
BHEL |
2008-11-22 05:12:00 |
2008-12-24 03:00:00 |
Yes 2 |
| NIT_5707 |
HIRING OF ROTARY HYDRAULIC RIGS ON CRAWLER FOR DEPLOYMENT AT 2X750 MW PRAGATI - III COMBINED CYCLE POWER PROJECT AT BAWANA, DELHI |
BHEL, PSNR |
2008-12-08 05:12:00 |
2008-12-23 15:30:00 |
N/A |
| NIT_5706 |
TO PROVIDE TRAVEL RELATED SERVICES FOR BHEL OFFICES LOCATED IN DELHI NCR, INCLUDING NOIDA AND HARIDWAR |
BHEL, New Delhi |
2008-12-08 04:12:00 |
2008-12-23 15:30:00 |
N/A |
| NIT_5705 |
PREPARATION OF PACKING PLATES FOR CLAMPING BARS. |
BHEL, Hyderabad |
2008-12-08 09:12:00 |
2008-12-29 13:30:00 |
N/A |
| NIT_5704 |
MANUFACTURE AND SUPPLY OF CERAMIC LINED MPO TO DRG.NO. 36140002954 REV.02 |
BHEL, Hyderabad |
2008-12-08 09:12:00 |
2009-01-31 13:30:00 |
N/A |
| NIT_5703 |
PROVIDING ELECTRICAL SERVICES FOR OPEN GANTRY ADJACENT TO 09 SHOP FOR CDC OPERATIONS. |
BHEL, Hyderabad |
2008-12-08 09:12:00 |
2008-12-29 13:30:00 |
N/A |
| NIT_5702 |
| | | |