|
NIT No |
Description |
Unit |
Notification Date |
Date of Opening of Bids |
Corrigendum (if any) No. |
| NIT_6760 |
VENDOR EMPANELMENT FOR SERVICING JOB |
BHEL, PSWR |
2009-07-03 04:07:00 |
2009-08-20 11:00:00 |
N/A |
| NIT_6759 |
SUPPLY, INSTALLATION, COMMISSIONING OF UPS AS PER ATTACHED SPECIFICATIONS |
BHEL |
2009-07-03 02:07:00 |
2009-07-25 14:00:00 |
N/A |
| NIT_6758 |
SUPPLY, E AND C OF 3PH 1000KVA, 6.6KV/400V, DELTA/STAR, OIL COOLED OUTDOOR INSTALLABLE TRANSFORMER AS PER ATTACHED SPECIFICATIONS |
BHEL |
2009-07-03 02:07:00 |
2009-07-30 14:00:00 |
N/A |
| NIT_6757 |
REPAIR, RECTIFICATION OF FAULTS IN LIGHTING ACCESSORIES, FANS, WIRING INSTALLATIONS, KITCHEN EQUIPMENTS OF WORKS CANTEEN INCLUDING PREVENTIVE MAINTENANCE- 1 YEAR PERIOD |
BHEL, Hyderabad |
2009-07-03 01:07:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6756 |
PERIODICAL CHECKING OF FIRE EXTINGUISHERS- 1056 NOS ON MONTHLY BASIS |
BHEL, Hyderabad |
2009-07-03 01:07:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6755 |
UPKEEPING OF EECTRONIC LAB AND SUPPORTING ACTIVITIES IN ELECTRONICS MAINTENANCE - 302 OPERATIONS IN A YEAR |
BHEL, Hyderabad |
2009-07-03 01:07:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6754 |
DAK DISTRIBUTION AND DAY TO DAY WORK IN M AND S , P AND C ALSO AT GM M AND S OFFICE- 604 OPERATIONS |
BHEL, Hyderabad |
2009-07-03 01:07:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6753 |
LOADING,UNLOADING OF FUELS, LUBE OILS, SLUDGES ETC AT 6MW DG POWER HOUSE- 604 OPERATIONS UPTO 31.03.2010 |
BHEL, Hyderabad |
2009-07-03 01:07:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6752 |
TENDER NOTICE FOR MAINTENANCE WORKS IN FACTORY AREA |
BHEL, Hyderabad |
2009-07-03 10:07:00 |
2009-07-29 14:30:00 |
N/A |
| NIT_6751 |
SUPPLY OF ALLOY STEEL BUTT WELDED PIPE FITTINGS |
BHEL, Piping Centre |
2009-07-03 09:07:00 |
2009-07-17 14:30:00 |
N/A |
| NIT_6750 |
STRESS RELIEVING FURNACE |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-18 02:00:00 |
N/A |
| NIT_6749 |
AIR CONDITIONING SYSTEM FOR CNC GEAR MEASURING MACHINE |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-18 02:00:00 |
N/A |
| NIT_6748 |
COLPOSCOPE |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-18 02:00:00 |
N/A |
| NIT_6747 |
SWEEP FREQUENCY RESPONSE ANALYSER |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-21 02:00:00 |
N/A |
| NIT_6746 |
MODIFICATION OF NORTH GATE 1 7.5 M X 15 M AND 2 9.5 M X 15 M |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-18 02:00:00 |
N/A |
| NIT_6745 |
INSULATION RESISTANCE MEASURING INSTRUMENT FOR LIQUID DIELECTRIC |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-21 02:00:00 |
N/A |
| NIT_6744 |
FUME EXTRACTOR FOR GEAR GRINDING MACHINE |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-21 02:00:00 |
N/A |
| NIT_6743 |
MICA DUST COLLECTOR |
BHEL, Bhopal |
2009-06-11 07:07:00 |
2009-07-21 02:00:00 |
N/A |
| NIT_6742 |
INDUCTION HEATER |
BHEL, Bhopal |
2009-06-11 06:07:00 |
2009-07-21 02:00:00 |
N/A |
| NIT_6741 |
SUPPLY, INSTALLATION AND MAINTENANCE OF SMART CARD BASED TIME AND ATTENDANCE RECORDING SYSTEM ON LEASE BASIS FOR 5 YEAR |
BHEL, Bhopal |
2009-07-01 06:07:00 |
2009-07-27 00:00:00 |
N/A |
| NIT_6740 |
LIMITED TENDER -LEVELING AND ALIGNMENT OF CNC GANTRY DRILLING MACHINE, MAKE MAUT IN 06 BLOCK. |
BHEL, Hyderabad |
2009-07-01 02:07:00 |
2009-07-04 13:30:00 |
N/A |
| NIT_6739 |
EOT CRANE 2T CAPACITY |
BHEL, Bangalore |
2009-07-01 10:07:00 |
2009-07-14 14:30:00 |
N/A |
| NIT_6738 |
SUPPLY OF ELECTRICALLY OPERATED HOIST |
BHEL, Trichy |
2009-06-30 04:06:00 |
2009-07-03 14:30:00 |
N/A |
| NIT_6737 |
LUMINARIES FOR 20M HIGH MAST SYSTEM AS PER SPECIFICATIONS - 1 LOT |
BHEL |
2009-06-30 12:06:00 |
2009-07-21 14:00:00 |
N/A |
| NIT_6736 |
20M HIGH MAST SYSTEM AS PER SPECIFICATIONS - 1LOT |
BHEL |
2009-06-30 12:06:00 |
2009-07-28 14:00:00 |
N/A |
| NIT_6735 |
EMPANELMENT FOR VARIOUS TYPES OF WORKS BEING EXECUTED BY BHEL PSWR, NAGPUR |
BHEL, PSWR |
2009-06-30 11:06:00 |
2009-10-01 00:00:00 |
N/A |
| NIT_6734 |
SAFETY CLOTH FOR EMPLOYEES AS PER SPECIFICATIONS - 2630M |
BHEL |
2009-06-30 11:06:00 |
2009-07-21 14:00:00 |
N/A |
| NIT_6733 |
UNIFORM CLOTH FOR MALE EMPLOYEES AS PER SPECIFICATIONS - 1873.2M |
BHEL |
2009-06-30 11:06:00 |
2009-07-21 14:00:00 |
N/A |
| NIT_6732 |
GAS DISTRIBUTION SYSTEM AS PER SPECIFICATIONS - 1 LOT |
BHEL |
2009-06-30 11:06:00 |
2009-07-18 14:00:00 |
N/A |
| NIT_6731 |
REPLACEMENT OF AC PIPES WITH PVC PIPES IN TOWNSHIP. |
BHEL, Hyderabad |
2009-06-30 09:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6730 |
FILM PROCESSOR AND ILLUMINATOR |
BHEL, Haridwar |
2009-06-29 04:06:00 |
2009-07-31 14:00:00 |
N/A |
| NIT_6729 |
LAYING OF SECOND LANE ROAD FROM 24 BLDG. ROUNDANA TO NEHRU NAGAR ROUNDANA IN NEW PLANT AREA UNDER CAS PHASE II. |
BHEL, Trichy |
2009-06-29 01:06:00 |
2009-07-22 15:00:00 |
N/A |
| NIT_6728 |
SUPPLY AND ERECTION OF JIB CRANE |
BHEL, Trichy |
2009-06-29 10:06:00 |
2009-07-17 15:00:00 |
N/A |
| NIT_6727 |
AUGMENTATION OF CAPACITY OF STEAM TURBINES- ELECTRICAL WORKS FOR AA BAY EXTENSION. |
BHEL, Hyderabad |
2009-06-29 09:06:00 |
2009-07-13 13:30:00 |
N/A |
| NIT_6726 |
ESTABLISHMENT OF NEW BLADE SHOP- ELECTRICAL WORKS RELATED TO ERECTION AND COMMISSIONING OF TRANSFORMERS AND SWITCHGEAR ETC. |
BHEL, Hyderabad |
2009-06-29 09:06:00 |
2009-07-13 13:30:00 |
N/A |
| NIT_6725 |
MODIFICATIONS TO TYPE-V QUARTERS 7 NOS IN NH-I - CIVIL WORKS. |
BHEL, Hyderabad |
2009-06-27 09:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6724 |
MAINTENANCE OF EXTERNAL WATER SUPPLY, REPAIRS OF SUBMERSIBLE PUMPS ETC., IN FACTORY AND ADMN BUILDING AREA |
BHEL, Hyderabad |
2009-06-26 06:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6723 |
GRASS CUTTING IN OPEN AREAS AND MAINTENANCE OF STORAGE YARDS IN FACTORY AND ADMINISTRATIVE BUILDING |
BHEL, Hyderabad |
2009-06-26 06:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6722 |
LARVACIDAL OPERATIONS AND ANTI-TERMITE AND BIRD NUISANCE IN FACTORY AREA AND ADMN BUILDING |
BHEL, Hyderabad |
2009-06-26 06:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6721 |
RENOVATION OF CONTROL ROOM IN 02 BLOCK AND PROVIDING SIGN BOARDS IN FACTORY AREA |
BHEL, Hyderabad |
2009-06-26 06:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6720 |
MISC MACHINE FOUNDATIONS IN FACTORY AREA. |
BHEL, Hyderabad |
2009-06-26 06:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6719 |
SALE OF MIXED TREE IN FACTORY AREA |
BHEL, Jhansi |
2009-06-26 03:06:00 |
2009-07-17 14:00:00 |
N/A |
| NIT_6718 |
MODIFICATIONS TO TYPE VI QUARTERS 2 NOS - CIVIL WORKS |
BHEL, Hyderabad |
2009-06-26 03:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6717 |
SANITATION ACTIVITIES IN FACTORY AREA |
BHEL, Jhansi |
2009-06-26 03:06:00 |
2009-07-17 14:00:00 |
N/A |
| NIT_6716 |
PORTABLE HARDNESS TESTER |
BHEL, Haridwar |
2009-06-26 03:06:00 |
2009-08-07 14:00:00 |
N/A |
| NIT_6715 |
PORTABLE SURFACE ROUGHNESS TESTER |
BHEL, Haridwar |
2009-06-26 03:06:00 |
2009-08-07 14:00:00 |
N/A |
| NIT_6714 |
PROVIDING G.I PIPE LINESFOR DISTRIBUTION OF WATER. |
BHEL, Hyderabad |
2009-06-26 02:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6713 |
PROVIDING SECURITY SERVICES AT HRDC HOSTELS. |
BHEL, Hyderabad |
2009-06-26 01:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6712 |
NIT FOR ERECTION, TESTING AND COMMISSIONING OF STEAM TURBINE AND AUXILLIARIES, GENERATOR AND AUXILLIARIES, BPTG AND TURBO-BLOWERS AT 3X 18 MW, POWER AND BLOWING STATION, IISCO BURNPUR, WEST BENGAL |
BHEL, PSER |
2009-06-26 12:06:00 |
2009-07-18 15:00:00 |
N/A |
| NIT_6711 |
LAND SCAPPING AND DEVELOPMENT OF HORTICULTURE WORK IN GENERAL HOSPITAL |
BHEL, Hyderabad |
2009-06-26 11:06:00 |
2009-07-17 00:00:00 |
N/A |
| NIT_6710 |
PROVIDING CERAMIC TILES TO TYPE - IV QUARTERS IN TOWNSHIP. |
BHEL, Hyderabad |
2009-06-26 10:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6709 |
SAFETY ITEMS |
BHEL, Bangalore |
2009-06-26 10:06:00 |
2009-07-15 13:30:00 |
N/A |
| NIT_6708 |
LABOUR CHARGES FOR LAYING OF CERAMIC TILES TO TYPE IV QUARTERS IN NH-V |
BHEL, Hyderabad |
2009-06-26 09:06:00 |
2009-07-17 13:30:00 |
N/A |
| NIT_6707 |
ELECTRICAL WORKS FOR CO2 TANK YARD AND 5T OPEN GANTRY IN 01 BLOCK. |
BHEL, Hyderabad |
2009-06-26 08:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6706 |
PROVIDING SERVICES OF VARIOUS CAPACITY CRANES AT 2X250MW BINA TPS AND 2X351.43MW PIPAVAV CCPP |
BHEL, PSWR |
2009-06-25 06:06:00 |
2009-07-16 11:00:00 |
N/A |
| NIT_6705 |
TRANSPORTATION OF EQUIPMENT BY HYDRAULIC TRAILERS |
BHEL, Hyderabad |
2009-06-25 10:06:00 |
2009-07-18 14:30:00 |
N/A |
| NIT_6704 |
TRANSPORTATION OF EQUIPMENT BY MECHANICAL TRAILERS |
BHEL, Hyderabad |
2009-06-25 10:06:00 |
2009-07-18 14:30:00 |
N/A |
| NIT_6703 |
CIVIL AND ELECTRICAL WORKS TENDER NOTICE -FACTORY CIVIL DEPARTMENT |
BHEL, Hyderabad |
2009-06-25 09:06:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6702 |
TENDER FOR PURCHASE OF 4 MT CAPACITY FORKLIFT |
BHEL, Bangalore |
2009-06-25 09:06:00 |
2009-07-07 14:30:00 |
N/A |
| NIT_6701 |
PROVIDING SERVICES OF HLHR CRANE AT 2X250MW TPS BSPCL BINA TPS DIST SAGAR MP |
BHEL, PSWR |
2009-06-24 05:06:00 |
2009-07-10 11:00:00 |
Yes 1 |
| NIT_6700 |
PRESSURE GAUGES |
BHEL, Haridwar |
2009-06-24 03:06:00 |
2009-08-13 14:00:00 |
N/A |
| NIT_6699 |
5TON EOT CRANE |
BHEL, Haridwar |
2009-06-24 01:06:00 |
2009-08-04 00:00:00 |
N/A |
| NIT_6698 |
PROVIDING SERVICES OF 180MT CRAWLER CRANE AT 2X250MW BPSCL BINA TPS DIST SAGAR MP |
BHEL, PSWR |
2009-06-24 01:06:00 |
2009-07-10 11:00:00 |
Yes 1 |
| NIT_6697 |
CNC LATHE SOC 3600MM CD 12000MM |
BHEL, Haridwar |
2009-06-24 01:06:00 |
2009-08-04 14:00:00 |
N/A |
| NIT_6696 |
PROVIDING SERVICES FOR MATERIAL HANDLING AT 4X600MW STPS JINDAL POWER LTD TAMNAR DIST RAIGARH CHATTISGARH |
BHEL, PSWR |
2009-06-24 12:06:00 |
2009-07-16 11:00:00 |
N/A |
| NIT_6695 |
8TON EOT CRANE |
BHEL, Haridwar |
2009-06-24 11:06:00 |
2009-08-04 00:00:00 |
N/A |
| NIT_6694 |
WELDING GENERATOR
415V 3PH 50HZ SUPPLY MOTORGENERATOR TYPE
INVERTER TYPE |
BHEL, PSSR |
2009-06-24 09:06:00 |
2009-07-24 14:30:00 |
N/A |
| NIT_6693 |
ACID CLEANING PUMP 200TONS/HR AND 150T/HR ALONG WITH STANDARD ACCESSORIES |
BHEL, PSSR |
2009-06-24 09:06:00 |
2009-07-24 14:30:00 |
N/A |
| NIT_6692 |
10 TON ELECTRIC WINCH AS PER SPECIFICATION |
BHEL, PSSR |
2009-06-24 09:06:00 |
2009-07-23 14:30:00 |
N/A |
| NIT_6691 |
AIR LEAK TEST BLOWER ALONG WITH STANDARD ACCESSORIES |
BHEL, PSSR |
2009-06-24 09:06:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6690 |
HYDRAULIC TEST PUMP 0-250KG,0-450KG/SQCM AND 0-600KG/SQCM AS PER SPECIFICATION |
BHEL, PSSR |
2009-06-24 08:06:00 |
2009-07-27 14:30:00 |
N/A |
| NIT_6689 |
500KVA ,11KV,415V SKID MOUNTED SUBSTATION |
BHEL, PSSR |
2009-06-24 08:06:00 |
2009-07-20 14:30:00 |
N/A |
| NIT_6688 |
CIVIL AND ARCHITECTURE WORKS RELATED TO BUILDINGS AND FOUNDATIONS WHICH INCLUDES PILING, FOUNDATIONS, EARTH WORK, TG DECK, PLAIN AND REINFORCED CEMENT CONCRETE FOR 2 UNITS OF 500 MW UNITS 6 AND 7 AT ANPARA / D |
BHEL, PSNR |
2009-06-23 07:06:00 |
2009-07-13 15:30:00 |
N/A |
| NIT_6687 |
TECHNICAL SUPPORT FOR BALANCE OF PLANT AND ELECTRICAL SYSTEMS FOR R AND M WORK OF 2X110 MW UNIT 6 AND 7 OF BAARAUNI THERMAL POWER PLANT |
BHEL, Bhopal |
2009-06-22 05:06:00 |
2009-07-13 14:00:00 |
N/A |
| NIT_6686 |
NIT FOR SUPPLY, RECEIPT AT SITE, HANDLING, TRANSPORTATION FROM STORE TO ERECTION SITE, ERECTION, TESTING, COMMISSIONING OF EQUIPMENT AND SYSTEMS FOR CONSTRUCTION POWER DISTRIBUTION SYSTEMS AS WELL AS OPERATION AND MAINTENANCE OF 1X500 MW, BOKARO_A TPP,BOKARO, JHARKHAND |
BHEL, PSER |
2009-06-22 01:06:00 |
2009-07-14 15:00:00 |
N/A |
| NIT_6685 |
SUPPLY OF STORAGE AND RETRIEVAL MACHINE FOR BHEL/TRICHY |
BHEL, Bangalore |
2009-06-22 11:06:00 |
2009-07-13 15:00:00 |
N/A |
| NIT_6684 |
SUPPLY AND SUPERVISION FOR ASSEMPLY AND COMMISSIONING OF 01 NO. 360 MT CAPACITY PORTEL CRANE |
BHEL, PSNR |
2009-06-22 10:06:00 |
2009-08-01 15:30:00 |
N/A |
| NIT_6683 |
TRANSFORMER FOR IMPEDANCE MEASUREMENT OF ROTOR |
BHEL, Haridwar |
2009-06-22 09:06:00 |
2009-08-13 14:00:00 |
N/A |
| NIT_6682 |
PROVIDING LIGHTING IN WALKING TRACK AT AMBEDKAR STADIUM |
BHEL, Hyderabad |
2009-06-20 03:06:00 |
2009-07-15 13:30:00 |
N/A |
| NIT_6681 |
SUPPORT SERVICES FOR MANNING OF MAIN RECEIVING STATION AT TA OFFICE |
BHEL, Hyderabad |
2009-06-20 03:06:00 |
2009-07-15 13:30:00 |
N/A |
| NIT_6680 |
SUPPLY AND ETC OF VCB PANELS, TRANSFORMERS, LTDB, APFC PANELS, BUS DUCT, SECTIONALISING SWITCH PANEL AND CABLE |
BHEL, Haridwar |
2009-06-20 02:06:00 |
2009-08-01 14:00:00 |
N/A |
| NIT_6679 |
SUPPLY AND ETC OF VCB PANELS, TRANSFORMERS, LTDB, APFC PANELS, BUS DUCT, SECTIONALISING SWITCH PANEL AND CABLE |
BHEL, Haridwar |
2009-06-20 02:06:00 |
2009-07-31 14:00:00 |
N/A |
| NIT_6678 |
FLOW METERS |
BHEL, Haridwar |
2009-06-20 11:06:00 |
2009-08-13 14:00:00 |
N/A |
| NIT_6677 |
IMPULSE TESTER |
BHEL, Haridwar |
2009-06-20 11:06:00 |
2009-08-08 14:00:00 |
N/A |
| NIT_6676 |
SURFACE FLATNESS TESTER WITH INDUCTION PROBE |
BHEL, Haridwar |
2009-06-20 11:06:00 |
2009-08-08 14:00:00 |
N/A |
| NIT_6675 |
SURFACE RESISTIVITY TESTER |
BHEL, Haridwar |
2009-06-20 11:06:00 |
2009-08-11 14:00:00 |
N/A |
| NIT_6674 |
TENDER FOR EXTENSION
OF ONE ROOM IN EXISTING
A TYPE QUARTERS AT
I.A. JAGDISHPUR |
BHEL, Jagdishpur |
2009-06-20 11:06:00 |
2009-07-23 15:00:00 |
N/A |
| NIT_6673 |
AC HV KIT-12 KV, 3.0AMP. |
BHEL, Haridwar |
2009-06-20 10:06:00 |
2009-08-11 14:00:00 |
N/A |
| NIT_6672 |
SUPPLY OF CIRCULATING WATER PIPES OF VARIOUS SIZES AS PER IS 3589 FOR PRAGATI PROJECT |
BHEL, Piping Centre |
2009-06-19 05:06:00 |
2009-07-02 11:30:00 |
Yes 1 |
| NIT_6671 |
ELECTRONIC LEVEL INDICATOR |
BHEL, Haridwar |
2009-06-19 04:06:00 |
2009-08-12 14:00:00 |
N/A |
| NIT_6670 |
HIRING OF MINI BUSES FOR 2 YEARS FOR BHEL R AND D, VIKASNAGAR, HYDERABAD |
BHEL |
2009-06-19 04:06:00 |
2009-07-11 14:00:00 |
N/A |
| NIT_6669 |
CONSTRUCTION OF CENTRE OF EXCELLENCE BUILDING INCLUDING INTERIORS FOR COMPRESSORS AND PUMPS AT BHEL R AND D, HYDERABAD |
BHEL |
2009-06-19 03:06:00 |
2009-07-10 14:45:00 |
N/A |
| NIT_6668 |
0-10KV BATTERY OPERATED DIGITAL MEGGER |
BHEL, Haridwar |
2009-06-19 03:06:00 |
2009-08-12 14:00:00 |
N/A |
| NIT_6667 |
RECEIPT UNLOADING AT STORES STORAGE YARD VERIFYING STACKING AND PRESERVATION OF MATERIALS COMPONENTS FOR 1 X 500 MWE MAIN PLANT PACKAGE AT FBRP SITE FOR BHAVINI KALPAKKAM NEAR CHENNAI TAMILNADU |
BHEL, PSSR |
2009-06-18 10:06:00 |
2009-07-09 15:30:00 |
N/A |
| NIT_6666 |
PROCUREMENT OF FORK LIFT 3 TON BATTERY OPERATED |
BHEL, Trichy |
2009-06-18 10:06:00 |
2009-07-25 14:30:00 |
N/A |
| NIT_6665 |
PROCUREMENT OF ELECTRODE DRYING OVEN |
BHEL, Trichy |
2009-06-18 10:06:00 |
2009-07-24 14:30:00 |
Yes 1 |
| NIT_6664 |
PROCUREMENT OF GAUGE BLOCK AND LENGTH BAR |
BHEL, Trichy |
2009-06-18 10:06:00 |
2009-07-23 14:30:00 |
N/A |
| NIT_6663 |
PROCUREMENT OF OPTICAL EQUIPMENT |
BHEL, Trichy |
2009-06-18 10:06:00 |
2009-07-22 14:30:00 |
N/A |
| NIT_6662 |
PROCUREMENT OF PORTABLE HARDNESS TESTER REBOUND TYPE |
BHEL, Trichy |
2009-06-18 10:06:00 |
2009-07-21 14:30:00 |
N/A |
| NIT_6661 |
AUTOMATIC TEST EQUIPMENT |
BHEL, Haridwar |
2009-06-18 08:06:00 |
2009-08-05 14:00:00 |
N/A |
| NIT_6660 |
DAK DISTRIBUTION, HOUSE KEEPING, CUSTOMER HOSPITALITY ETC. |
BHEL, Hyderabad |
2009-06-16 10:06:00 |
2009-06-25 14:00:00 |
N/A |
| NIT_6659 |
MODIFICATION AND RECONDITIONING OF 100 MT HYDRAULIC POWDER COMPACTING PRESS WITH NEW HYDRAULIC POWER PACK, PLC CONTROLS ETC. |
BHEL, Bangalore |
2009-06-15 08:06:00 |
2009-07-06 15:00:00 |
N/A |
| NIT_6658 |
11 KV HT XLPE CABLES |
BHEL, Haridwar |
2009-06-13 02:06:00 |
2009-07-28 14:00:00 |
N/A |
| NIT_6657 |
SELF PROPELLED SCISSOR LIFT |
BHEL, Haridwar |
2009-06-12 02:06:00 |
2009-07-31 14:00:00 |
N/A |
| NIT_6656 |
SUPPLY OF SOCKET WELDED PIPE FITTINGS |
BHEL, Piping Centre |
2009-06-12 11:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6655 |
TENDER OR HOUSE KEEPING SERVICES IN BHEL EMRP PREMISES AND BHEL QUARTERS BUILDINGS AT D N NAGAR AND TILAK NAGAR |
BHEL |
2009-06-12 06:06:00 |
2009-07-04 00:00:00 |
N/A |
| NIT_6654 |
ANNUAL RATE CONTRACT FOR MISC CIVIL WORKS IN TOWNSHIP FOR YEAR 2009-10 |
BHEL, Jhansi |
2009-06-11 03:06:00 |
2009-07-03 13:15:00 |
N/A |
| NIT_6653 |
PIEZOELECTRIC ACCELEROMETER AND ACCESSORIES |
BHEL, Haridwar |
2009-06-11 01:06:00 |
2009-07-29 14:00:00 |
N/A |
| NIT_6652 |
CHARGE AMPLIFIER AND ACCESSORIES, LOW NOISE CABLE, INDUSTRIAL HOUSING CABINET AND ACCESSORIES |
BHEL, Haridwar |
2009-06-11 01:06:00 |
2009-07-30 14:00:00 |
N/A |
| NIT_6651 |
FIBRE OPTIC ACCELEROMETER AND ACCESSORIES |
BHEL, Haridwar |
2009-06-11 01:06:00 |
2009-07-30 14:00:00 |
N/A |
| NIT_6650 |
LEAD IN PLATE FOR PEA |
BHEL, Haridwar |
2009-06-11 01:06:00 |
2009-07-31 14:00:00 |
N/A |
| NIT_6649 |
DATE AQUISITION PCB CARDS, DATA AQUISITION COMPUTER AND ACCESSORIES |
BHEL, Haridwar |
2009-06-11 01:06:00 |
2009-07-31 14:00:00 |
N/A |
| NIT_6648 |
500 KVA DG SET 3 PH, 50C/S , WATER COOLED RADIATOR TYPE, DG SET ALONG WITH STANDARD ACCESSORIES AS PER SPECIFICATION |
BHEL, PSSR |
2009-06-11 10:06:00 |
2009-07-03 14:30:00 |
N/A |
| NIT_6647 |
SUPPLY OF PASSENGER CUM GOODS ELEVATOR RACK AND PINION TYPE CAPACITY 1TON WITH 90 MTR MAST SECTION AND WITH ALL ACCESSORIES |
BHEL, PSSR |
2009-06-11 10:06:00 |
2009-07-02 14:30:00 |
N/A |
| NIT_6646 |
SUPPLY OF BOILER FURNACE MAINTENANCE MOVING PLATFORM WITH ALL ACCESSORIES AS PER SPECIFICATION |
BHEL, PSSR |
2009-06-11 10:06:00 |
2009-07-01 14:30:00 |
Yes 1 |
| NIT_6645 |
NIT FOR SUPPLY, INSTALLATION, DEMONSTRATION AND TRAINING OF EIGHT NO. NON CONTACT THERMOMETER AT BHEL-PSER-KOLKATA |
BHEL, PSER |
2009-06-10 07:06:00 |
2009-06-26 11:00:00 |
N/A |
| NIT_6644 |
ERECTION TESTING AND COMMISSIONING OF CONTROL AND INSTRUMENTATION WORKS AT 2X500MW MSPGCL BHUSAWAL TPS MAHARASTRA |
BHEL, PSWR |
2009-06-10 05:06:00 |
2009-06-26 11:00:00 |
Yes 1 |
| NIT_6643 |
SUPPLY, INSTALLATION, DEMONSTRATION AND TRAINING OF FOUR NOS. DIGITAL SOUND LEVEL METER AT BHEL- PSER- KOLKATA OFFICE |
BHEL, PSER |
2009-06-10 03:06:00 |
2009-06-25 16:00:00 |
Yes 1 |
| NIT_6642 |
NIT FOR SUPPLY, INSTALLATION, DEMONSTRATION AND TRAINING OF FOUR NOS. DIGITAL INSULATION TESTER AT BHEL-PSER-KOLKATA |
BHEL, PSER |
2009-06-10 02:06:00 |
2009-06-25 15:00:00 |
N/A |
| NIT_6641 |
NIT FOR SUPPLY, INSTALLATION, DEMONSTRATION AND TRAINING OF ONE NO. AC HIGH VOLTAGE KIT AT BHEL- PSER-KOLKATA |
BHEL, PSER |
2009-06-10 02:06:00 |
2009-06-25 15:00:00 |
N/A |
| NIT_6640 |
PROVIDING SERVICES FOR MATERIAL HANDLING AND MANAGEMENT AT 2X500MW UNIT 5 AND 6 OF NTPC RIHAND STPS DIST SONEBHADRA UP |
BHEL, PSWR |
2009-06-10 01:06:00 |
2009-07-02 11:00:00 |
Yes 2 |
| NIT_6639 |
PROVIDING SERVICES FOR MATERIAL HANDLING AND MANAGEMENT AT 2X500MW STAGE IV NTPC VINDYACHAL DIST SIDDHI MP |
BHEL, PSWR |
2009-06-10 12:06:00 |
2009-07-02 11:00:00 |
Yes 1 |
| NIT_6638 |
CIVIL WORKS FOR PROVIDING MACHINE FOUNDATION FOR CNC HORIZONTAL BORER MACHINE -II IN TC AND GT BAY EXPANSION |
BHEL, Hyderabad |
2009-06-09 05:06:00 |
2009-07-01 14:30:00 |
N/A |
| NIT_6637 |
CIVIL WORKS FOR PROVIDING MACHINE FOUNDATION FOR CNC HORIZONTAL BORER MACHINE -I IN TC AND GT BAY EXPANSION. |
BHEL, Hyderabad |
2009-06-09 05:06:00 |
2009-07-01 14:30:00 |
N/A |
| NIT_6636 |
SEEKING REGISTERATION OF PROSPECTIVE VENDORS |
BHEL, Bangalore |
2009-06-09 02:06:00 |
2009-08-01 15:00:00 |
N/A |
| NIT_6635 |
RECEIPT OF EQUIPMENT/ MATERIAL AT SITE, UNLOADING, INSPECTION, VERIFICATION, STORAGE, UP-KEEPING DURING STORAGE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 765 KV SUBSTATION AT SEONI IN MADHYA PRADESH |
BHEL, Industry Sector |
2009-06-09 09:06:00 |
2009-06-24 15:30:00 |
N/A |
| NIT_6634 |
EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 765 KV SUBSTATION AT SEONI IN MADHYA PRADESH |
BHEL, Industry Sector |
2009-06-09 09:06:00 |
2009-07-08 15:30:00 |
N/A |
| NIT_6633 |
EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 400/220 KV GIS BUILDINGS, YARD AND CONTROL ROOM BUILDING AND PILING WORKS OF SWITCHYARD AND BUILDINGS AT NORTH CHENNAI IN TAMILNADU |
BHEL, Industry Sector |
2009-06-09 09:06:00 |
2009-07-15 15:30:00 |
Yes 1 |
| NIT_6632 |
REPAIR OF COMPANYS STEEL FURNITURE |
BHEL, Jhansi |
2009-06-02 03:06:00 |
2009-06-23 13:15:00 |
N/A |
| NIT_6631 |
SUPPLY, INSTALLATION, DEMONSTRATION AND TRAINING OF ONE NO. DC HIGH VOLTAGE KIT AT BHEL_ PSER_KOLKATA |
BHEL, PSER |
2009-06-08 02:06:00 |
2009-05-23 11:00:00 |
N/A |
| NIT_6630 |
SUPPLY OF DRY VAN CONTAINER FOR MATERIAL STORAGE AT BHEL SITE _DURGAPUR - 02 NOS AND MEJIA - 01 NO |
BHEL, PSER |
2009-06-08 02:06:00 |
2009-06-23 15:00:00 |
N/A |
| NIT_6629 |
SILICO CALCIUM |
BHEL, Haridwar |
2009-06-08 11:06:00 |
2009-07-11 14:00:00 |
N/A |
| NIT_6628 |
RESIN AND CATALYST |
BHEL, Haridwar |
2009-06-08 11:06:00 |
2009-07-20 00:00:00 |
N/A |
| NIT_6627 |
REFRACTORY OF DIFFERENT SHAPE AND SIZES
FOR FOUNDRY USE. |
BHEL, Haridwar |
2009-06-08 11:06:00 |
2009-06-30 14:00:00 |
N/A |
| NIT_6626 |
REFRACTORY CASTABLE CLASS A FOR STEEL
MELTING SHOP. |
BHEL, Haridwar |
2009-06-08 11:06:00 |
2009-07-06 14:00:00 |
N/A |
| NIT_6625 |
POROUS PLUG GP2 AND GP3 FOR
STEEL MELTING SHOP. |
BHEL, Haridwar |
2009-06-08 11:06:00 |
2009-07-04 14:00:00 |
N/A |
| NIT_6624 |
PNEUMATIC TOOLS |
BHEL, Haridwar |
2009-06-08 10:06:00 |
2009-07-20 00:00:00 |
N/A |
| NIT_6623 |
MANUAL SCARFING / CUTTING TORCHES FOR
USE IN FORGE. |
BHEL, Haridwar |
2009-06-08 10:06:00 |
2009-07-13 00:00:00 |
N/A |
| NIT_6622 |
ISOTHERM TILES FOR USE ION MOULDING |
BHEL, Haridwar |
2009-06-08 10:06:00 |
2009-07-20 00:00:00 |
N/A |
| NIT_6621 |
HEAVY DUTY GOUGING ELECTRODE HOLDER
FOR 1000 AMP. |
BHEL, Haridwar |
2009-06-08 10:06:00 |
2009-07-18 00:00:00 |
N/A |
| NIT_6620 |
GRAPHITE POWDER FOR EAF |
BHEL, Haridwar |
2009-06-08 10:06:00 |
2009-07-04 00:00:00 |
N/A |
| NIT_6619 |
GRAPHITE ELECTRODES OF 200-50 MM DIA
FOR EAF. |
BHEL, Haridwar |
2009-06-08 09:06:00 |
2009-06-30 14:00:00 |
N/A |
| NIT_6618 |
FERRO TITANIUM |
BHEL, Haridwar |
2009-06-08 09:06:00 |
2009-07-07 14:00:00 |
N/A |
| NIT_6617 |
FERRO SILICON BASED ADDITIVE FOR SODIUM
SILICATE BASED SYSTEM OF MOULDING. |
BHEL, Haridwar |
2009-06-08 09:06:00 |
2009-07-18 00:00:00 |
N/A |
| NIT_6616 |
DRY RAMMING MASS FOR EAF FOR STEEL
MELTING SHOP. |
BHEL, Haridwar |
2009-06-08 09:06:00 |
2009-07-06 00:00:00 |
N/A |
| NIT_6615 |
ALKALINE RESIN AND CATALYST FOR USE IN
MOULDING. |
BHEL, Haridwar |
2009-06-08 09:06:00 |
2009-06-30 00:00:00 |
N/A |
| NIT_6614 |
BURNT LIME |
BHEL, Haridwar |
2009-06-06 04:06:00 |
2009-06-24 14:00:00 |
N/A |
| NIT_6613 |
GOUGING ELECTRODES
DIA 12 X 350 MM
SPECN.NO. FF77185 REV.03 |
BHEL, Haridwar |
2009-06-06 04:06:00 |
2009-07-01 14:00:00 |
N/A |
| NIT_6612 |
IRON POWDER AS PER SPECN.
NO. FF06003 REV.01 |
BHEL, Haridwar |
2009-06-06 04:06:00 |
2009-07-02 14:00:00 |
N/A |
| NIT_6611 |
FF1931011010
DIA 865 X 765
L J HOUSING AND FF1931011125
DIA 865/DIA 330 X 480
UJ HOUSING |
BHEL, Haridwar |
2009-06-06 04:06:00 |
2009-07-07 14:00:00 |
N/A |
| NIT_6610 |
M.S. PIPE 8 MM
MEDIUM CLASS WALL THK. 2.3
MM MS PIPE 8 MM DIA AND M.S. PIPE 20 MM
SPECIFICATION DIA 20 MM NB-MEDIUM CLASS |
BHEL, Haridwar |
2009-06-06 04:06:00 |
2009-06-25 14:00:00 |
N/A |
| NIT_6609 |
FF5331493017
REFRACTORY CASTABLE
SPECN.FF05025 REV.01
CLASS A |
BHEL, Haridwar |
2009-06-06 04:06:00 |
2009-06-30 14:00:00 |
N/A |
| NIT_6608 |
HANDING OVER OF RAW MATERIALS AND COLLECTION OF FINISHED COMPONENTS FROM MSA VENDORS |
BHEL, Ranipet |
2009-06-06 04:06:00 |
2009-07-08 14:30:00 |
Yes 2 |
| NIT_6607 |
CIVIL WORKS FOR PROVIDING MACHINE FOUNDATIONS I AND II IN TC AND GT BAY EXPANSION -TENDER NOTICE |
BHEL, Hyderabad |
2009-06-06 11:06:00 |
2009-07-01 14:30:00 |
N/A |
| NIT_6606 |
HIRING OF MOBILE CRANE 10 T CAPACITY-1 NO. FOR USE OF MATERIAL HANDLING AND MOVEMENT BY BHEL, CMM-STORES DEPT. |
BHEL, Hyderabad |
2009-06-06 10:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6605 |
HIRING OF DIESEL FORKLIFT 3 T CAPACITY-1 NO. FOR USE OF MATERIAL MOVEMENT BY BHEL, CMM-STORES DEPT. FOR A PERIOD OF ONE YEAR |
BHEL, Hyderabad |
2009-06-06 09:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6604 |
HIRING OF DIESEL FORKLIFT 5 T CAPACITY - 1 NO. FOR USE OF MATERIAL MOVEMENT BY BHEL, CMM-STORES DEPT. FOR A PERIOD OF ONE YEAR. |
BHEL, Hyderabad |
2009-06-06 09:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6603 |
SUPPLY OF SELF LOADING AND UNLOADING TRUCK VEHICLE SIDE FORK LIFT ON HIRE BASIS |
BHEL, Hyderabad |
2009-06-06 09:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6602 |
SUPPLY OF SELF LOADING AND UNLOADING TRUCK VEHICLE LIFT AND SHIFT ON HIRE BASIS |
BHEL, Hyderabad |
2009-06-06 09:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6601 |
MATERIAL HANDLING AND GAS CUTTING OF STEEL PLATES IN 12 STORES-CMM FOR 12MONTHS. |
BHEL, Hyderabad |
2009-06-06 08:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6600 |
OFF-LOADING OF ASSISTING WORKS IN RECEIPT AREA OF 11 STORES. |
BHEL, Hyderabad |
2009-06-06 08:06:00 |
2009-06-27 14:30:00 |
N/A |
| NIT_6599 |
OFF-LOADING THE WORKS OF MATERIAL HANDLING AND PAINTING AT RECEIPTS IN 12 STORES. |
BHEL, Hyderabad |
2009-06-06 08:06:00 |
2009-07-27 14:30:00 |
N/A |
| NIT_6598 |
MATERIAL HANDLING AND PAINTING WORKS IN 41 INTEGRATED STORES AND 26 AND 28 STORES FOR THE PERIOD ONE YEAR |
BHEL, Hyderabad |
2009-06-06 08:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6597 |
HANDLING MATERIALS RECEIVED FROM VARIOUS SITES AS SITE RETURN MATERIALS FOR THE PERIOD OF ONE YEAR |
BHEL, Hyderabad |
2009-06-06 08:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6596 |
MATERIAL HANDLING, SEGREGATION OF SCRAP MAKING INTO LOTS AND SURPLUS MATERIAL IN SCRAP YARD AND SURPLUS STORES 32 AND 98 FOR THE PERIOD OF ONE YEAR |
BHEL, Hyderabad |
2009-06-06 08:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6595 |
PAINTING JOBS AT 41 STORES RECEIPTS ON WORKS CONTRACT BASIS FOR THE PERIOD OF ONE YEAR. |
BHEL, Hyderabad |
2009-06-05 02:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6594 |
UNLOADING WITH CRANE BY SLINGING, SHIFTING BY BATTERY TRUCKS AND FORK LIFTS AND STACKING OF CONSIGNMENTS RECEIVED THROUGH MINI TRUCKS, LORRIES, OPEN TRUCKS AND TRAILER |
BHEL, Hyderabad |
2009-06-05 02:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6593 |
CONTRACT FOR JOB WORKS FOR UNLOADING, SHIFTING, STACKING OF SITE RETURN, FOUNDRY AND OTHER MISCELLANEOUS STORES MATERIALS RECEIVED THROUGH LORRIES AND TRAILORS |
BHEL, Hyderabad |
2009-06-05 02:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6592 |
OF -LOADING OF DAK DISTRIBUTION, HOUSE KEEPING AND 5S ACTIVITIES AND CUSTOMER HOSPITALITY NATURE OF WORKS IN STORES-CMM AND STORES COLLECTION CELL FOR A PERIOD OF ONE YEAR. |
BHEL, Hyderabad |
2009-06-05 01:06:00 |
2009-06-26 14:30:00 |
N/A |
| NIT_6591 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK ERECTION TESTING AND COMMISSIONING OF HP POWER CYCLE PIPING LP PIPING FOR SG TG AND ITS ACCESSORIES HANGERS SUPPORTS VALVES ASSOCIATED EQUIPMENTS SYSTEMS INCLUDING SUPPLY APPLICATION OF FINAL PAINTING FOR UNIT 11 OF 1X500MW SET AT KOTHAGUDEM TPS KOTHAGUDEM KHAMMAM DIST ANDHRAPRADESH |
BHEL, PSSR |
2009-06-05 01:06:00 |
2009-06-26 16:30:00 |
N/A |
| NIT_6590 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK ERECTION TESTING AND COMMISSIONING OF POWER CYCLE PIPING AND AUXILIARY PIPING FOR SG TG AND ITS ACCESSORIES HANGERS SUPPORTS VALVES ASSOCIATED EQUIPMENTS SYSTEMS INCLUDING SUPPLY APPLICATION OF FINAL PAINTING FOR UNIT 5 OF 1X210MW SET AT RAYALASEEMA TPP, V V REDDYNAGAR MUDDANUR CUDDAPAH DISTRICT ANDHRAPRADESH |
BHEL, PSSR |
2009-06-05 01:06:00 |
2009-06-26 15:30:00 |
N/A |
| NIT_6589 |
PLYING OF BUSES FOR EMPLOYEE SCHOOL GOING CHILDREN AND SUNDAY HOLIDAY TRIP FOR EMPLOYEES AND THEIR FAMILY MEMBERS |
BHEL, Jhansi |
2009-06-05 10:06:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6588 |
SUPPLY OF FLATTENING M/C AS PER TENDER SPECIFICATIONS. |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6587 |
SUPPLY OF EDGE MILLING M/C AS PER TENDER SPECIFICATIONS. |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6586 |
SUPPLY OF MIG/MAG WELDING M/C AS PER TENDER SPECIFICATIONS. |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6585 |
SUPPLY OF WELDING MANIPULATOR 20 T AS PER TENDER SPECIFICATIONS |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6584 |
SUPPLY OF ELECTRO SLAG WELDING M/C AS PER TENDER SPECIFICAIONS. |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 2 |
| NIT_6583 |
SUPPLY OF VERTICAL BORING MACHINE 2.5 M AS PER TENDER SPECIFICATIONS |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6582 |
SUPPLY OF PORTABLE UNIVERSAL RADIAL DRILLING M/C AS PER TENDER SPECIFICATIONS |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 10:00:00 |
Yes 1 |
| NIT_6581 |
SUPPLY OF VERTICAL BORING MACHINE 4.5 M AS PER TENDER SPECIFICATIONS |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6580 |
SUPPLY OF WELDING MANIPULATOR 10T AS PER TENDER SPECIFICATIONS. |
BHEL, Jagdishpur |
2009-06-05 10:06:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6579 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK ERECTION TESTING AND COMMISSIONING OF 67.5MW STG WITH AUXILIARIES AND 1NO TURBOBLOWER WITH ITS AUXILIARIES INCLUDING SUPPLY APPLICATION OF FINAL PAINTING FOR STG UNIT 5 STG 5 AND TURBO BLOWER UNIT 4 TB 4 AT RASHTRIYA ISPAT NIGAM LTD VISAKHAPATNAM STEEL PLANT RINL VSP CPP EXPANSION VISAKHAPATNAM ANDHRA PRADESH |
BHEL, PSSR |
2009-06-04 04:06:00 |
2009-06-25 15:30:00 |
N/A |
| NIT_6578 |
MOVEMENT OF RAW MATERAILS FROM BHEL RC PURAM TO SUB-CONTRACTORS SITUATED IN AND AROUND TWIN CITIES |
BHEL, Hyderabad |
2009-06-04 02:06:00 |
2009-06-12 14:30:00 |
N/A |
| NIT_6577 |
DESIGN SUPPLY ERECTION AND COMMISSIONING OF 2X2.5 MW DE SETS WITH ACCESSORIES AND CONTROL PANEL FOR PIPAVAV GUJRAT |
BHEL, Bangalore |
2009-06-04 02:06:00 |
2009-06-25 15:00:00 |
N/A |
| NIT_6576 |
VARIOUS TYPE OF TRANSPORTATION, , LOADING, UNLOADING, SHIFTING, STACKING, PACKING AND COLLECTION OF MATERIALS FROM TRANSPORTER GODOWN/RAILWAY GODOWN ,JWALAPUR/HARIDWAR, CLEANING OF STORES AREA, ASSISTANCE IN RECEIPT AND UNLOADING OF LDO RAKES ETC. |
BHEL, Haridwar |
2009-06-04 11:06:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6575 |
RE-ORGANISATION OF MATERIALS FROM ONE PLACE TO ANOTHER NEAR BY PLACE AND CLEANING OF COMPONENTS AT TC GT STORES DEPT. DURING 2009-10 |
BHEL, Hyderabad |
2009-06-03 02:06:00 |
2009-06-19 13:30:00 |
N/A |
| NIT_6574 |
DEVELOPMENT SUPPLY AND IMPLEMENTATION OF ENGINEERING DATA MANAGEMENT SYSTEM |
BHEL, Jhansi |
2009-06-03 02:06:00 |
2009-07-17 14:00:00 |
N/A |
| NIT_6573 |
CNC ROTOR SLOT MILLING MACHINE |
BHEL, Haridwar |
2009-06-03 02:06:00 |
2009-07-24 14:00:00 |
N/A |
| NIT_6572 |
SUPPLY OF VEGITABLE IN CANTEEN FOR THE YEAR 2009-10 |
BHEL, Jhansi |
2009-06-03 12:06:00 |
2009-06-16 14:00:00 |
Yes 1 |
| NIT_6571 |
ERECTION, TESTING, COMMISSIONING, TRIAL OPERATION AND HANDING OVER OF 2 X 250 MW STG WITH RELATED AUXILIARIES AND PIPING AT 1500 MW PRAGATI III CCPP OF PRAGATI POWER CORPORATION AT BAWANA, DELHI. |
BHEL, PSNR |
2009-06-03 10:06:00 |
2009-06-29 15:30:00 |
Yes 1 |
| NIT_6570 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF TG SETS AT 2X250 MW HARDUAGANJ UNITS 8 AND 9, ALIGARH , UP. |
BHEL, PSNR |
2009-06-02 04:06:00 |
2009-06-29 15:30:00 |
Yes 1 |
| NIT_6569 |
VIBRO FINISHING MACHINE |
BHEL, Haridwar |
2009-06-02 04:06:00 |
2009-07-23 14:00:00 |
N/A |
| NIT_6568 |
CERRO BAND MACHINE |
BHEL, Haridwar |
2009-06-02 04:06:00 |
2009-07-22 14:00:00 |
N/A |
| NIT_6567 |
CNC 5 AXIS SINGLE SPINDLE MILLING MACHINE |
BHEL, Haridwar |
2009-06-02 04:06:00 |
2009-07-22 14:00:00 |
N/A |
| NIT_6566 |
DISTRIBUTION OF PRODUCTION LINKED DOCUMENTS TO VARIOUS DEPARTMENTS IN THE UNIT
CARBON REMOVAL, HOUSE KEEPING AND 5 S ACTIVITIES
DUSTING AND CLEANING OF MACHINES AND FURNITURE IN THE INFORMATICS CENTRE
CUSTOMER HOSPITALITY SERVICES |
BHEL, Hyderabad |
2009-06-02 01:06:00 |
2009-06-17 15:00:00 |
N/A |
| NIT_6565 |
SUPPLY OF OPC GR. 43 CEMENT TO F.O.R CHENNAI PORT BASIS, REQUIRED FOR BHEL KOSTI SITE, SUDAN. |
BHEL, PSNR |
2009-06-02 10:06:00 |
2009-06-16 15:30:00 |
Yes 1 |
| NIT_6564 |
WORKS CONTRACT FOR
BLASTING AND PAINTING. |
BHEL, Hyderabad |
2009-06-01 02:06:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6563 |
TRANSPORTATION OF MATERIALS WITHIN SSTP BY TRAILERS AS DIRECTED INCLUDING LOADING AND UNLOADING OPERATIONS |
BHEL, Trichy |
2009-05-30 03:05:00 |
2009-06-15 14:30:00 |
N/A |
| NIT_6562 |
OCCUPYING HOUSING PROPERTY ON LEASE BASIS FOR TRANSIT FLAT |
BHEL, Ranipet |
2009-05-29 04:05:00 |
2009-06-08 16:00:00 |
N/A |
| NIT_6561 |
REWINDING OF MOTORS IN BHEL JHANSI |
BHEL, Jhansi |
2009-05-29 02:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6560 |
LANDSCAPPING AND HORTICULTURE WORK AT JAGDISHPUR |
BHEL, Jagdishpur |
2009-05-28 11:05:00 |
2009-06-19 15:00:00 |
N/A |
| NIT_6559 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF FIRE FIGHTING SYSTEM |
BHEL, Jagdishpur |
2009-05-28 11:05:00 |
2009-06-19 15:00:00 |
N/A |
| NIT_6558 |
CONSTRUCTION OF BORE WELL, TANK AND OTHER REQUIREMENTS FOR INSTALLING FIRE FIGHTING SYSTEM AT JAGDISHPUR |
BHEL, Jagdishpur |
2009-05-28 11:05:00 |
2009-06-19 15:00:00 |
N/A |
| NIT_6557 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LOCAL AREA NETWORKING LAN SYSTEM |
BHEL, Jagdishpur |
2009-05-28 11:05:00 |
2009-07-04 15:00:00 |
Yes 1 |
| NIT_6556 |
SUPPLY , INSTALLATION, TESTING AND COMMISSIONING OF DIGITAL EPABX SYSTEM |
BHEL, Jagdishpur |
2009-05-28 11:05:00 |
2009-06-19 15:00:00 |
N/A |
| NIT_6555 |
PURCHASE OF THALIES |
BHEL, New Delhi |
2009-05-29 01:05:00 |
2009-06-15 03:00:00 |
N/A |
| NIT_6554 |
FABRICATION ERECTION OF STRUCTURAL STEEL IN
POWER HOUSE MILL BUNKER BAY AUX BUILDINGS
AND PIPE RACK ETC FOR UNIT2 OF 2X 600 MW TPS
AT NORTH CHENNAI TPS ATHIPATTU TAMIL NADU |
BHEL, PSSR |
2009-05-28 12:05:00 |
2009-06-18 15:30:00 |
N/A |
| NIT_6553 |
HIRING OF 100MT CRAWLER CRANE FOR DEPLOYMENT AT JHAJJAR SITE OF POWER SECTOR NORTHERN REGION. |
BHEL, PSNR |
2009-05-28 11:05:00 |
2009-06-06 15:30:00 |
N/A |
| NIT_6552 |
THREE DIMENSIONAL THERMO HYDRAULIC DESIGN OF 700 MWE
PHWR TYPE STEAM GENERATOR |
BHEL, Trichy |
2009-05-28 10:05:00 |
2009-07-15 14:30:00 |
N/A |
| NIT_6551 |
CONSTRUCTION AND DEVELOPMENT OF STORE SHEDS AND YARD AT RAMPUR,HEP VILLAGE BAYAL OPPOSITE DUTTANAGR, DISTT. SHIMLA, HIMACHAL PRADESH |
BHEL, PSNR |
2009-05-28 10:05:00 |
2009-06-17 15:30:00 |
Yes 1 |
| NIT_6550 |
SUPPLY OF FORGED PIPE FITTINGS AND STUBS |
BHEL, Piping Centre |
2009-05-27 11:05:00 |
2009-06-10 14:30:00 |
N/A |
| NIT_6549 |
ERECTION OF DSL SYSTEM IN EXTENDED BAYS- 375 RUNNING METERS. |
BHEL, Hyderabad |
2009-05-27 09:05:00 |
2009-06-04 13:30:00 |
N/A |
| NIT_6548 |
CIVIL WORKS FOR RETROFIT ESP, ESP, ID FAN AND DUCT FOUNDATIONS, FLOORING BELOW ESP, CONTROL ROOM AND CABLE TRENCH ETC., IN APGENCO RTS B STATION, RAMAGUNDAM TPS 62.50 MW AND AP |
BHEL, Ranipet |
2009-05-26 04:05:00 |
2009-06-17 14:30:00 |
Yes 1 |
| NIT_6547 |
SUPPLY OF ELECTRONIC WEIGHING SCALES |
BHEL, Bangalore |
2009-05-26 09:05:00 |
2009-06-12 13:30:00 |
N/A |
| NIT_6546 |
WATCH AND WARD AND OPERATION OF OXIDATION POND IN TOWNSHIP FOR THE PERIOD OF TWELVE MONTHS. |
BHEL, Jhansi |
2009-05-25 02:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6545 |
DIGITAL COLOR FLOW ULTRASOUND SYSTEM |
BHEL, Haridwar |
2009-05-25 02:05:00 |
2009-07-14 14:00:00 |
N/A |
| NIT_6544 |
NIT FOR RECEIPT OF MATERIALS, HANDLING AT SITE/ STORAGE YARD/ STORES, TRANSPORTATION TO SITE OF WORK, PRE-ASSEMBLY, ERECTION, TESTING, GROUTING OF COLUMNS / ROTATING EQUIPMENTS, ALIGNMENT, WELDING, NDT, TESTING COMMISSIONING AND HANDING OVER OF STEAM TURBINE AND AUX ETC OF 2X500 MW UNIT-1 AND 2 AT KODERMA TPP, KODERMA, JHARKHAND. |
BHEL, PSER |
2009-05-25 01:05:00 |
2009-06-15 15:00:00 |
Yes 1 |
| NIT_6543 |
NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF SEVEN NOS. -07- HEAVY LIFT LATTICE BOOM CRAWLER CRANE AS PER TENDER SPECIFICATION |
BHEL, PSER |
2009-05-25 12:05:00 |
2009-06-16 15:00:00 |
Yes 1 |
| NIT_6542 |
STATOR CORE HEATING INSTALLATION |
BHEL, Haridwar |
2009-05-25 09:05:00 |
2009-07-16 14:00:00 |
Yes 1 |
| NIT_6541 |
NIT FOR SUPPLY OF 1000KV AC RMS, 1A, 50HZ, TEST TRANSFORMER AS PER ATTACHED SPECIFICATIONS |
BHEL |
2009-05-24 04:05:00 |
2009-06-18 14:00:00 |
N/A |
| NIT_6540 |
NIT FOR SUPPLY OF SOFTWARE TOOLS FOR NS9360 CPU - 2 SETS |
BHEL |
2009-05-24 04:05:00 |
2009-06-09 14:00:00 |
N/A |
| NIT_6539 |
NIT FOR SUPPLY OF TWO NOS OF MAGNETIC FLOW METER AS PER ATTACHED SPECIFICATIONS |
BHEL |
2009-05-24 04:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6538 |
NIT FOR SUPPLY OF ADHESION TESTER AS PER ATTACHED SPECIFICATIONS |
BHEL |
2009-05-24 04:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6537 |
SUPPLY OF 3 NOS OF HIGH END ENGINEERING GRAPHICS WORKSTATION AS PER ATTACHED SPECIFICATIONS |
BHEL |
2009-05-24 04:05:00 |
2009-06-09 14:00:00 |
N/A |
| NIT_6536 |
FABRICATION WORK IN TOWNSHIP FOR THE PERIOD OF TWELVE MONTHS. |
BHEL, Jhansi |
2009-05-23 03:05:00 |
2009-06-12 14:00:00 |
N/A |
| NIT_6535 |
RENOVATION OF BASKET BALL COURT IN TOWNSHIP FOR YEAR 2009-10. |
BHEL, Jhansi |
2009-05-23 03:05:00 |
2009-06-12 14:00:00 |
N/A |
| NIT_6534 |
HPSV LAMP FITTINGS 250W HIGH PRESSURE SODIUM LAMP
DELY REQD IN AUG AND OCT 09 |
BHEL, Jhansi |
2009-05-22 02:05:00 |
2009-06-12 14:00:00 |
N/A |
| NIT_6533 |
SUPPLY OF CIRCLIP AS PER SPEC NO. BA56055 |
BHEL, Hyderabad |
2009-05-22 02:05:00 |
2009-06-09 14:00:00 |
N/A |
| NIT_6532 |
CONSTRUCTION AND DEVELOPMENT OF SITE OFFICE AT CHUTAK HEP, DISTT. KARGIL, J AND K |
BHEL, PSNR |
2009-05-22 01:05:00 |
2009-06-15 15:30:00 |
N/A |
| NIT_6531 |
SUPPLY OF 50/10 TON EOT CRANE |
BHEL, Haridwar |
2009-05-22 01:05:00 |
2009-07-14 14:00:00 |
N/A |
| NIT_6530 |
SUPPLY OF 50/10 TON EOT CRANE |
BHEL, Haridwar |
2009-05-22 01:05:00 |
2009-07-14 14:00:00 |
N/A |
| NIT_6529 |
700MM-30INCH SWEEP WALL COLUMN MOUNTED INDUSTRIAL HEAVY DUTY MAN COOLER FAN COMPLETE WITH CAST AL ALLOY DYNAMICALLY BALANCED IMPELLER 2HP 1440RPM 415V 50HZ AC
SUPPLY CONFIRMING TO IS 6272 VERTICALLY ADJUSTMENT 45DEGREE AND HORIZONTALLY ADJUSTMENT 180 DEGREE MOTOR SHOULD BE BHARAT BIJLEE GEC KHAITAN ALMONARD MAKE ONLY DOL STARTER BE L AND T MAKE MK 1 STARTER ONLY
DELY REQD IN SEP AND OCT 09
DEALERSHIP CERTIFICATE IS TO FURNISHED ALONGWITH THE OFFER
QTY 140NOS |
BHEL, Jhansi |
2009-05-22 01:05:00 |
2009-06-12 14:00:00 |
N/A |
| NIT_6528 |
SUPPLY OF 150/30 TON EOT CRANE |
BHEL, Haridwar |
2009-05-22 11:05:00 |
2009-07-14 14:00:00 |
N/A |
| NIT_6527 |
SUPPLY INSTALLATION AND TESTING OF EARTHING SYSTEM PIT IN DIFFERENT AREA
DELY REQD IN SEP AND OCT 09 |
BHEL, Jhansi |
2009-05-22 11:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6526 |
FLOOR MOUNTED SUB BOARD WITH TRIPPLE POLE SWITCHES
DELY REQD IN SEP AND 09 |
BHEL, Jhansi |
2009-05-22 11:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6525 |
INDOOR METAL CLAD VACUUM SWITCHGEAR SUITABLE FOR 11KV 3 PHASE 50HZ WITH 400AMP
DELY REQD IN SEP AND OCT 09 |
BHEL, Jhansi |
2009-05-22 11:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6524 |
SUPPLY OF MECH LATCHING CLAMPS |
BHEL, Bangalore |
2009-05-22 10:05:00 |
2009-06-12 13:30:00 |
N/A |
| NIT_6523 |
1- L T INCOMER PANEL COMPLETE WITH 4 POLE 1600AMP QTY-03NOS
2- L T OUTGOING PANEL COMPLETE WITH 4 POLE 800 AMP QTY-10NOS
DELY REQD IN SEPTEMBER AND OCTOBER 09 |
BHEL, Jhansi |
2009-05-22 10:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6522 |
PRE-BID TIE UP FOR EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 400/220 KV SUBSTATION AT LONIKHAND IN MAHARASHTRA |
BHEL, Industry Sector |
2009-05-22 09:05:00 |
2009-06-02 15:30:00 |
N/A |
| NIT_6521 |
SERVICES FOR WINDING SHOP AND SHIPPING SHOP |
BHEL, Jhansi |
2009-05-22 09:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6520 |
SUPPLY OF MOTOR AS PER SPEC NO. BA53147 |
BHEL, Hyderabad |
2009-05-22 09:05:00 |
2009-06-02 11:00:00 |
N/A |
| NIT_6519 |
DESIGN MANUFACTURING SUPPLY ERECTION AND COMMISSIONING OF 3KL TRANSFORMER OIL FILTRATION PLANT DELY REQD IN SEP 09 |
BHEL, Jhansi |
2009-05-21 11:05:00 |
2009-06-16 14:00:00 |
N/A |
| NIT_6518 |
3MT DEISEL OPERATED FORK LIFT TRUCK DELY REQD IN JUNE 09 |
BHEL, Jhansi |
2009-05-21 11:05:00 |
2009-06-12 14:00:00 |
N/A |
| NIT_6517 |
DESIGN MANUFACTURING SUPPLY ERECTION AND COMMISSIONING OF
50T 02NOS
20T 01NOS
10T 02NOS
TOTAL 04 ITEMS
DELY REQD IN SEP 09 |
BHEL, Jhansi |
2009-05-21 11:05:00 |
2009-06-19 14:00:00 |
N/A |
| NIT_6516 |
CNC VERTICAL MILLING MACHINE DELY REQD IN OCT 10
THIS ENQUIRY IS FLOATED FOR PREQUALIFICATION OF VENDORS ONLY BIDDERS ARE REQUIRED TO SUBMIT THEIR TECHNICAL BIDS ONLY PRICE BIDS ARE NOT TO BE SUBMITTED |
BHEL, Jhansi |
2009-05-21 10:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6515 |
CNC PIPE BENDING MACHINE DELY REQD IN SEP 09
THIS ENQUIRY IS FLOATED FOR PREQUALIFICATION OF VENDORS ONLY BIDDERS ARE REQUIRED TO SUBMIT THEIR TECHNICAL BIDS ONLY PRICE BIDS ARE NOT TO BE SUBMITTED |
BHEL, Jhansi |
2009-05-21 10:05:00 |
2009-06-19 14:00:00 |
N/A |
| NIT_6514 |
STRESS RELIVING FURNACE DELY REQD IN NOV 09 THIS ENQUIRY IS FLOATED FOR PREQUALIFICATION OF VENDORS ONLY BIDDERS ARE REQUIRED TO SUBMIT THEIR TECHNICAL BIDS ONLY PRICE BIDS ARE NOT TO BE SUBMITTED |
BHEL, Jhansi |
2009-05-21 10:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6513 |
RADIAL ARM DRILLING MACHINE DELY REQD IN MAY 10
THIS ENQUIRY IS FLOATED FOR PREQUALIFICATION OF VENDORS ONLY BIDDERS ARE REQUIRED TO SUBMIT THEIR TECHNICAL BIDS ONLY PRICE BIDS ARE NOT TO BE SUBMITTED |
BHEL, Jhansi |
2009-05-21 10:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6512 |
WHEEL FORCING PRESS MACHINE
DELY REQD IN MAY 10
THIS ENQUIRY IS FLOATED FOR PREQUALIFICATION OF VENDORS ONLY
BIDDERS ARE REQUIRED TO SUBMIT THEIR TECHNICAL BIDS ONLY PRICE BIDS ARE NOT TO BE SUBMITTED |
BHEL, Jhansi |
2009-05-21 10:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6511 |
BOGIE MACHINING CENTRE DELY REQD IN JULY 10 THIS ENQUIRY IS FLOATED FOR PREQUALIFICATION OF VENDORS ONLY BIDDERS ARE REQUIRED TO SUBMIT THEIR TECHNICAL BIDS ONLY PRICE BIDS ARE NOT TO BE SUBMITTED |
BHEL, Jhansi |
2009-05-21 09:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6510 |
CLEANING OF O.H. WATER TANKS IN RESIDENTIAL AND PUBLIC BUILDING IN TOWNSHIP FOR YEAR 2009-10. |
BHEL, Jhansi |
2009-05-21 08:05:00 |
2009-06-12 14:00:00 |
N/A |
| NIT_6509 |
TORSIONALLY STIFF FLEXIBLE SHAFT COUPLING |
BHEL, Haridwar |
2009-05-20 02:05:00 |
2009-07-07 14:00:00 |
N/A |
| NIT_6508 |
MAINTENANCE OF ELECTRIC SUBMERSIBLE MOTOR PUMP SET AND CENTRIFUGAL BOOSTER PUMPS FOR WATER SUPPLY IN TOWNSHIP FOR THE PERIOD OF TWELVE MONTHS. |
BHEL, Jhansi |
2009-05-19 11:05:00 |
2009-06-09 14:00:00 |
N/A |
| NIT_6507 |
CLEANING OF ALL WELLS AND OVER HEAD AND UNDER GROUND WATER STORAGE TANKS FOR WATER SUPPLY FOR YEAR 2009-10. |
BHEL, Jhansi |
2009-05-19 10:05:00 |
2009-06-05 14:00:00 |
N/A |
| NIT_6506 |
SUPPLY OF CANTEEN FOOD |
BHEL, ROD |
2009-05-11 10:05:00 |
2009-06-02 00:00:00 |
N/A |
| NIT_6505 |
SUPPLY OF STAINLESS STEEL STRIPS AS PER SPECIFICATION SA240 TYPE 409 |
BHEL, Trichy |
2009-05-19 10:05:00 |
2009-06-12 14:30:00 |
Yes 1 |
| NIT_6504 |
SUPPLY OF CARBON STEEL STRIPS AS PER IS 513 GR EDD |
BHEL, Trichy |
2009-05-19 10:05:00 |
2009-06-12 14:30:00 |
Yes 1 |
| NIT_6503 |
TRANSPORTATION OF CONSIGNMENT TO ALL DESTINATIONS IN INDIA FROM ANYWHERE TO ANYWHERE SUCH AS MACHINERY, RAW MATERIALS, FABRICATED ITEMS, CASTINGS, FORGINGS, COMPONENTS, HARDWARE ITEMS, CONSUMABLES, SCRAP ETC. BY CLOSE/OPEN BODY TRUCKS/TAURUS, MINI TRUCKS, TRAILERS AS PER GROUPS GIVEN AT CLAUSE 3.8.6 ANNEXURE-A |
BHEL, Varanasi |
2009-05-18 04:05:00 |
2009-06-08 15:00:00 |
N/A |
| NIT_6502 |
NIT FOR RECEIPT OF MATERIALS, HANDLING AT SITE/STORAGE YARD/STORES, TRANSPORTATION TO SITE OF WORK, PRE-ASSEMBLY, ERECTION, TESTING, GROUTING OF COLUMNS/ROTATING EQUIPMENTS, ALIGNMENT, WELDING, NDT, TESTING COMMISSIONING AND HANDING OVER OF STEAM TURBINE AND AUX ETC OF 2X525 MW UNIT-1 AND 2 AT MAITHON RIGHT BANK PROJECT, MAITHON, JHARKHAND |
BHEL, PSER |
2009-05-18 03:05:00 |
2009-06-09 15:00:00 |
Yes 1 |
| NIT_6501 |
NIT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF TEN NOS. HYDRAULIC CRAWLER CRANES FOR BHEL SITES |
BHEL, PSER |
2009-05-18 09:05:00 |
2009-06-09 15:00:00 |
Yes 1 |
| NIT_6500 |
CONSTRUCTION OF CLOSED STORAGE SHEDS WITH AND WITHOUT OFFICE,SEMI CLOSED STORAGE SHEDS WITH INTERNAL,EXTERNAL ELECTRIFICATION OF STORES AND CONSTRUCTION OF PRECAST CONCRETE BLOCK FOR PORTA CABIN OFFICE AT 2X250 MW, BTG PROJECT,BINA POWER SUPPLY COMPANY LTD. BPSCL ,BINA , M P |
BHEL, PSWR |
2009-05-18 09:05:00 |
2009-06-09 11:00:00 |
N/A |
| NIT_6499 |
CONSTRUCTION OF PRECAST CONCRETE BLOCK AND TOILET BLOCK FOR PORTA CABIN OFFICE, CLOSED STORAGE SHEDS, SEMI CLOSED STORAGE SHEDS, DEVELOPMENT OF OPEN STORAGE YARD, ROADS, FENCING, DRAINAGE, INTERNAL , EXTERNAL ELECTRIFICATION OF OFFICE, STORES AND YARD AREAS AT1X270 MW TPP BELA, IDEAL ENERGY PROJECT LTD. ,IEPL, DISTT. NAGPUR, MAHARASTRA |
BHEL, PSWR |
2009-05-18 09:05:00 |
2009-06-09 11:00:00 |
N/A |
| NIT_6498 |
CONSTRUCTION OF CLOSED STORAGE SHEDS, SEMI-CLOSED STORAGE SHEDS, PRE-CAST CONCRETE BLOCK FOR PORTA CABIN OFFICE , SEWERAGE SYSTEMS, DEVELOPMENT OF OPEN STORAGE YARD, SECURITY CABIN ,ROADS, FENCING, DRAINAGE, INTERNAL,EXTERNAL ELECTRIFICATION OF OFFICE/STORES AND YARD AREAS AT 4 X 600MW,JINDAL SUPER THERMAL POWER PLANT,VILLAGE-TAMNAR, DISTRICT- RAIGARH,CHATTISGARH |
BHEL, PSWR |
2009-05-18 09:05:00 |
2009-06-09 11:00:00 |
N/A |
| NIT_6497 |
LIFTING BEAM,CAP 120 TON |
BHEL, Haridwar |
2009-05-16 02:05:00 |
2009-07-02 14:00:00 |
N/A |
| NIT_6496 |
ELECTRICAL AND INSTRUMENTATION WORKS FOR PUMPS TEST PLANT FOR TESTING OF PUMPS |
BHEL, Hyderabad |
2009-05-15 02:05:00 |
2009-05-30 13:30:00 |
N/A |
| NIT_6495 |
NIT FOR ERECTION TESTING AND COMMISSIONING OF AND ALL ELECTRICAL, CONTROL AND INSTRUMENTATION WORK OF HRSG, GTG, BOP, GT AND THEIR AUXILIARIES, ETC FOR 1X21 MW _FRAME-V_ GTG BASED COGENERATION CAPTIVE POWER PLANT OF BRPL-DHDT PROJECT AT BONGAIGAON REFINERY AND PETROCHEMICALS LTD., ASSAM.. |
BHEL, PSER |
2009-05-14 05:05:00 |
2009-06-05 15:00:00 |
Yes 2 |
| NIT_6494 |
RECEIPT, UNLOADING, STACKING, HANDLING AT SITE STORES, TRANSPORTATION TO SITE OF WORK, ERECTION OF MECHANICAL COMPONENTS, TESTING AND COMMISSIONING OF ELECTROSTATIC PRECIPITATOR AND ID FAN FOR 1X62.5 MW UNIT AT RTS B, RAMAGUNDAM OF M/S APGENCO |
BHEL, Ranipet |
2009-05-14 03:05:00 |
2009-06-06 15:00:00 |
N/A |
| NIT_6493 |
DESIGN, MANUFACTURING, LAYING OF CABLE, TESTING, COMMISSIONING OF 400KV XLPE CABLES, TERMINATION ETC COMPLETE AT PARBATI SITE IN HIMACHAL PRADESH- INDIA |
BHEL, Industry Sector |
2009-05-14 03:05:00 |
2009-06-26 10:30:00 |
Yes 3 |
| NIT_6492 |
PREPARATION,ASSEMBLING AND MATERIAL HANDLING OF MILL DISCHARGE VALVE ASSEMBLY. |
BHEL, Hyderabad |
2009-05-14 03:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6491 |
MISCELLANEOUS JOBS LIKE CLEANING AND MOVEMENT OF CIRCUIT BREAKER COMPONENTS AND PRODUCTS. |
BHEL, Hyderabad |
2009-05-14 03:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6490 |
MISCELLANEOUS JOBS LIKE CLEANING AND MOVEMENT OF CIRCUIT BREAKER COMPONENTS. |
BHEL, Hyderabad |
2009-05-14 03:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6489 |
CHIPPING,GRANDING,DEBURRING AND MATERIALS HANDLING OF 400KV,245KV AND 145KV BREAKERS,NEW PRODUCT JOB. |
BHEL, Hyderabad |
2009-05-14 02:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6488 |
GRIT BLASTING OF ALL ALUMINIUM CASTING OF 400KV,245KV AND 145KV BREAKERS IN SWITCHGEAR SHOP. |
BHEL, Hyderabad |
2009-05-14 02:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6487 |
PICKLING,DEGREASING,PHOSPHATING AND PAINTING. |
BHEL, Hyderabad |
2009-05-14 02:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6486 |
HAMDLING OF GAS CYLINDERS,MOVEMENT OF TEST EQUIPMENTS,MATERAILS AND CLEANING,DAK COLLECTION AND DISTRIBUTION. |
BHEL, Hyderabad |
2009-05-14 02:05:00 |
2009-06-01 13:00:00 |
N/A |
| NIT_6485 |
SUPPLY, RECEIPT AT SITE, ALL HANDLING, TRANSPORTATION FROM STORE, STORE-YARD TO ERECTION SITE, ERECTION, TESTING AND COMMISSIONING OF EQUIPMENT AND SYSTEMS FOR CONSTRUCTION POWER DISTRIBUTION SYSTEM - LT KIOSKS ETC.- INCLUDING OBTAINING CLEARANCES FROM VARIOUS AUTHORITIES AS WELL AS OPERATION AND MAINTENANCE WORK FOR 1X500 MW KORBA WEST ,CHATTISGARH |
BHEL, PSER |
2009-05-12 07:05:00 |
2009-06-03 15:00:00 |
Yes 5 |
| NIT_6484 |
SUPPLY, RECEIPT AT SITE, ALL HANDLING, TRANSPORTATION FROM STORE, STORE-YARD TO ERECTION SITE, ERECTION, TESTING AND COMMISSIONING OF EQUIPMENT AND SYSTEMS FOR CONSTRUCTION POWER DISTRIBUTION SYSTEM - LT KIOSKS ETC.- INCLUDING OBTAINING CLEARANCES FROM VARIOUS AUTHORITIES AS WELL AS OPERATION AND MAINTENANCE WORK FOR 2X500 MW MARWA TPP , CHATTISGARH |
BHEL, PSER |
2009-05-12 07:05:00 |
2009-06-03 15:00:00 |
Yes 5 |
| NIT_6483 |
CONSTRUCTION AND DEVELOPMENT OF STORE SHEDS AND YARD AT CHHABRA TPS, STAGE II, DISTT. BARAN, RAJASTHAN |
BHEL, PSNR |
2009-05-12 05:05:00 |
2009-06-03 15:30:00 |
N/A |
| NIT_6482 |
CONSTRUCTION AND DEVELOPMENT OF SITE OFFICE AT NIMOO BAZGO HEP, DISTT. LEH, JAMMU AND KASHMIR |
BHEL, PSNR |
2009-05-12 05:05:00 |
2009-06-03 15:30:00 |
Yes 2 |
| NIT_6481 |
LATTICE BOOM HYDRAULIC CRAWLER MOUNTED CRANE SUITABLE 800MW BOILER PROJECT 360DEG SLEW FOR CRITICAL LOAD MIN.265MT BELOW HOOK AT MINIMUM 18 MTR RADIUS WITH MINIMUM CLEAR HEIGHT OF 116MTR COMBINATION |
BHEL, PSSR |
2009-05-12 11:05:00 |
2009-07-21 14:30:00 |
Yes 2 |
| NIT_6480 |
LATTICE BOOM HYDRAULIC CRAWLER MOUNTED CRANE SUITABLE FOR 600MW PROJECT 360DEG SLEW FOR CRITICAL LOAD MIN.194 MT BELOW HOOK AT MINIMUM 16 MTR RADIUS WITH MINIMUM CLEAR HEIGHT OF 100MTR UNDER HOOK |
BHEL, PSSR |
2009-07-21 11:05:00 |
2009-07-21 14:30:00 |
Yes 2 |
| NIT_6479 |
REPAIR OF SKS12 CNC VERTICAL LATHE ASSET NO 70-1170 |
BHEL, Hyderabad |
2009-05-12 07:05:00 |
2009-05-19 14:00:00 |
N/A |
| NIT_6478 |
NIT FOR CONSTRUCTION OF 275 METRE HIGH RCC SINGLE FLUE STEEL LINED CHIMNEY AT 1X 500 MW BOKARO A PROJECT,JHARKHAND, 275 METRE HIGH RCC SINGLE FLUE STEEL LINED CHIMNEY AT 1X500 MW KORBA CSPGCL PROJECT, CHATTISGARH, 275 METRE HIGH RCC TWIN FLUE STEEL LINED CHIMNEY AT 2X500 MW MARWA CSPGCL PROJECT, CHATTISGARH |
BHEL, PSER |
2009-05-11 07:05:00 |
2009-06-02 15:00:00 |
Yes 4 |
| NIT_6477 |
SUPPLY OF GI END PLUG |
BHEL, Bangalore |
2009-05-11 02:05:00 |
2009-06-01 01:30:00 |
N/A |
| NIT_6476 |
PROCUREMENT OF HIGH TEMPERATURE X-RAY DIFFRACTION SYSTEM 1 NO. |
BHEL, Trichy |
2009-05-11 02:05:00 |
2009-06-09 14:30:00 |
Yes 1 |
| NIT_6475 |
NIT FOR TENDER DOCUMENT FOR SUPPLY AND INSTALLTION OF ONE NO. 6.5 TR PRECISION AC SYSTEM FOR COMPUER _ SERVER _ ROOM AT BHELS OFFICE _ KOLKATA ON 7 YEARS LEASE RENTAL BASIS |
BHEL, PSER |
2009-05-11 01:05:00 |
2009-06-02 15:00:00 |
N/A |
| NIT_6474 |
FOUNDRY WORKS CONTRACT |
BHEL, Bhopal |
2009-05-11 10:05:00 |
2009-06-05 02:30:00 |
N/A |
| NIT_6473 |
AS PER SCHEDULE A |
BHEL, Bhopal |
2009-05-08 10:05:00 |
2009-05-28 03:00:00 |
N/A |
| NIT_6472 |
SUPPLY OF HYDRAULIC HAND PALLET TRUCK |
BHEL, Bangalore |
2009-05-08 09:05:00 |
2009-05-27 13:30:00 |
N/A |
| NIT_6471 |
SUPPLY OF BATTERY OPERATED STACKERS |
BHEL, Bangalore |
2009-05-08 09:05:00 |
2009-05-25 13:30:00 |
N/A |
| NIT_6470 |
SANITATION WORKS IN TOWNSHIP FOR THE PERIOD OF TWELVE MONTHS |
BHEL, Jhansi |
2009-05-07 04:05:00 |
2009-05-22 14:00:00 |
N/A |
| NIT_6469 |
MAINTAINING MESS AND CLEANING, GARDENING AND OTHER MISCELLANEOUS WORK IN ET,ST AND GIRLS HOSTEL |
BHEL, Jhansi |
2009-05-07 03:05:00 |
2009-05-22 14:00:00 |
N/A |
| NIT_6468 |
CNC CYLINDRICAL GRINDING MACHINE |
BHEL, Haridwar |
2009-05-07 11:05:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6467 |
MAINTENANCE AND REPEIARS TO FURNITURE ITEMS. |
BHEL, Hyderabad |
2009-05-07 10:05:00 |
2009-05-27 13:30:00 |
N/A |
| NIT_6466 |
REPAIRS TO SUB MERSIBLE PUMP SETS. |
BHEL, Hyderabad |
2009-05-07 10:05:00 |
2009-05-27 13:30:00 |
N/A |
| NIT_6465 |
REPAIRS TO ROOF LEAKAGES FOR TYPE-A QUARTERS IN NH-II. |
BHEL, Hyderabad |
2009-05-07 10:05:00 |
2009-05-27 13:30:00 |
N/A |
| NIT_6464 |
1.CLEANING,SUNDRY UP KEEPING WORKS IN ALL TEST PLANTS 2.MATERIAL HANDLING WORKS. |
BHEL, Hyderabad |
2009-05-07 09:05:00 |
2009-06-08 13:30:00 |
N/A |
| NIT_6463 |
ERECTION TESTING AND COMMISSIONING OF 1X500MW STEAM TURBINE GENERATOR SET ITS AUXL ETC AT UNIT 6 GSECL UKAITPS GUJARAT |
BHEL, PSWR |
2009-05-06 06:05:00 |
2009-05-29 11:00:00 |
Yes 2 |
| NIT_6462 |
NIT FOR AUTOMATIC PRESSURE GELATION PLANT AS PER SPECIFICATIONS |
BHEL |
2009-05-06 04:05:00 |
2009-07-02 14:00:00 |
N/A |
| NIT_6461 |
NIT FOR 150 NOS OF CIRCULAR CONNECTORS |
BHEL |
2009-05-06 04:05:00 |
2009-05-23 14:00:00 |
N/A |
| NIT_6460 |
NIT FOR AMC OF THERMAL SPRAY ACOUSTIC CHAMBER |
BHEL |
2009-05-06 04:05:00 |
2009-05-28 14:00:00 |
N/A |
| NIT_6459 |
NIT FOR GAS INSULATED VOLTAGE TRANSFORMER - 7 NOS |
BHEL |
2009-05-06 04:05:00 |
2009-05-26 14:00:00 |
N/A |
| NIT_6458 |
ERECTION TESTING AND COMMISSIONING OF BOLER ITS AUXL ESP PCP TG CYCLE PIPING ETC OF UNIT NO 1 OF 2X500MW MAUDA STPS, DIST NAGPUR, MAHARASTRA |
BHEL, PSWR |
2009-05-06 02:05:00 |
2009-05-29 11:00:00 |
Yes 2 |
| NIT_6457 |
CONSTRUCTION OF GENERAL CIVIL WORKS FOR MAIN PLANT
AUXILIARY PLANT BUILDINGS FOR 2 X 600 MW AT NORTH CHENNAI TPS TAMILNADU |
BHEL, PSSR |
2009-05-06 02:05:00 |
2009-05-26 15:30:00 |
Yes 4 |
| NIT_6456 |
EXPRESSION OF INTEREST FOR PRE-BID TIE-UP FOR EPC CONTRACT FOR 400 MW MARIB PHASE II GAS POWER PROJECT OF PUBLIC ELECTRICITY CORPORATION /PEC/ OF REPUBLIC OF YEMEN. |
BHEL, PSNR |
2009-05-05 06:05:00 |
2009-05-14 15:30:00 |
N/A |
| NIT_6455 |
DESIGN, MANUFACTURING, LAYING OF CABLE AT SITE, TESTING, COMMISSIONING AT SITE OF 220KV XLPE CABLES, TERMINATION ETC. COMPLETE |
BHEL, Industry Sector |
2009-05-05 02:05:00 |
2009-06-30 10:30:00 |
Yes 1 |
| NIT_6454 |
SUPPLY OF CARRIER LOADING BEAM |
BHEL, Haridwar |
2009-05-05 02:05:00 |
2009-06-26 14:00:00 |
N/A |
| NIT_6453 |
CNC HORIZONTAL MACHINING CENTER 630 MM X 630 MM |
BHEL, Haridwar |
2009-05-05 02:05:00 |
2009-06-26 14:00:00 |
Yes 1 |
| NIT_6452 |
CNC HORIZONTAL MACHINING CENTER 800 MM X 1000 MM |
BHEL, Haridwar |
2009-05-05 02:05:00 |
2009-06-25 14:00:00 |
Yes 1 |
| NIT_6451 |
SUPPLY OF OPERATOR TABLE |
BHEL, Bangalore |
2009-05-05 12:05:00 |
2009-05-25 13:30:00 |
N/A |
| NIT_6450 |
UNLOADING, VERIFICATION, STACKING ETC. OF PLANT AND OTHER MATERIALS OF BOILER, STEAM TURBINES, ALONG WITH THE ASSOCIATED AUXILIARIES AT 2X250 MW CHHABRA II TPP,RAJASTHAN. |
BHEL, PSNR |
2009-05-05 10:05:00 |
2009-05-26 15:30:00 |
N/A |
| NIT_6449 |
RECEIPT OF EQUIPMENT/ MATERIAL AT SITE, UNLOADING, INSPECTION, VERIFICATION, STORAGE, UP-KEEPING DURING STORAGE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 220 KV SWITCHYARD FOR SIKKA TPS UNITS 3 AND 4, DIST. JAMNAGAR, GUJARAT |
BHEL, Industry Sector |
2009-05-04 05:05:00 |
2009-06-03 15:30:00 |
N/A |
| NIT_6448 |
DESIGN, MANUFACTURING, LAYING OF CABLE AT SITE, TESTING, COMMISSIONING AT SITE OF 400KV XLPE CABLES, TERMINATION ETC COMPLETE |
BHEL, Industry Sector |
2009-05-04 05:05:00 |
2009-06-30 10:30:00 |
Yes 1 |
| NIT_6447 |
ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 66 KV SWITCHYARD FOR CHUTAK HEP, JAMMU AND KASHMIR. |
BHEL, Industry Sector |
2009-05-04 05:05:00 |
2009-07-07 15:30:00 |
N/A |
| NIT_6446 |
VERTICAL BAND SAW MACHINE |
BHEL, Haridwar |
2009-05-04 05:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6445 |
ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 66 KV SWITCHYARD FOR NIMOO BAZGO HEP,JAMMU AND KASHMIR |
BHEL, Industry Sector |
2009-05-04 04:05:00 |
2009-07-07 15:30:00 |
N/A |
| NIT_6444 |
SUPPLY OF BUTT WELDED PIPE FITTINGS |
BHEL, Piping Centre |
2009-05-04 03:05:00 |
2009-05-18 14:30:00 |
N/A |
| NIT_6443 |
TRAVELLING COLUMN RADIAL DRILLING MACHINE CAP. 100MM |
BHEL, Haridwar |
2009-05-04 02:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6442 |
ANNUAL MAINTENANCE OF ALL CIVIL TYPES
OF WORKS COVERING MASONARY, PLUMBING,
CARPENTARY,HORTICULTURE, PAINTING, ROADS ETC IN TOWNSHIP. |
BHEL, Hyderabad |
2009-05-04 02:05:00 |
2009-05-23 13:30:00 |
N/A |
| NIT_6441 |
SUPPLY OF 15000MT OF OPC GR.43 CEMENT TO BHEL BAWANA SITE, DELHI |
BHEL, PSNR |
2009-05-04 02:05:00 |
2009-05-18 15:30:00 |
N/A |
| NIT_6440 |
BED PLATES DELY REQD IN JULY-09 |
BHEL, Jhansi |
2009-05-04 01:05:00 |
2009-05-29 14:00:00 |
N/A |
| NIT_6439 |
DESIGN MANUFACTURING SUPPLY ERECTION AND COMMISSIONING OF 3 T SEMI GENTRY CRANE DELY REQD IN JULY-09 |
BHEL, Jhansi |
2009-05-04 01:05:00 |
2009-05-29 14:00:00 |
N/A |
| NIT_6438 |
AUTOMATIC TAN DELTA AND CAPACITANCE MEASURING SYSTEM |
BHEL, Bhopal |
2009-04-15 01:05:00 |
2009-05-23 02:00:00 |
N/A |
| NIT_6437 |
OIL FILTRATION PLANT |
BHEL, Bhopal |
2009-04-15 01:05:00 |
2009-05-30 02:00:00 |
N/A |
| NIT_6436 |
PULSE OXIMETER |
BHEL, Bhopal |
2009-04-15 01:05:00 |
2009-05-26 02:00:00 |
N/A |
| NIT_6435 |
CNC CYLINDRICAL GEAR BORE GRINDING MACHINE |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-23 02:00:00 |
N/A |
| NIT_6434 |
A C SYSTEM FOR CNC GEAR MEASURING MACHINE |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-23 02:00:00 |
N/A |
| NIT_6433 |
ENDOMOTOR |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-26 02:00:00 |
N/A |
| NIT_6432 |
DENTAL X RAY MACHINE |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-28 02:00:00 |
N/A |
| NIT_6431 |
APEX LOCATOR |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-28 02:00:00 |
N/A |
| NIT_6430 |
DEVELOPMENT OF AN AUTOMATED SPLIT TYPE FURNACE OF SR OF HIGH RATING HEAT EXCHANGER JOINTS |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-30 02:00:00 |
N/A |
| NIT_6429 |
DENTAL CHAIR |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-26 02:00:00 |
N/A |
| NIT_6428 |
AMALGAMATOR |
BHEL, Bhopal |
2009-04-15 12:05:00 |
2009-05-28 02:00:00 |
N/A |
| NIT_6427 |
PORTABLE DIGITAL DEW POINT METER |
BHEL, Hyderabad |
2009-04-15 11:05:00 |
2009-05-30 02:00:00 |
N/A |
| NIT_6426 |
CNC LATHE SOC 1300MM, CD 6000 MM |
BHEL, Haridwar |
2009-05-04 09:05:00 |
2009-06-23 14:00:00 |
Yes 1 |
| NIT_6425 |
SUPPLY OF MOBILE CLEAN AIR TENT |
BHEL, Hyderabad |
2009-05-02 06:05:00 |
2009-06-20 14:30:00 |
N/A |
| NIT_6424 |
SUPPLY OF DINING TABLE WITH 8 FOLDABLE SEATS WITH SS TOPS |
BHEL, Hyderabad |
2009-05-02 06:05:00 |
2009-06-09 14:33:00 |
N/A |
| NIT_6423 |
SUPPLY OF VIBRATION ANALYSER |
BHEL, Hyderabad |
2009-05-02 05:05:00 |
2009-06-05 14:38:00 |
N/A |
| NIT_6422 |
SUPPLY OF HARDNESS TESTERS |
BHEL, Hyderabad |
2009-05-02 05:05:00 |
2009-06-04 14:32:00 |
N/A |
| NIT_6421 |
SUPPLY OF LASER SHAFT ALIGNMENT SYSTEM |
BHEL, Hyderabad |
2009-05-02 05:05:00 |
2009-06-05 14:30:00 |
N/A |
| NIT_6420 |
SUPPLY OF ABRASIVE FLOW MACHINING EQUIPMENT/EXTRUDE HONING EQUIPMENT |
BHEL, Hyderabad |
2009-05-02 05:05:00 |
2009-05-30 14:30:00 |
N/A |
| NIT_6419 |
20 TON MOBILE CRANE |
BHEL, Haridwar |
2009-05-02 04:05:00 |
2009-06-20 14:00:00 |
N/A |
| NIT_6418 |
SUPPLY, ERECTION TESTING AND COMMISSIONING OF VCBS, TRANSFORMER, LTDB, BUS DUCT AND CABLES AS PER ANNEXURE-1 AND ANNEXURE- A |
BHEL, Haridwar |
2009-05-02 03:05:00 |
2009-06-10 14:00:00 |
N/A |
| NIT_6417 |
PROCUREMENT OF CRYOCAN LIQUID NITROGEN CONTAINERS |
BHEL, Hyderabad |
2009-05-02 03:05:00 |
2009-05-30 14:30:00 |
N/A |
| NIT_6416 |
SUPPLY OF PORTABLE UNIVERSAL DRILLING MACHINE DIA 50 MM |
BHEL, Haridwar |
2009-05-02 01:05:00 |
2009-06-23 14:00:00 |
N/A |
| NIT_6415 |
CNC HORIZONTAL BORER SPINDLE DIA 200 MM |
BHEL, Haridwar |
2009-05-02 10:05:00 |
2009-06-20 14:00:00 |
Yes 1 |
| NIT_6414 |
CNC VERTICAL BORER TABLE DIA 4M |
BHEL, Haridwar |
2009-05-01 04:05:00 |
2009-06-20 14:00:00 |
Yes 1 |
| NIT_6413 |
CONSTRUCTION OF NEW WORK SHOPS, ALLIED STRUCTURES, MACHINE FOUNDATIONS SERVICES AND ALLIED CIVIL WORKS UNDER ENHANCEMENT OF AC LOCOMOTIVE MANUFACTURING FACILITIES |
BHEL, Jhansi |
2009-05-01 11:05:00 |
2009-06-26 14:00:00 |
N/A |
| NIT_6412 |
WORK SERVICE FOR DAK DISTRBN FOR EMS OHSAS RELATED WORKS |
BHEL, Hyderabad |
2009-04-30 02:04:00 |
2009-05-15 14:30:00 |
N/A |
| NIT_6411 |
CONSTRUCTION OF SITE OFFICE, STORAGE SHED AND OTHER INFRASTRUCTURE FACILITIES AT 2X270 MW TPS, GOINDWAL SAHIB, TARAN TAARAN, PUNJAB |
BHEL, PSNR |
2009-04-30 01:04:00 |
2009-05-22 15:30:00 |
Yes 1 |
| NIT_6410 |
PROCUREMENT OF CAST IRON SWITCHES |
BHEL, Hyderabad |
2009-04-30 12:04:00 |
2009-06-19 14:30:00 |
N/A |
| NIT_6409 |
PROCUREMENT OF BINOCULAR MICROSCOPE |
BHEL, Hyderabad |
2009-04-30 12:04:00 |
2009-05-30 14:30:00 |
N/A |
| NIT_6408 |
PROCUREMENT OF OFF LOAD ISOLATORS |
BHEL, Hyderabad |
2009-04-30 12:04:00 |
2009-07-10 14:30:00 |
N/A |
| NIT_6407 |
PROCUREMENT OF SYRINGE PUMP |
BHEL, Hyderabad |
2009-04-30 12:04:00 |
2009-05-30 14:30:00 |
N/A |
| NIT_6406 |
PROCUREMENT OF WATER PURIFICATION UNIT |
BHEL, Hyderabad |
2009-04-30 12:04:00 |
2009-06-03 14:30:00 |
N/A |
| NIT_6405 |
PROCUREMENT OF SIGNAL CABLES |
BHEL, Hyderabad |
2009-04-30 12:04:00 |
2009-06-03 14:30:00 |
N/A |
| NIT_6404 |
PROCUREMENT OF SURFACE ROUGHNESS TESTER |
BHEL, Hyderabad |
2009-04-29 04:04:00 |
2009-06-06 14:30:00 |
N/A |
| NIT_6403 |
EXPRESSION OF INTEREST FOR WIRE BAR AND OXYGEN FREE CC ROD |
BHEL, Bhopal |
2009-04-29 04:04:00 |
2009-06-30 02:30:00 |
N/A |
| NIT_6402 |
SUPPLY OF COOLING WATER PIPES OF VARIOUS DIA AS PER IS 3589 FOR RAYALSEEMA AND HAZIRA PROJECTS |
BHEL, Piping Centre |
2009-04-29 03:04:00 |
2009-05-04 14:30:00 |
Yes 1 |
| NIT_6401 |
ACQUISITION OF CARS ON OPERATING LEASE BASIS FOR SENIOR OFFICERS OF BHEL ACROSS THE COUNTRY |
BHEL, New Delhi |
2009-04-28 06:04:00 |
2009-05-12 15:00:00 |
N/A |
| NIT_6400 |
SUPPLY OF OPC GR. 43 CEMENT FOR BHEL - PARICHHA SITE, JHANSI |
BHEL, PSNR |
2009-04-28 04:04:00 |
2009-05-12 15:30:00 |
N/A |
| NIT_6399 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF POWER CYCLE PIPING, BOILER AND LP PIPING PACKAGES FOR UNIT NOS. 1, 2 AND 3 OF 3 X 500 MW UNITS AT APCPL , JHAJJAR DISTT. JHAJJAR, HARYANA |
BHEL, PSNR |
2009-04-28 04:04:00 |
2009-05-12 15:30:00 |
N/A |
| NIT_6398 |
SUPPLY OF ORDINARY PORTLAND CEMENT GRADE 43, IS 8112 OR EQUIVALENT GRADE FOR KOSTI TPP, SUDAN |
BHEL, PSNR |
2009-04-28 04:04:00 |
2009-05-10 15:30:00 |
N/A |
| NIT_6397 |
PREPARATION OF
ITEMS FOR LUNCH,
VIP/GUEST
LUNCH, MORNING
BREAKFAST,COUPON SALES,
DEPT. COFFEE/TEA
SERVICE,PREPARATION OF
EVENING TIFFIN,ASSIST IN FOOD
PREPARATION,
COUNTER SERVICE,
VESSEL WASHING ,HOUSEKEEPING OF
HEAD/CBU AND
HEAD/EPD
SECRTT. |
BHEL, EPD |
2009-04-27 05:04:00 |
2009-05-19 15:00:00 |
N/A |
| NIT_6396 |
DISMANTLING AND RE-CONSTRUCTION OF TUNNEL KILN |
BHEL, EPD |
2009-04-27 03:04:00 |
2009-05-19 14:30:00 |
N/A |
| NIT_6395 |
ENGINEERING CONSULTANCY AND OWNERS ENGINEER SERVICES FOR THE UDANGUDI SUPER CRITICAL THERMAL POWER PROJECT 2 X 800 MW A CDM PROJECT IN TUTICORIN DISTRICT, TAMIL NADU |
BHEL |
2009-04-24 11:04:00 |
2009-05-27 14:30:00 |
N/A |
| NIT_6394 |
DEVELOPMENT AND CONSTRUCTION OF BHEL STORES COMPLEX AT SITE FOR OBRA TPS R AND M WORKS AT OBRA, DISTT. SONEBHADRA, U. P. |
BHEL, PSNR |
2009-04-27 09:04:00 |
2009-05-19 15:30:00 |
Yes 2 |
| NIT_6393 |
PROCUREMENT AND SOURCE DEVELOPMENT FOR CC RODS |
BHEL, Bhopal |
2009-04-24 05:04:00 |
2009-06-23 02:00:00 |
N/A |
| NIT_6392 |
CIVIL WORKS - MODIFICATION TO 02 PRODUCT STORES |
BHEL, Hyderabad |
2009-04-24 04:04:00 |
2009-05-15 13:30:00 |
N/A |
| NIT_6391 |
CIVIL WORKS TO 6 AXIS TAPING MACHINE IN COIL SHOP OF 02 SHOP |
BHEL, Hyderabad |
2009-04-24 04:04:00 |
2009-05-15 13:30:00 |
N/A |
| NIT_6390 |
ROUTE SURVEY, DESIGN INCLUDING FOUNDATION DESIGN, PROTO TESTING, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF THE TRANSMISSION LINE AND INTERMEDIATE TOWERS BETWEEN GT YARD AND 400KV SWITCHYARD AT 4X100 MW HYDROELECTRIC PROJECT, KOTESHWAR IN UTTARAKHAND |
BHEL, Industry Sector |
2009-04-24 03:04:00 |
2009-05-19 15:30:00 |
N/A |
| NIT_6389 |
CLEANING MATERIAL HANDLING PRESERVATION OF TOOLS COMPONENTS AND REPAIR JOBS OF PUMP SHOP 70 BUILDING |
BHEL, Hyderabad |
2009-04-24 09:04:00 |
2009-05-15 14:00:00 |
N/A |
| NIT_6388 |
WORK OF FENCING, WATER SUPPLY LINE AND PAINTING IN CSU AT JAGDISHPUR |
BHEL, Jagdishpur |
2009-04-22 07:04:00 |
2009-04-29 15:00:00 |
N/A |
| NIT_6387 |
RECEIPT OF EQUIPMENT/ MATERIAL AT SITE, UNLOADING, INSPECTION, VERIFICATION, STORAGE, UP-KEEPING DURING STORAGE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 400 KV SWITCHYARD AT SHRINAGAR IN UTTARAKHAND. |
BHEL, Industry Sector |
2009-04-22 04:04:00 |
2009-06-02 15:30:00 |
N/A |
| NIT_6386 |
ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 220 KV SWITCHYARD FOR TEESTA LOW DAM PROJECT IN WEST BENGAL. |
BHEL, Industry Sector |
2009-04-22 04:04:00 |
2009-06-02 15:30:00 |
N/A |
| NIT_6385 |
NIT FOR HIRING OF _I 1 NO HEAVY LIFT CRANE, 2 NO MID RANGE HEAVY LIFT CRANE, 3 NO GENERAL PURPOSE CRANE AND 1 NO TYRE MOUNTED MOBILE CRANE WITH TELESCOPIC BOOM FOR BARH, PH_II TPS, BIHAR _II 2 NO MID RANGE HEAVY LIFT CRANE, 1 NO GENERAL PURPOSE CRANE AND 1 NO 75MT CRAWLER CRANE FOR BOKARO_A TPS, JHARKHAND_ III 1 NO HEAVY LIFT CRANE FOR KORBA _W TPS, CHATTISGARH AND _IV 1 NO HEAVY LIFT CRANE AND 1 NO GENERAL PURPOSE CRANE FOR MARHWA TPP, CHATTISGARH. |
BHEL, PSER |
2009-04-22 03:04:00 |
2009-05-12 15:00:00 |
Yes 3 |
| NIT_6384 |
NIT FOR BALANCE WORK OF HANDLING INCLUDING RECEIPT OF MATERIALS FROM BHEL_CLIENTS STORES_STORAGE YARD_ERECTION SITE, ARRANGING THEIR ISSUE, SITE TRANSPORTATION, TEMPORARY STORAGE PRIOR TO ERECTION, IF REQUIRED, CLEANING, PRESERVATIVE PAINTING, ERECTION, ALIGNMENT, WELDING, LEVELING, ADJUSTMENT, CHIPPING AND LEVELING OF FOUNDATION AND GROUTING, REMOVAL OF SCRAPS, ETC. OF ALL BALANCE WORKS OF BOILER AND ITS AUXILIARIES INCLUDING STRUCTURES, DUCTS AND FUEL PIPING ETC AND PROVIDING ASSISTANCE FOR PG TEST, LIQUIDATION OF PENDING POINTS AND HANDING OVER OF THE BOILER WITH AUXILIARIES OF 1X500 MW UNIT NO.5 AT KAHALGAON TPS, DIST _BHAGALPUR, BIHAR AS ENUMERATED IN DETAIL IN THE TENDER DOCUMENT. |
BHEL, PSER |
2009-04-22 01:04:00 |
2009-05-14 15:00:00 |
Yes 4 |
| NIT_6383 |
TENDER NOTICE FOR -1.CIVIL WORKS TO 6 AXIS TAPING MACHINE IN COIL SHOP OF 02 BLOCK . 2. CIVIL WORKS-MODIFICATION TO 02 PRODUCT STORES. |
BHEL, Hyderabad |
2009-04-22 07:04:00 |
2009-05-15 13:30:00 |
N/A |
| NIT_6382 |
HOUSE KEEPING ACTIVITIES IN ADMINISTRATIVE GROUP OF BUILDINGS |
BHEL, Hyderabad |
2009-04-21 06:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6381 |
MAINTENANCE OF INTERNAL WATER SUPPLY AND SANITARY FITTINGS IN FACTORY AREA AND ADMN BUILDING |
BHEL, Hyderabad |
2009-04-21 06:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6380 |
MAINTENANCE OF STRUCTURAL STEEL WORKS,AC SHEET ROOFING, RAIN WATER PIPES, CLEANING OF COBWEBS IN FACTORY AREA |
BHEL, Hyderabad |
2009-04-21 06:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6379 |
MAINTENANCE OF BLOCKS AND BUILDINGS IN FACTORY AREA |
BHEL, Hyderabad |
2009-04-21 06:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6378 |
MAINTENANCE OF RAILWAY LINES, FENCING IN FACTORY AREA |
BHEL, Hyderabad |
2009-04-21 06:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6377 |
REMOVAL OF GARBAGE,WOOD SRAP AND MS SCRAP IN FACTORY AREA |
BHEL, Hyderabad |
2009-04-21 06:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6376 |
MAINTENANCE OF EXTERNAL SEWAGE SYSTEM AND OPEN DRAINS, CLEANING OF SEWAGE LINES,SANITATION OF ROADS IN FACTORY AREA AND ADMN BLDG AREA |
BHEL, Hyderabad |
2009-04-21 05:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6375 |
PROVIDING SECURITY SERVICES AT FACTORY PREMISES OF BHEL, GOINDWAL SAHIB |
BHEL IVP Goindval |
2009-04-21 04:04:00 |
2009-05-08 15:00:00 |
N/A |
| NIT_6374 |
CONVERSION OF SEAMLESS HOLLOWS INTO FINISHED TUBES |
BHEL, Trichy |
2009-04-21 01:04:00 |
2009-05-20 15:00:00 |
N/A |
| NIT_6373 |
GIRTH GEAR |
BHEL, Hyderabad |
2009-04-21 09:04:00 |
2009-05-05 11:00:00 |
N/A |
| NIT_6372 |
TENDER NOTICE FOR MAINTENANCE CIVIL WORKS IN FACTORY AREA |
BHEL, Hyderabad |
2009-04-21 08:04:00 |
2009-05-05 13:30:00 |
N/A |
| NIT_6371 |
PAINTING WORKS OF PUMPS |
BHEL, Hyderabad |
2009-04-18 12:04:00 |
2009-05-08 14:00:00 |
N/A |
| NIT_6370 |
NIT FOR SUPPLY OF TORQUE METER FOR PUMP TEST RIG |
BHEL |
2009-04-17 07:04:00 |
2009-05-16 14:00:00 |
N/A |
| NIT_6369 |
NIT FOR SUPPLY OF CAD TOOLS AND CFD ANALYSIS TOOLS |
BHEL |
2009-04-17 07:04:00 |
2009-05-26 14:00:00 |
N/A |
| NIT_6368 |
NIT FOR PROVISION OF ONE 16 SEATER AND TWO 14 SEATER MINI BUSES FOR HIRE |
BHEL |
2009-04-17 07:04:00 |
2009-05-09 14:00:00 |
N/A |
| NIT_6367 |
NIT FOR SUPPLY OF HOT WIRE ANEMOMETER - CTA |
BHEL |
2009-04-17 07:04:00 |
2009-05-16 14:00:00 |
N/A |
| NIT_6366 |
NIT FOR SUPPLY OF UNIFORM CLOTH FOR MALE EMPLOYEES |
BHEL |
2009-04-17 07:04:00 |
2009-05-09 14:00:00 |
N/A |
| NIT_6365 |
NIT FOR CUTTING TOOL HOLDERS |
BHEL |
2009-04-17 07:04:00 |
2009-05-09 14:00:00 |
N/A |
| NIT_6364 |
NIT FOR FUEL CELL TEST STATION |
BHEL |
2009-04-17 07:04:00 |
2009-05-09 14:00:00 |
N/A |
| NIT_6363 |
NIT FOR ARCING CHAMBER INSULATORS AND PULL RODS |
BHEL |
2009-04-17 07:04:00 |
2009-05-09 14:00:00 |
N/A |
| NIT_6362 |
THREE PHASE SYNTHETIC SHORT CIRCUIT TESTS ON 145KV METAL CLAD COMPACT GIS |
BHEL |
2009-04-17 07:04:00 |
2009-05-09 14:00:00 |
N/A |
| NIT_6361 |
SITE SERVICES OF SWGR IN JAIPUR RAJASTHAN. |
BHEL, Bhopal |
2009-04-17 12:04:00 |
2009-05-11 14:30:00 |
N/A |
| NIT_6360 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF 2X36 MW STG DB EXT, 1X32 MW STG BK PR, 2XFR-6 GT/ GTG WITH AUXILIARIES, PUMPS AND PIPING FOR 153 MW, CPP OF GGSRP, BATHINDA |
BHEL, PSNR |
2009-04-17 09:04:00 |
2009-05-05 15:30:00 |
Yes 3 |
| NIT_6359 |
MS STRAINER HOUSINGS, 1700 KGS |
BHEL, Haridwar |
2009-04-17 09:04:00 |
2009-05-25 14:00:00 |
N/A |
| NIT_6358 |
REPAIR OF SITE OFFICE AT KOTESHWAR HEP, UTTARAKHAND |
BHEL, PSNR |
2009-04-16 04:04:00 |
2009-05-01 15:30:00 |
Yes 6 |
| NIT_6357 |
LAYING OF PIPELING FOR OXYGEN AT NEW PLANT. |
BHEL, Trichy |
2009-04-16 03:04:00 |
2009-05-07 15:00:00 |
N/A |
| NIT_6356 |
LAYING OF PIPELING FOR COMPRESSED AIR FOR NEW PLANT. |
BHEL, Trichy |
2009-04-16 03:04:00 |
2009-05-07 15:00:00 |
N/A |
| NIT_6355 |
NIT FOR DESIGN, MANUFACTURING, ASSEMBLY, TRANSPORTATION AND DELIVERY OF TEN NOS. BUNK HOUSES FOR BHEL_PSER SITES _2 NOS. FOR BARH, 2 NOS. FOR BONGAIGAON NTPC , 2 NOS. FOR KORBA, 2 NOS. FOR MARWA AND 2 NOS. FOR PALLATANA |
BHEL, PSER |
2009-04-16 02:04:00 |
2009-05-04 15:00:00 |
N/A |
| NIT_6354 |
PROVIDING WATER PROOF TREATMENT OVER THE SHELL ROOF TOP SURFACE AT BUILDING NO.07 AND CANTEEN BUILDING INSIDE FACTORY PREMISES |
BHEL, Bangalore |
2009-04-15 01:04:00 |
2009-05-08 15:15:00 |
N/A |
| NIT_6353 |
NIT FOR LOGISTICS OF ODC CONSIGNMENT FROM VARIOUS BHEL MANUFACTURING UNITS AND OR PORT OF ORIGIN TO PALATANA SITE THROUGH ROAD AND WATERWAYS FOR UNIT - 1 AND 2 OF 726.6 -2X363.3- MW GAS BASED CCPP AT PALATANA, UDAIPUR, TRIPURA |
BHEL, PSER |
2009-04-13 07:04:00 |
2009-05-05 15:00:00 |
Yes 6 |
| NIT_6352 |
NIT FOR RUNNING AND MAINTENANCE OF ELECTRICAL INSTALLATION, REPAIR AND MAINTENANCE WORK OF BHEL, PSER INSTALLED AT BHEL BHAVAN, DJ_9_1, SALTLAKE, KOLKATA AND OTHER PREMISES OF BHEL PSER IN KOLKATA. |
BHEL, PSER |
2009-04-13 05:04:00 |
2009-05-05 15:00:00 |
Yes 1 |
| NIT_6351 |
NIT FOR RUNNING AND MAINTENANCE OF HOUSE KEEPING, AT BHEL BHAVAN AND OTHER PREMISES OF BHEL IN KOLKATA |
BHEL, PSER |
2009-04-13 05:04:00 |
2009-05-05 15:00:00 |
N/A |
| NIT_6350 |
NIT FOR MANNING OF GATE, REGULATING ENTRY AND EXIT OF VISITORS VEHICLES AND WATCHING OF MATERIALS AT BHEL BHAVAN AND OTHER PREMISES OF BHEL IN KOLKATA |
BHEL, PSER |
2009-04-13 05:04:00 |
2009-05-05 15:00:00 |
Yes 1 |
| NIT_6349 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF TG SETS AT 2 X 250 MW PARICHA UNITS 5 AND 6, JHANSI , UP |
BHEL, PSNR |
2009-04-13 05:04:00 |
2009-04-23 15:30:00 |
N/A |
| NIT_6348 |
NIT FOR HANDLING AT SITE, STORAGE YARD, STORES, TRANSPORTATION TO WORK PLACE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF STEAM TURBINE AND AUX, GENERATOR AND AUX, CONDENSER, TG INTEGRAL PIPING AND AUXILIARIES AND COMMON SYSYEM _CW PUMP, BOILER FILL PUMP, OTHER PUMPS, ETC AT 2X500 MW DVC,DURGAPUR TPP PROJECT, ANADL, WEST BENGAL |
BHEL, PSER |
2009-04-13 04:04:00 |
2009-05-05 15:00:00 |
Yes 2 |
| NIT_6347 |
NIT FOR HANDLING AT SITE, STORAGE YARD, STORES, TRANSPORTATION TO WORK PLACE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF STEAM TURBINE AND AUX, GENERATOR AND AUX, CONDENSER, TG INTEGRAL PIPING AND THEIR AUXILIARIES ETC AT 2X500 MW DVC, KODERMA TPP, JHARKHAND AND 2X525 MW MAITHON RIGHT BANK TPP, JHARKHAND |
BHEL, PSER |
2009-04-13 04:04:00 |
2009-05-05 15:00:00 |
Yes 3 |
| NIT_6346 |
MATERIAL HANDLING, INFRASTRUCTURAL CIVIL WORKS AND E/T/C OF FRANCIS TURBINES, GENERATORS AND THEIR AUXILIARIES FOR 3X14 MW SALMADAM HYDRO POWER PROJECT, AFGHANISTAN |
BHEL, PSNR |
2009-04-13 03:04:00 |
2009-05-18 15:30:00 |
Yes 2 |
| NIT_6345 |
MODIFICATION OF COMPRESSED AIR PIPE LINES IN BLOCKS AND YARDS |
BHEL, Hyderabad |
2009-04-13 12:04:00 |
2009-04-24 13:30:00 |
N/A |
| NIT_6344 |
SHIFTING OF MATERIALS AND MACHINE COMPONENTS IN 10 REPAIR SHOP 1200 TONS IN A YEAR |
BHEL, Hyderabad |
2009-04-13 12:04:00 |
2009-04-24 13:30:00 |
N/A |
| NIT_6343 |
ANNUAL RATE CONTRACT FOR OPERATION AND MAINTENANCE OF PUMP HOUSE-2 FOR WATER SUPPLY IN TOWNSHIP AND FACTORY AREA FOR A PERIOD OF TWELVE MONTHS |
BHEL, Jhansi |
2009-04-11 04:04:00 |
2009-04-28 14:00:00 |
N/A |
| NIT_6342 |
TRANSPORTATION OF BHEL MATERIALS
FROM ANYWHERE TO ANYWHERE IN INDIA. |
BHEL, Trichy |
2009-04-11 01:04:00 |
2009-04-13 10:00:00 |
N/A |
| NIT_6341 |
NIT FOR ERECTION, TESTING AND COMMISSIONING OF 3X 200 TPH GAS FIRED BOILER WITH AUXILLIARIES AND PIPINGS FOR BOTH TG AND SG SIDE AT 3X 18 MW, POWER AND BLOWING STATION AT IISCO BURNPUR, WEST BENGAL. |
BHEL, PSER |
2009-04-11 07:04:00 |
2009-05-04 15:00:00 |
Yes 6 |
| NIT_6340 |
ANNUAL RATE CONTRACT FOR MISC CIVIL WORKS IN TOWNSHIP FOR YEAR 2009-10 |
BHEL, Jhansi |
2009-04-10 04:04:00 |
2009-05-01 14:00:00 |
N/A |
| NIT_6339 |
ANNUAL CONTRACT FOR WHITE WASHING, DISTEMPERING, SNOWCEM IN TOWNSHIP FOR YEAR 2009-10 |
BHEL, Jhansi |
2009-04-10 04:04:00 |
2009-05-01 14:00:00 |
N/A |
| NIT_6338 |
CONSTRUCTION OF COMPOUND WALL TO JYOTHI VIDYALAYA SCHOOL. |
BHEL, Hyderabad |
2009-04-09 04:04:00 |
2009-05-02 13:30:00 |
N/A |
| NIT_6337 |
OUT SOURCING OF SANITATION, HOUSE KEEPING, HORTICULTURE WORKS IN AND AROUND HRD MAIN BUILDING. |
BHEL, Hyderabad |
2009-04-09 04:04:00 |
2009-05-02 13:30:00 |
N/A |
| NIT_6336 |
MODIFICATION TO THE CO-OPERATIVE SOCIETY BUILDING IN TOWNSHIP CIVIL WORKS 2ND CALL. |
BHEL, Hyderabad |
2009-04-09 04:04:00 |
2009-05-02 13:30:00 |
N/A |
| NIT_6335 |
REPAIRS AND MODIFICATIONS TO TOWNSHIP ADMINISTRATION OFFICE BUILDING 2ND CALL. |
BHEL, Hyderabad |
2009-04-09 03:04:00 |
2009-05-02 13:30:00 |
N/A |
| NIT_6334 |
SUPPLY AND INSTALLATION OF REVERSE OSMOSIS PLANTS. |
BHEL, Hyderabad |
2009-04-09 03:04:00 |
2009-05-02 13:30:00 |
N/A |
| NIT_6333 |
MATERIAL HANDLING, ERECTION, TESTING, COMMISSIONING, TRIAL OPERATION AND HANDING OVER OF 1 X 20 MW FR V GTG SET INCLUDING AUXILIARIES, PIPING, ASSOCIATED ELECTRICAL, C AND I EQUIPMENT, ETC. AT MARUTI SUZUKI INDIA LTD., MANESAR, GURGAON, HARYANA. |
BHEL, PSNR |
2009-04-09 02:04:00 |
2009-04-30 15:30:00 |
Yes 1 |
| NIT_6332 |
DISMANTLING , PACKING OF SRM 2000 LATHE AT 02 BLOCK. |
BHEL, Hyderabad |
2009-04-09 10:04:00 |
2009-04-16 13:30:00 |
N/A |
| NIT_6331 |
CONSTRUCTION OF TWO CLOSED STORAGE SHEDS AND ITS ELECTRIFICATION FOR STATION, C AND I PACKAGE AT 1X500 MW STPS NTPC KORBA. C G |
BHEL, PSWR |
2009-04-09 09:04:00 |
2009-05-01 11:00:00 |
N/A |
| NIT_6330 |
CLEANING ACTIVITIES AND PERIODICAL MAINTENANCE OF COOLING TOWER IN COMPRESSOR HOUSE AND OXYGEN PLANT |
BHEL, Hyderabad |
2009-04-08 03:04:00 |
2009-04-24 14:00:00 |
N/A |
| NIT_6329 |
REPAIR AND EXTENSION OF INDUSTRIAL PIPE LINES IN BLOCKS AND YARDS |
BHEL, Hyderabad |
2009-04-08 03:04:00 |
2009-06-10 15:00:00 |
Yes 2 |
| NIT_6328 |
REMOVAL AND SHIFTING OF CAL ASH FROM THE PRODUCER GAS PLANT - 1600 TONS |
BHEL, Hyderabad |
2009-04-08 03:04:00 |
2009-04-24 14:00:00 |
N/A |
| NIT_6327 |
CLEANING ACTIVITES IN GAS GENERATORS, ESPS, TAR TANKS, COAL AND ASH HADLING WORKS |
BHEL, Hyderabad |
2009-04-08 02:04:00 |
2009-04-24 14:00:00 |
N/A |
| NIT_6326 |
MATERIAL HANDLING WORK OF ALL ITEMS AND ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 3X15 MW HTG PACKAGE AT NIMOO BAZGO HYDRO ELECTRIC PROJECT, DISTRICT LEH, JAMMU AND KASHMIR. |
BHEL, PSNR |
2009-04-08 12:04:00 |
2009-04-30 15:30:00 |
Yes 1 |
| NIT_6325 |
SUPPLY OF FABRICATED Y-PIECES AND TEES |
BHEL, Piping Centre |
2009-04-08 11:04:00 |
2009-04-22 14:30:00 |
N/A |
| NIT_6324 |
ATTENDING PLUMBER COMPLAINTS IN TOWNSHIP FOR PERIOD OF TWELVE MONTHS |
BHEL, Jhansi |
2009-04-08 10:04:00 |
2009-04-28 14:00:00 |
N/A |
| NIT_6323 |
REPAIRS TO WESMAN MAKE HEAT TREATMENT FURNACE 06-1329 IN 06 SHOP |
BHEL, Hyderabad |
2009-04-02 10:04:00 |
2009-06-10 15:00:00 |
Yes 2 |
| NIT_6322 |
ERECTION AND COMMISSIONING OF PANELS, LAYING OF CABLES,HIGH BAY LIGHT FITTING ETC |
BHEL IVP Goindval |
2009-04-08 10:04:00 |
2009-06-15 15:00:00 |
Yes 3 |
| NIT_6321 |
REPAIRS TO PORTABLE AIR COMPRESSORS 6 NOS ELGI/ PNUEPACK, ANCHOR MAKE IN 06 SHOP |
BHEL, Hyderabad |
2009-04-07 01:04:00 |
2009-04-23 14:00:00 |
N/A |
| NIT_6320 |
SUPPLY OF FINISH MACHINE STEEL SUPPORTING PLATES |
BHEL, Haridwar |
2009-04-07 11:04:00 |
2009-05-07 14:00:00 |
N/A |
| NIT_6319 |
HIRING OF TATA SUMO OR EQUALANT |
BHEL, Hyderabad |
2009-04-07 11:04:00 |
2009-04-28 13:30:00 |
N/A |
| NIT_6318 |
POWER DISTRIBUTION BOARDS |
BHEL, Haridwar |
2009-04-07 11:04:00 |
2009-05-07 14:00:00 |
N/A |
| NIT_6317 |
SUPPLY OF DISH WASHING MACHINE 100-150 BASKTES / HR |
BHEL, EPD |
2009-04-07 09:04:00 |
2009-04-30 14:30:00 |
N/A |
| NIT_6316 |
2 BODIES PISTION PUMP 4.7 |
BHEL, Hyderabad |
2009-04-07 09:04:00 |
2009-04-28 11:00:00 |
N/A |
| NIT_6315 |
TRANSHIPMENT OF GENERATOR STATOR OF 500 MW UNIT FROM THE RAILWAY WAGON ON TO HYDRAULIC TRAILERS AND ITS SAFE TRANSPORTATION TO TG HALL BAY AT 1 X 500 MW UNIT 6, FARAKKA SUPER THERMAL POWER PROJECT, DISTT. MURSHIDABAD, WEST BENGAL |
BHEL, PSNR |
2009-04-06 02:04:00 |
2009-04-22 15:30:00 |
Yes 1 |
| NIT_6314 |
HIRING OF VEHICLE MAHINDRA BOLERO DI |
BHEL, Jagdishpur |
2009-04-06 01:04:00 |
2009-04-30 03:00:00 |
N/A |
| NIT_6313 |
CONSTRUCTION OF NEW SITE OFFICE AT HARDUAGANJ TPS, ALIGARH, U. P. |
BHEL, PSNR |
2009-04-06 12:04:00 |
2009-04-28 15:30:00 |
Yes 4 |
| NIT_6312 |
NIT FOR ERECTION AND COMMISSIONING OF BOILER, ROTATING MACHINES AND DUCT, CRITICAL PIPING, MISC PIPING, ETC INCLUDING CIVIL WORKS OF ELEVATOR PIT AND MACHINE ROOM OF BOTH THE UNITS OF 2 X 660MW BARH -STG-II- STPP PROJECT., PO-BARH, DIST-PATNA, BIHAR. |
BHEL, PSER |
2009-04-04 07:04:00 |
2009-04-27 15:00:00 |
Yes 8 |
| NIT_6311 |
NIT FOR ERECTION, TESTING AND COMMISSIONING OF CAND I AND ELECTRICAL JOBS FOR BOILER, ESP, PIPING, TURBINE, GENERATOR AND AUXILIARIES FOR UNIT_ 5 OF 1X120 MW JOJOBERA EXTENSION PROJECT, TATANAGAR, JHARKHAND. |
BHEL, PSER |
2009-04-04 05:04:00 |
2009-04-28 15:00:00 |
Yes 1 |
| NIT_6310 |
SOIL IMPROVEMENT AND BOUNDARY WALL PACKAGE FOR 2 X 500 MW, ANPARA D THERMAL POWER STATION AT ANPARA , DISTT SONEBHADRA, UP |
BHEL, PSNR |
2009-04-04 05:04:00 |
2009-04-27 15:30:00 |
N/A |
| NIT_6309 |
E T AND C OF ELECTRICAL WORKS AT 2X500MW BHUSAWAL TPS OF MSPGCL MAHARASTRA |
BHEL, PSWR |
2009-04-04 01:04:00 |
2009-04-24 11:00:00 |
N/A |
| NIT_6308 |
MAINTENANCE OF SEATS IN COMMUNITY CENTER |
BHEL, Jhansi |
2009-03-26 12:00:00 |
2009-04-17 14:00:00 |
N/A |
| NIT_6307 |
MANUFACTURE AND SUPPLY OF OPC 43 GR CEMENT BHEL IVP GOINDWAL SAHIB |
BHEL IVP Goindval |
2009-03-30 07:04:00 |
2009-04-30 15:30:00 |
Yes 1 |
| NIT_6306 |
E T AND C OF ELECTRICAL AND C AND I WORKS AT 1X350MW CCPP AT GSEGL HAZIRA GUJARAT |
BHEL, PSWR |
2009-04-03 07:04:00 |
2009-04-24 11:00:00 |
Yes 2 |
| NIT_6305 |
E T AND C OF BOILER AND AUXL INCLUDING PIPING INSULATION ETC FOR 2X250MW UNIT 1 AND 2 OF BPSCPL BINA TPS DIST SAGAR MP |
BHEL, PSWR |
2009-04-03 06:04:00 |
2009-04-24 11:00:00 |
Yes 6 |
| NIT_6304 |
NIT FOR CONSTRUCTION OF COVERED , SEMI _COVERED STORES, SITE OFFICE, HARD SURFACING, TEMPORARY ROADS, DRAINS AND CULVERTS, FENCING, BORE WELL ETC AND MISC ENABLING CIVIL WORKS FOR UNIT _ 1 AND 2 OF 726.6 2X363.3 MW GAS BASED CCPP AT PALATANA, UDAIPUR, TRIPURA |
BHEL, PSER |
2009-04-03 05:04:00 |
2009-04-27 15:00:00 |
Yes 4 |
| NIT_6303 |
WORKS CONTRACT FOR GAS CUTTING, BACK CHIPPING, GENERAL CLEANING GRINDING AND MATERIAL HANDLING. |
BHEL, Hyderabad |
2009-04-03 02:04:00 |
2009-04-24 13:30:00 |
Yes 1 |
| NIT_6302 |
RENOVATION OF T25,T28 AND T45 SUBSTATIONS IN 06 BLOCK |
BHEL, Hyderabad |
2009-04-03 02:04:00 |
2009-04-23 14:00:00 |
N/A |
| NIT_6301 |
SUPPLY OF OPC GR 43 CEMENT FOR HARDUAGANJ SITE |
BHEL, PSNR |
2009-04-02 05:04:00 |
2009-04-09 15:30:00 |
Yes 1 |
| NIT_6300 |
NIT FOR ERECTION, TESTING AND COMMISSIONING INCLUDING MATERIAL HANDLING, ELECTRICAL AND C AND I JOB ETC OF 1X21 MW GTG FRAME-V WITH ALL ACCESSORIES AT GOT, TSECL, BARAMURA, TRIPURA. |
BHEL, PSER |
2009-04-02 04:04:00 |
2009-04-24 15:00:00 |
Yes 4 |
| NIT_6299 |
MATERIAL HANDLING WORK OF ALL ITEMS AND ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 4 UNITS OF 11 MW HTG PACKAGE AT CHUTAK HYDRO ELECTRIC PROJECT, DISTRICT KARGIL, JAMMU AND KASHMIR. |
BHEL, PSNR |
2009-04-02 04:04:00 |
2009-04-30 15:30:00 |
Yes 1 |
| NIT_6298 |
NIT FOR CONSTRUCTION OF COVERED/SEMI-COVERED EQUIPMENT STORES, OFFICE, AREA GRADING, TEMPORARY ROADS, DRAINS AND CULVERTS, RCC SLEEPER, FENCING ETC AND MISC CIVIL ENABLING WORKS AT 2 X 500 MW THERMAL UNITS-CSEB-MARWA TPP,MARWA, CHATTISGARH |
BHEL, PSER |
2009-04-02 04:04:00 |
2009-04-27 15:00:00 |
Yes 1 |
| NIT_6297 |
NIT FOR CONSTRUCTION OF COVERED - SEMI-COVERED EQUIPMENT STORES, OFFICE, AREA GRADING, TEMPORARY ROADS, DRAINS AND CULVERTS, RCC SLEEPER, FENCING ETC AND MISC CIVIL ENABLING WORKS AT 1X500 MW THERMAL UNIT-CSEB KORBA WEST TPP, KORBA, CHATTISGARH |
BHEL, PSER |
2009-04-02 03:04:00 |
2009-04-27 15:00:00 |
Yes 1 |
| NIT_6296 |
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF CONTROL AND INSTRUMENTATION C AND I PACKAGE FOR 2X500 MW UNIT _1 AND 2 AT MEJIA-B THERMAL POWER STATION, WEST BENGAL. |
BHEL, PSER |
2009-04-02 12:04:00 |
2009-04-24 15:00:00 |
Yes 1 |
| NIT_6295 |
SUPPLY OF HYDRAULIC TORQUE WRENCH WITH ACCESSORIES |
BHEL, Trichy |
2009-04-01 07:04:00 |
2009-04-24 14:30:00 |
N/A |
| NIT_6294 |
MANUFACTURE OF HI-CHROME LINER CASTINGS IN F P |
BHEL, Hyderabad |
2009-04-01 01:04:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6293 |
MANUFRACTURE AND DELIVERY OF G.IRON CRITICAL CASTINGS AND ALUMINIUM DIE CASTINGS IN F P |
BHEL, Hyderabad |
2009-03-31 03:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6292 |
REFRACTORY AND MELTING OPERATIONS IN F P |
BHEL, Hyderabad |
2009-03-31 02:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6291 |
APPOINMENT OF ENGINEERING CONSULTANT FOR LOCO SHOP |
BHEL, Jhansi |
2009-03-31 02:03:00 |
2009-04-21 14:00:00 |
N/A |
| NIT_6290 |
FETTLING OF CASTINGS IN F P |
BHEL, Hyderabad |
2009-03-31 02:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6289 |
AUXILIARY ACTIVITIES IN FERROUS AND NON-FERROUS FOUNDRY |
BHEL, Hyderabad |
2009-03-31 01:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6288 |
MATERIAL HANDLING IN F P |
BHEL, Hyderabad |
2009-03-31 01:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6287 |
BREAKING OF REJ.NI-HARD ROLLS IN F P |
BHEL, Hyderabad |
2009-03-31 01:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6286 |
REMOVAL OF WASTE SAND INCLUDING WASTES FROM FOUNDRIES AND DUMPING INSIDE THE FACTORY AREA. |
BHEL, Hyderabad |
2009-03-31 12:03:00 |
2009-04-11 12:30:00 |
N/A |
| NIT_6285 |
FINISH MACHINED STEEL SUPPORTING PLATES |
BHEL, Haridwar |
2009-03-31 10:03:00 |
2009-05-07 14:00:00 |
N/A |
| NIT_6284 |
VARIABLE DIA MOULD DELY REQD IN NOV-09 |
BHEL, Jhansi |
2009-03-31 09:03:00 |
2009-05-01 14:00:00 |
N/A |
| NIT_6283 |
DATA ENTRY SERVICES IN OUR OFFICE |
BHEL |
2009-03-30 06:03:00 |
2009-05-15 14:30:00 |
N/A |
| NIT_6282 |
CNC HYDRAULIC PRESS 1000T |
BHEL, Haridwar |
2009-03-30 05:03:00 |
2009-04-30 14:00:00 |
Yes 1 |
| NIT_6281 |
PROCUREMENT OF TUBE TO TUBE SHEET WELDING MACHINE 1 NO. |
BHEL, Trichy |
2009-03-30 03:03:00 |
2009-05-11 14:30:00 |
Yes 1 |
| NIT_6280 |
CONSTRUCTION OF LABORATORY BUILDING FOR COAL RESEARCH CENTRE NEAR WRI COMPLEX AT BHEL, TRICHY. |
BHEL, Trichy |
2009-03-30 03:03:00 |
2009-04-25 15:00:00 |
N/A |
| NIT_6279 |
SUPPLYING OF CABIN ROLLER FOR HTF AND CDF FURNACES. |
BHEL, Trichy |
2009-03-30 02:03:00 |
2009-04-23 14:00:00 |
N/A |
| NIT_6278 |
MISC.SMALL CIVIL MAINTENANCE WORKS INSIDEI FY AREA FOR ONE YEAR. |
BHEL, Jhansi |
2009-03-30 02:03:00 |
2009-04-21 14:00:00 |
Yes 1 |
| NIT_6277 |
CONCRETE PLATE FORM FOR GOLIATH IN FY AREA. |
BHEL, Jhansi |
2009-03-30 01:03:00 |
2009-04-21 14:00:00 |
Yes 1 |
| NIT_6276 |
REVAMPING OF INDUCTION HEATING UNIT, A. SYSTEM BENDER MACHINE. B. PRESURE WELDER MACHINE |
BHEL, Trichy |
2009-03-30 10:03:00 |
2009-04-22 14:00:00 |
N/A |
| NIT_6275 |
TENDER SPECIFICATION BHEL PSSR SCT 1343
TOPOGRAPHICAL SURVEY AND GEOTECHNICAL INVESTIGATION FOR UNIT 1 2 OF 2 X 600 MW AT MALWA THERMAL POWER PROJECT MALWA MADHYA PRADESH |
BHEL, PSSR |
2009-03-30 09:03:00 |
2009-04-20 15:30:00 |
N/A |
| NIT_6274 |
RETROFITTING OF STRAIGHT TUBE BUTT WELDING MACHINE |
BHEL, Trichy |
2009-03-30 09:03:00 |
2009-04-21 14:00:00 |
N/A |
| NIT_6273 |
RETROFITTING OF NEW PLC IN CH6-TUBE BENDING MACHINE |
BHEL, Trichy |
2009-03-30 09:03:00 |
2009-04-20 14:00:00 |
N/A |
| NIT_6272 |
NAME OF WORK PLYING OF 52 SEATER BUSES |
BHEL, Jhansi |
2009-03-29 09:03:00 |
2009-04-17 14:00:00 |
N/A |
| NIT_6271 |
COLLECTION OF C FORMS FROM BHEL CUSTOMERS |
BHEL, Ranipet |
2009-03-28 04:03:00 |
2009-04-30 14:30:00 |
Yes 1 |
| NIT_6270 |
VARIOUS LOW SKILL NATURE ACTIVITIES OF SMALL CORE BUILDING/ASSEMBLY |
BHEL, Jhansi |
2009-03-28 03:03:00 |
2009-04-17 14:00:00 |
N/A |
| NIT_6269 |
NIT FOR SUPPLY OF OPC GRADE 43, AS PER IS_8112 FOR LAKWA SITE, ASSAM |
BHEL, PSER |
2009-03-27 02:03:00 |
2009-04-13 15:00:00 |
Yes 1 |
| NIT_6268 |
SUDDEN SHORT CIRCUIT SWITCH |
BHEL, Haridwar |
2009-03-27 01:03:00 |
2009-05-05 14:00:00 |
N/A |
| NIT_6267 |
SUPPLY OF SULPHATE RESISTING CEMENT CONFORMING TO IS -12330 |
BHEL, PSNR |
2009-03-26 04:03:00 |
2009-04-14 15:30:00 |
Yes 5 |
| NIT_6266 |
SUPPLY OF OPC GR. 43 CEMENT ON EX - WORKS BASIS FOR BHEL KOSTI SITE, SUDAN |
BHEL, PSNR |
2009-03-26 04:03:00 |
2009-04-14 15:30:00 |
Yes 5 |
| NIT_6265 |
MOBILE CRANE CAP. 75TON |
BHEL, Haridwar |
2009-03-26 03:03:00 |
2009-04-30 14:00:00 |
N/A |
| NIT_6264 |
PROCUREMENT OF MERCURY ANALYSER 1 NO. |
BHEL, Trichy |
2009-03-25 04:03:00 |
2009-04-23 14:30:00 |
N/A |
| NIT_6263 |
ELECTRICAL HEATING INSTALLATION WITH DC SUPPLY UNIT |
BHEL, Haridwar |
2009-03-25 10:03:00 |
2009-05-05 14:00:00 |
N/A |
| NIT_6262 |
NIT FOR MATERIAL HANDLING OF PLANT MATERIALS FOR UNIT 1 AND 2 OF 2X500 MW MARWA TPS PROJECT |
BHEL, PSER |
2009-03-24 08:03:00 |
2009-04-15 15:00:00 |
Yes 1 |
| NIT_6261 |
NIT FOR MATERIAL HANDLING OF PLANT MATERIALS FOR 1X500 MW KORBA, WEST TPS PROJECT |
BHEL, PSER |
2009-03-24 08:03:00 |
2009-04-15 15:00:00 |
Yes 1 |
| NIT_6260 |
DESIGN, MANUFACTURING, SUPPLY, ERECTION AND COMMISSIONING OF TELESCOPIC HYDRAULIC LIFT |
BHEL, Haridwar |
2009-03-24 03:03:00 |
2009-05-01 14:00:00 |
N/A |
| NIT_6259 |
DESIGN, MANUFACTURING,SUPPLY, ERECTION, COMMISSIONING AND PROVING OF 45 KW INDUCTION BRAZING MACHINE. |
BHEL, Haridwar |
2009-03-24 03:03:00 |
2009-04-30 14:00:00 |
N/A |
| NIT_6258 |
SANITATION WORKS IN TOWNSHIP FOR THE PERIOD OF TWELVE MONTHS |
BHEL, Jhansi |
2009-03-24 02:03:00 |
2009-03-31 14:00:00 |
N/A |
| NIT_6257 |
OPERATION OF SWIMMING POOL IN TOWNSHIP FOR YEAR 2009 |
BHEL, Jhansi |
2009-03-24 02:03:00 |
2009-04-03 14:00:00 |
Yes 2 |
| NIT_6256 |
RATE CONTRACT FOR PROJECT INSPECTION SERVICES AT 4X125 MW KOSTI TPP, SUDAN FOR FIELD QUALITY ASSURANCE AND CIVIL LABORATORY |
BHEL, PSNR |
2009-03-24 01:03:00 |
2009-03-30 15:30:00 |
Yes 1 |
| NIT_6255 |
NIT FOR CIVIL, STRUCTURAL, ARCHITECTURAL WORK INCLUDING FOUNDATIONS, SUPERSTRUCTURE OF VARIOUS PLANT EQUIPMENTS, SYSTEMS, FACILITIES, NON-PLANT BUILDINGS, FACILITIES, MISC CIVIL WORK, SWITCH YARD CIVIL WORK ETC OF UNIT _ 1 AND 2 OF 726.6 MW GAS BASED CCPP AT PALATANA, UDAIPUR, TRIPURA. |
BHEL, PSER |
2009-03-24 12:03:00 |
2009-04-14 15:00:00 |
Yes 6 |
| NIT_6254 |
ELECTRICAL MAINTENANCE WORK IN TPOWNSHIP ELECTRICAL MAINTENANCE |
BHEL, Jhansi |
2009-03-24 11:03:00 |
2009-04-07 14:00:00 |
N/A |
| NIT_6253 |
SUPPLY , INSTALLATION AND MAINTENANCE OF 40 FAX MACHINES AT BHEL, BHOPAL ON 3 YEAR LEASE BASIS |
BHEL, Bhopal |
2009-03-23 11:03:00 |
2009-04-17 14:30:00 |
N/A |
| NIT_6252 |
PROCUREMENT OF ORBITAL TUBE WELDING MACHINE 1 NO. |
BHEL, Trichy |
2009-03-24 09:03:00 |
2009-04-20 14:30:00 |
N/A |
| NIT_6251 |
PROVIDING OF 10MTS LONG TUBULAR LIGHT HIGH MAST AT BURIAL GROUNDS |
BHEL, Hyderabad |
2009-03-24 08:03:00 |
2009-04-11 13:30:00 |
N/A |
| NIT_6250 |
TRANSFORMER OIL FILTRATIOIN AND OVERHAULING |
BHEL, Hyderabad |
2009-03-24 08:03:00 |
2009-04-11 13:30:00 |
N/A |
| NIT_6249 |
SUPPLY OF CEMENT FOR BHEL - PARICHHA SITE |
BHEL, PSNR |
2009-03-23 03:03:00 |
2009-03-30 15:30:00 |
N/A |
| NIT_6248 |
SUPPLY OF CEMENT TO BHEL - BARSINGSAR SITE |
BHEL, PSNR |
2009-03-23 03:03:00 |
2009-03-30 15:30:00 |
N/A |
| NIT_6247 |
RECEIPT OF EQUIPMENT/ MATERIAL AT SITE, UNLOADING, INSPECTION, VERIFICATION, STORAGE, UP-KEEPING DURING STORAGE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 220 KV SWITCHYARD AT PIPAVAV IN GUJARAT |
BHEL, Industry Sector |
2009-03-23 03:03:00 |
2009-05-12 15:30:00 |
N/A |
| NIT_6246 |
126 NOS OF AIR COOLERS MAINTENANCE AND SERVICING AND REPAIR WORKS |
BHEL, Hyderabad |
2009-03-23 02:03:00 |
2009-03-28 13:30:00 |
N/A |
| NIT_6245 |
TENDER FOR EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 220 KV SUBSTATION AT SIKKA IN GUJARAT |
BHEL, Industry Sector |
2009-03-23 02:03:00 |
2009-04-15 15:30:00 |
N/A |
| NIT_6244 |
EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 400/220 KV SUBSTATION EXTENSION AT BELLARY IN KARNATAKA |
BHEL, Industry Sector |
2009-03-23 02:03:00 |
2009-04-15 15:30:00 |
N/A |
| NIT_6243 |
MOVEMENT OF RAW MATERIALS THROUGH LORRIES TRAILORS AND VANS |
BHEL, Hyderabad |
2009-03-23 02:03:00 |
2009-04-09 14:30:00 |
N/A |
| NIT_6242 |
NIT FOR RUNNING AND MAINTENANCE OF TELEPHONE SYSTEM,DATA AND VOICE SYSTEM, TELECOMMUNICATION SYSTEM AND TELEPHONE LINES FOR BHEL,PSER IN OFFICE AND AT DIFFERENT LOCATIONS OF BHEL BHAWAN, SALT LAKE ,KOLKATA. |
BHEL, PSER |
2009-03-23 02:03:00 |
2009-04-04 15:00:00 |
N/A |
| NIT_6241 |
RENOVATION OF ROOM NO.28 AND TOILETS AT HRDC WORKSHOP. |
BHEL, Hyderabad |
2009-03-20 03:03:00 |
2009-04-08 13:30:00 |
N/A |
| NIT_6240 |
BLACK TOPPING OF EXISTING WBM IN SHIPPING YARD IN FACTORY |
BHEL, Ranipet |
2009-03-20 03:03:00 |
2009-03-27 15:00:00 |
N/A |
| NIT_6239 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK APPLICATION OF REFRACTORY INSULATION WORK AND CONNECTED WORK FOR BOILER AND ITS AUXILIARIES ESP DUCTING AND PIPING WORKS FOR UNIT 1 OF 1 X 500 MW AT KOTHAGUDEM THERMAL POWER PROJECT STAGE VI KHAMMAM DISTRICT ANDHRA PRADESH |
BHEL, PSSR |
2009-03-20 10:03:00 |
2009-04-09 16:30:00 |
N/A |
| NIT_6238 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK APPLICATION OF REFRACTORY INSULATION WORK AND CONNECTED WORK FOR BOILER AND ITS AUXILIARIES ESP DUCTING AND PIPING WORKS FOR UNIT 5 OF 210 MW STAGE III AT RAYALASEEMA THERMAL POWER PROJECT VV REDDY NAGAR KALAMALLA POST CUDDAPAH DISTRICT ANDHRA PRADESH |
BHEL, PSSR |
2009-03-20 10:03:00 |
2009-04-09 15:30:00 |
N/A |
| NIT_6237 |
SUPPLY, INSTALLATION AND COMMISSIONING OF FIBRE OPTIC NETWORK 1 SET |
BHEL, Trichy |
2009-03-20 10:03:00 |
2009-04-28 14:30:00 |
Yes 1 |
| NIT_6236 |
REPLACEMENT OF AC PIPES WITH PVC PIPES FOR TYPE-A QUARTER IN NH-II |
BHEL, Hyderabad |
2009-03-20 09:03:00 |
2009-04-08 13:30:00 |
N/A |
| NIT_6235 |
SUPPLY,INSTALLATION AND MAINTENANCE OF IT EQUIPMENT ON LEASE
UNDERTAKING ANNUAL MAINTENANCE CONTRACT FOR IT EQUIPMENTS |
BHEL, Bangalore |
2009-03-20 09:03:00 |
2009-04-17 13:30:00 |
N/A |
| NIT_6234 |
PROVIDING SERVICES FOR DISTRIBUTION OF DOCUMENTS, HOUSE KEEPING ETC. |
BHEL, Hyderabad |
2009-03-20 09:03:00 |
2009-03-26 13:30:00 |
N/A |
| NIT_6233 |
AUGMENTATION OF CAPACITY OF PUMPS MFG- ANNEXE LIGHTING, PERIPHERY AND BAY LIGHTING WORKS. |
BHEL, Hyderabad |
2009-03-20 08:03:00 |
2009-03-26 13:30:00 |
N/A |
| NIT_6232 |
RECEIPT AT SITE STORES HANDLING ERECTION TESTING AND COMMG OF HT AND LT ELECTRICAL PACKAGE FOR 1 X 210 MW UNIT 5 OF RTPP MUDDANUR AP |
BHEL, PSSR |
2009-03-19 10:03:00 |
2009-04-08 15:30:00 |
Yes 1 |
| NIT_6231 |
CHROMITE SAND
SPECN. FF53685 REV.03 |
BHEL, Haridwar |
2009-03-19 09:03:00 |
2009-04-03 00:00:00 |
N/A |
| NIT_6230 |
SILICO CALCIUM
2-5 MM
SPECN. FF05063 REV .02 |
BHEL, Haridwar |
2009-03-19 09:03:00 |
2009-04-08 00:00:00 |
N/A |
| NIT_6229 |
NICKEL
100 X 100 MM
SPECN. FF05061 REV.00 |
BHEL, Haridwar |
2009-03-19 09:03:00 |
2009-04-04 00:00:00 |
N/A |
| NIT_6228 |
LOW CARBON FERRO MN. |
BHEL, Haridwar |
2009-03-19 09:03:00 |
2009-04-02 00:00:00 |
N/A |
| NIT_6227 |
HIGH CARBON FERRO MN.
50-150 MM
SPECN. FF05005 REV.03 |
BHEL, Haridwar |
2009-03-19 09:03:00 |
2009-03-31 00:00:00 |
N/A |
| NIT_6226 |
FERRO VANADIUM LSP
20-50 MM
SPECN. FF05057 REV.00 |
BHEL, Haridwar |
2009-03-19 09:03:00 |
2009-04-09 00:00:00 |
N/A |
| NIT_6225 |
FERRO SILICON LUMPS
100-150 MM
SPECN.FF05001 REV.04 |
BHEL, Haridwar |
2009-03-18 05:03:00 |
2009-04-02 00:00:00 |
N/A |
| NIT_6224 |
FERRO ALUMINIUM
20-60 MM
SPECN FF05056 REV.00 |
BHEL, Haridwar |
2009-03-18 05:03:00 |
2009-04-10 00:00:00 |
N/A |
| NIT_6223 |
MEDIUM CARBON FERRO MN.
20-40 MM
SPECN. FF05004 REV.03 |
BHEL, Haridwar |
2009-03-18 05:03:00 |
2009-04-08 00:00:00 |
N/A |
| NIT_6222 |
LOW CARBON FERRO CHROME
20-40 MM
SPECN.FF05007 REV.04 |
BHEL, Haridwar |
2009-03-18 05:03:00 |
2009-04-03 00:00:00 |
N/A |
| NIT_6221 |
HIGH CARBON FERRO CHROME |
BHEL, Haridwar |
2009-03-18 05:03:00 |
2009-04-07 00:00:00 |
N/A |
| NIT_6220 |
FERRO SILICON POWDER
0.1- 1MM
SPECN.FF05002 REV.02 |
BHEL, Haridwar |
2009-03-18 04:03:00 |
2009-04-08 00:00:00 |
N/A |
| NIT_6219 |
FERRO MOLY
20-40 MM
SPECN FF05009 REV .03 |
BHEL, Haridwar |
2009-03-18 04:03:00 |
2009-04-07 00:00:00 |
N/A |
| NIT_6218 |
PERIODICAL MACHINE MAINTENANCE PREVENTIVE |
BHEL, Bangalore |
2009-03-18 03:03:00 |
2009-04-10 15:15:00 |
N/A |
| NIT_6217 |
SUPPLY OF PORTA CABINS OF VARIOUS TYPES WITH ALL FITTINGS INCLUDING PAINTING. BIDDERS TO NOTE THAT DATE OF OPENING OF TECHNICAL BIDS IS 26/03/2009 AT 15.30 HRS, NOT AS MENTIONED IN THE NEWSPAPER ADVERTISEMENT. |
BHEL, PSWR |
2009-03-18 02:03:00 |
2009-03-26 15:30:00 |
Yes 7 |
| NIT_6216 |
PROCUREMENT OF 44 MT AMMONIATED EDTA |
BHEL, PSNR |
2009-03-18 02:03:00 |
2009-04-02 15:30:00 |
N/A |
| NIT_6215 |
E T C OF 1X62TPH HRSG 1XFR6 GAS TURBINE GENERATOR, BALANCE OF PLANT EQUIPMENTS STACK ETC AND PROVIDING SERVICES FOR MATERIAL HANDLING AT 1X33.33MW CO GENRATION PLANT AND STEAM PLANT UNIT AT GUJARAT NARMADA VALLEY FERTILIZERS CO LTD DIST BHARUCH GUJARAT |
BHEL, PSWR |
2009-03-18 01:03:00 |
2009-04-09 11:00:00 |
Yes 1 |
| NIT_6214 |
SUPPLY OF HT COPPER CABLES 8 TYPES |
BHEL, Hyderabad |
2009-03-17 05:03:00 |
2009-04-17 14:30:00 |
N/A |
| NIT_6213 |
FINISH MACHINED LP SHAFT 500MW
81.8 MT WITH ADVANCE CLASS
BLADING AND FIR-TREE GROOVES |
BHEL, Haridwar |
2009-03-17 04:03:00 |
2009-04-20 14:00:00 |
N/A |
| NIT_6212 |
SUPPLY OF LT POWER CABLE |
BHEL, Hyderabad |
2009-03-17 03:03:00 |
2009-04-22 14:30:00 |
N/A |
| NIT_6211 |
SUPPLY OF CONTROL CABLES |
BHEL, Hyderabad |
2009-03-17 02:03:00 |
2009-04-23 14:30:00 |
N/A |
| NIT_6210 |
SUPPLY OF POWER CABLE FOR VPI PLANT |
BHEL, Hyderabad |
2009-03-17 01:03:00 |
2009-04-30 14:30:00 |
N/A |
| NIT_6209 |
SUPPLY OF TPN SWITCHES |
BHEL, Hyderabad |
2009-03-17 01:03:00 |
2009-04-18 14:30:00 |
N/A |
| NIT_6208 |
SUPPLY OF CEILLING FANS |
BHEL, Hyderabad |
2009-03-17 01:03:00 |
2009-04-30 14:30:00 |
N/A |
| NIT_6207 |
SUPPLY OF INDUSTRIAL MAN COOLERS |
BHEL, Hyderabad |
2009-03-17 01:03:00 |
2009-04-28 14:30:00 |
N/A |
| NIT_6206 |
CONSTRUCTION OF ADDITIONAL ROOM FOR TYPE A-48 UNITS, CONSTRUCTION OF TYPE B-96 UNITS AND CONSTRUCTION OF TYPE D-8 UNITS ALONG WITH SERVANT QUARTERS IN BHEL TOWNSHIP. |
BHEL, Ranipet |
2009-03-17 11:03:00 |
2009-04-24 14:30:00 |
Yes 2 |
| NIT_6205 |
100 KVA CAPACITY VOLTAGE STABLIZER |
BHEL, Haridwar |
2009-03-17 11:03:00 |
2009-04-21 14:00:00 |
Yes 1 |
| NIT_6204 |
SCREW TYPE AIR COMPRESSOR 71 CFM CAPACITY @ 5 KG/CM2 WITH AIR DRYER |
BHEL, Haridwar |
2009-03-17 11:03:00 |
2009-04-21 14:00:00 |
Yes 1 |
| NIT_6203 |
REPLACING OF OLD AGED A.C. SHEETS WITH ZINCALUME COLOUR COATED METAL SHEETS INSIDE CLADDING IN ALL SHOPS AND MP SHOP ROOF |
BHEL, Ranipet |
2009-03-17 11:03:00 |
2009-04-23 14:30:00 |
Yes 2 |
| NIT_6202 |
DESIGN, DETAILED ENGINEERING AND SUBMISSION OF CONSTRUCTION DRAWINGS FOR PIPAVAV, PRAGATI AND NORTH CHENNAI DESALINATION PROJECTS |
BHEL, Ranipet |
2009-03-17 11:03:00 |
2009-04-22 14:30:00 |
Yes 3 |
| NIT_6201 |
APPLICATION OF PAINTS FOR BOILERS AND THEIR AUXILIARIES, TG , AUXILIARIES, LP PIPING AND STRUCTURES AND HANGERS , SUPPORTS OF LP PIPING, POWER CYCLE PIPING, TANKS AND VESSELS, AND OTHER EQUIPMENTS, PAINTING OF COLOUR BANDS, LETTERING, MARKING AND SIGNS FOR DIRECTION OF FLOW, ROTATION, NAMEPLATES ETC OF 3X33MW, UNITS -1, 2 , 3 AT BORL BINA, MP |
BHEL, PSWR |
2009-03-17 11:03:00 |
2009-04-07 11:00:00 |
N/A |
| NIT_6200 |
SUPPLY OF POWER CABLE |
BHEL, Hyderabad |
2009-03-17 11:03:00 |
2009-04-24 14:30:00 |
N/A |
| NIT_6199 |
SUPPLY OF 415 V AC MCC |
BHEL, Hyderabad |
2009-03-17 10:03:00 |
2009-04-29 14:30:00 |
N/A |
| NIT_6198 |
RATE CONTRACT FOR GEO TECHNICAL INVESTIGATION AND TOPOGRAPHICAL SURVEY FOR VARIOUS FORTH-COMING POWER PROJECTS IN INDIA AT MADHYAPRADESH, CHHATTISGARH, MAHARASTRA, GUJARAT AND GOA WITHIN BHEL POWER SECTOR WESTERN REGION |
BHEL, PSWR |
2009-03-17 10:03:00 |
2009-04-07 11:00:00 |
N/A |
| NIT_6197 |
SUPPLY OF COPPER ARMOURED CABLE |
BHEL, Hyderabad |
2009-03-17 10:03:00 |
2009-04-29 14:30:00 |
N/A |
| NIT_6196 |
SUPPLY OF CABLE TRAYS |
BHEL, Hyderabad |
2009-03-17 09:03:00 |
2009-04-21 14:30:00 |
N/A |
| NIT_6195 |
SUPPLY OF BED PLATES |
BHEL, Hyderabad |
2009-03-17 09:03:00 |
2009-04-25 14:30:00 |
N/A |
| NIT_6194 |
SUPPLY OF STREET LIGHT FITTINGS |
BHEL, Hyderabad |
2009-03-17 08:03:00 |
2009-04-25 14:30:00 |
N/A |
| NIT_6193 |
SUPPLY OF HIGH BAY LIGHT FITTINGS |
BHEL, Hyderabad |
2009-03-16 08:03:00 |
2009-04-30 14:30:00 |
N/A |
| NIT_6192 |
SUPPLY OF LIGHT FITTINGS |
BHEL, Hyderabad |
2009-03-16 07:03:00 |
2009-04-25 14:30:00 |
N/A |
| NIT_6191 |
SUPPLY OF GI FLATS |
BHEL, Hyderabad |
2009-03-16 07:03:00 |
2009-04-29 14:30:00 |
N/A |
| NIT_6190 |
SUPPLY OF LOOP ISOLATION VALVES |
BHEL, Hyderabad |
2009-03-16 06:03:00 |
2009-05-30 14:30:00 |
N/A |
| NIT_6189 |
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF CW PIPING, ACW PIPING AND DM WATER PIPING SYSTEMS AND VARIOUS BALANCE PIPING SYSTEMS INSTRUMENT AIR, SERVICE AIR, DRINKING WATER, SERVICE WATER ETC OF UNIT _ 1 AND 2 FOR 2X500 MW UNITS AT KODERMA THERMAL POWER STATION, JHARKHAND |
BHEL, PSER |
2009-03-16 06:03:00 |
2009-04-07 15:00:00 |
Yes 1 |
| NIT_6188 |
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF CW PIPING, ACW PIPING AND DM WATER PIPING SYSTEMS AND VARIOUS BALANCE PIPING SYSTEMS _INSTRUMENT AIR, SERVICE AIR, DRINKING WATER, SERVICE WATER ETC_ OF UNIT _ 1 AND 2 FOR 2X500 MW UNITS AT DURGAPUR STEEL THERMAL POWER STATION, WEST BENGAL |
BHEL, PSER |
2009-03-16 05:03:00 |
2009-04-07 15:00:00 |
Yes 1 |
| NIT_6187 |
SUPPLY OF HT LT CABLES |
BHEL, Hyderabad |
2009-03-16 11:03:00 |
2009-04-21 14:30:00 |
N/A |
| NIT_6186 |
SUPPLY OF CNC TURN MILL , DIA 800X5000 MM |
BHEL, Hyderabad |
2009-03-16 11:03:00 |
2009-04-25 14:30:00 |
N/A |
| NIT_6185 |
SUPPLY OF POLYURETHENE INSULATED PANEL 30MM THICK FOR A/D ROOFING |
BHEL, Hyderabad |
2009-03-16 10:03:00 |
2009-04-25 14:30:00 |
Yes 2 |
| NIT_6184 |
SUPPLY OF BOROSCOPE |
BHEL, Hyderabad |
2009-03-16 10:03:00 |
2009-04-23 14:30:00 |
N/A |
| NIT_6183 |
SUPPLY OF FDB |
BHEL, Hyderabad |
2009-03-16 09:03:00 |
2009-05-21 14:30:00 |
N/A |
| NIT_6182 |
MATERIAL HANDLING, CLEANING, MAINTENANCE AND SERVICES AND HOUSE KEEPING |
BHEL, Hyderabad |
2009-03-15 09:03:00 |
2009-04-04 14:00:00 |
Yes 1 |
| NIT_6181 |
SUPPLY OF RAIL FIXING CLAMPS |
BHEL, Hyderabad |
2009-03-14 08:03:00 |
2009-04-22 14:30:00 |
N/A |
| NIT_6180 |
NIT FOR RATE CONTRACT FOR SUPPLY OF PROVISIONS AS PER ANNEXURE FOR BHEL R AND D CANTEEN |
BHEL |
2009-03-14 05:03:00 |
2009-04-04 14:00:00 |
N/A |
| NIT_6179 |
SUPPLY OF HARDNESS TESTER |
BHEL, Hyderabad |
2009-03-14 04:03:00 |
2009-04-17 14:30:00 |
N/A |
| NIT_6178 |
SUPPLY OF RAIL FIXING CLAMPS |
BHEL, Hyderabad |
2009-03-14 03:03:00 |
2009-04-24 14:30:00 |
N/A |
| NIT_6177 |
BRIDGE CRANE SYSTEM |
BHEL, Bangalore |
2009-03-14 10:03:00 |
2009-03-30 13:30:00 |
N/A |
| NIT_6176 |
RECEIPT UNLOADING ERECTION COMMISSIONING OF STATION C AND I WORK AT NTPC DADRI STAGEII |
BHEL, Bangalore |
2009-03-14 08:03:00 |
2009-04-06 14:30:00 |
N/A |
| NIT_6175 |
SUPPLY OF FABRICATED TEES AND Y-PIECES AS PER DRG. |
BHEL, Piping Centre |
2009-03-13 04:03:00 |
2009-04-03 14:30:00 |
N/A |
| NIT_6174 |
LIMITED TENDER - INSTALLATION OF MAN COOLERS IN 09 CDC BAY. |
BHEL, Hyderabad |
2009-03-12 01:03:00 |
2009-03-16 13:30:00 |
N/A |
| NIT_6173 |
SUPPLY OF HEAVY DUTY INDUSTRIAL AIR BLOWER WITH COMPLETE ACCESSARIES |
BHEL, PSNR |
2009-03-12 11:03:00 |
2009-03-27 15:30:00 |
N/A |
| NIT_6172 |
VALUATION OF ASSETS OF FOUNDRY FORGE PLANT OF HEC, RANCHI |
BHEL, Varanasi |
2009-03-10 10:03:00 |
2009-04-06 00:00:00 |
N/A |
| NIT_6171 |
HIRING OF 3WHEELER AUTOTROLLY ON 2YR RATECONTRACT |
BHEL, Hyderabad |
2009-03-11 10:03:00 |
2009-03-17 13:30:00 |
N/A |
| NIT_6170 |
EMPANNELMENT OF LUC-CARS ON HIRE ON 2YR.RATECONTRACT |
BHEL, Hyderabad |
2009-03-11 10:03:00 |
2009-03-17 13:30:00 |
N/A |
| NIT_6169 |
TENDER ENQUIRY FOR ANNUAL MAINTENANCE CONTRACT OF COMPUTERS, SYSTEM ADMINISTRATION AND TOTAL NETWORKING SOLUTIONS |
BHEL |
2009-03-10 05:03:00 |
2009-04-01 15:30:00 |
N/A |
| NIT_6168 |
ANNUAL MAINTENANCE CONTRACT FOR MACHINE TOOLS_EQUIPMENT_LIGHTING IN 207_TOOL ROOM AND 210-SPARES MANUFACTURING CENTRE AND ELECT MAINT OF 07-ANNEXE AND CGC BUILDINGS FOR TWO YEARS PERIOD |
BHEL, Hyderabad |
2009-03-10 04:03:00 |
2009-04-15 14:30:00 |
Yes 1 |
| NIT_6167 |
BOTTOM SHAFT FORGING TO DRG NO 22540187501 REV 00 AND. PRODUCT STANDARD HG 10035 REV 05 |
BHEL, Bhopal |
2009-03-10 04:03:00 |
2009-03-31 02:00:00 |
N/A |
| NIT_6166 |
HANDLING AT SITE STORES STORAGE YARD TRANSPORTATION TO SITE OF WORK ERECTION TESTING AND COMMISSIONING OF ROTATING EQUIPMENTS AND ITS AUXILIARIES INCLUDING SUPPLY APPLICATION OF FINAL PAINTING FOR UNIT 5 OF 210 MW SET STAGE III RTPP MUDDANUR |
BHEL, PSSR |
2009-03-10 04:03:00 |
2009-04-01 15:30:00 |
N/A |
| NIT_6165 |
SANITATION WORKS IN TOWNSHIP FOR THE PERIOD OF TWELVE MONTHS |
BHEL, Jhansi |
2009-03-10 11:03:00 |
2009-03-24 14:00:00 |
N/A |
| NIT_6164 |
PROCUREMENT OF SUBMERGED ARC WELDING SAW MACHINE COLUMN AND BOOM TYPE 1 NO. |
BHEL, Trichy |
2009-03-10 10:03:00 |
2009-04-09 14:30:00 |
N/A |
| NIT_6163 |
PROCUREMENT OF THERMAL GRAVIMETRIC ANALYSER 1 NO. |
BHEL, Trichy |
2009-03-09 02:03:00 |
2009-04-08 14:30:00 |
N/A |
| NIT_6162 |
PROCUREMENT OF DIFFERENTIAL SCANNING CALORIMETER 1 NO. |
BHEL, Trichy |
2009-03-09 01:03:00 |
2009-04-08 14:30:00 |
N/A |
| NIT_6161 |
10 HAND PUMPS BORING WORK FOR VILLAGES NEARBY BHEL AND CONSTRUCTION OF TWO WATER HUTS NEAR BHEL |
BHEL, Jhansi |
2009-03-09 11:03:00 |
2009-03-20 14:00:00 |
N/A |
| NIT_6160 |
PROCUREMENT OF PTMT AND PVC SANITARY ITEMS AND FITTINGS |
BHEL, Bhopal |
2009-03-06 11:03:00 |
2009-04-16 02:00:00 |
N/A |
| NIT_6159 |
MAINTENANCE OF ELECTRIC SUBMERSIBLE WATER PUMP SET AND CENTRIFUGAL BOOSTER PUMPS FOR WATER SUPPLY IN TOWNSHIP FOR THE PERIOD OF TWO YEARS 2008-09 AND 2009-10 |
BHEL, Jhansi |
2009-03-08 02:03:00 |
2009-03-17 14:00:00 |
N/A |
| NIT_6158 |
COIL ASSEMBLY PLATFORM DELY REQD IN AUG 09. |
BHEL, Jhansi |
2009-03-08 09:03:00 |
2009-03-31 14:00:00 |
N/A |
| NIT_6157 |
NIT FOR SUPPLY, ERECTION, TESTING, COMMISSIONING OF EQUIPMENT, SYSTEMS AND STABILIZATION, MAINTENANCE WORK OF CONSTRUCTION POWER DISTRIBUTION SYSTEM INCLUDING OBTAINING CLEARANCES FROM VARIOUS AUTHORITIES FOR UNIT _ 1 AND 2 , 726.6 MW GAS BASED CCPP AT PALATANA, UDAIPUR, TRIPURA |
BHEL, PSER |
2009-03-07 05:03:00 |
2009-03-31 15:00:00 |
Yes 1 |
| NIT_6156 |
RETROFITTING OF CONVEYOR SYSTEM FOR COLD NDT MACHINE |
BHEL, Trichy |
2009-03-07 02:03:00 |
2009-03-28 15:00:00 |
N/A |
| NIT_6155 |
CONSTRUCTION OF FOUNDATION FOR COIL PRESHRINK HEATER IN BAY - 6 IN FACTORY AREA. |
BHEL, Jhansi |
2009-03-07 01:03:00 |
2009-03-27 14:00:00 |
N/A |
| NIT_6154 |
REPAIR AND MAINTENANCE OF BHEL RAILWAY SIDING 2009-10. |
BHEL, Jhansi |
2009-03-07 12:03:00 |
2009-03-27 14:00:00 |
N/A |
| NIT_6153 |
ANNUAL RATE CONTRACT FOR MIS CIVIL WORK IN FACTORY AREA FOR YEAR 2009-10 |
BHEL, Jhansi |
2009-03-07 12:03:00 |
2009-03-27 14:00:00 |
N/A |
| NIT_6152 |
REGISTRATION OF VENDORS FOR SUPPLY OF PLATES, SHEETS, STRUCTURALS, ROUNDS AND PIPES. |
BHEL, Hyderabad |
2009-03-07 11:03:00 |
2009-04-10 14:00:00 |
N/A |
| NIT_6151 |
SUPPLY OF OPC GR. 43 CEMENT FOR BHEL - BAWANA SITE. |
BHEL, PSNR |
2009-03-06 04:03:00 |
2009-03-13 15:30:00 |
N/A |
| NIT_6150 |
ZONAL STRUCTURAL WORKS FOR 2009-10 AND 2010-11 |
BHEL, Ranipet |
2009-03-06 02:03:00 |
2009-03-21 15:00:00 |
N/A |
| NIT_6149 |
PROCUREMENT OF ULTRASONIC IMAGING SYSTEM 1 NO. |
BHEL, Trichy |
2009-03-06 01:03:00 |
2009-04-06 14:30:00 |
N/A |
| NIT_6148 |
SITE SERVICES IN OIL RIGS INCLUDING RANDU, EANDC,TROUBLE SHOOTING WORK |
BHEL, Bhopal |
2009-03-06 12:03:00 |
2009-03-23 14:30:00 |
N/A |
| NIT_6147 |
GUARDING OF BICYCLES, MOTOR CYCLES. SCOOTER AND CARS KEPT AT THE STAND LOCATED AT MAIN GATE AND MATERIAL GATE BHEL, JHANSI. |
BHEL, Jhansi |
2009-03-06 11:03:00 |
2009-03-20 14:00:00 |
N/A |
| NIT_6146 |
EXHAUST DUCTING |
BHEL, Hyderabad |
2009-03-10 10:03:00 |
2009-04-07 11:00:00 |
N/A |
| NIT_6145 |
NIT FOR SCADA BASED CONTROL SYSTEM FOR PECVD - 1NO |
BHEL |
2009-03-05 06:03:00 |
2009-04-02 14:00:00 |
N/A |
| NIT_6144 |
NIT FOR 500KW AC INDUCTION MOTOR WITH VFD DRIVE |
BHEL |
2009-03-05 06:03:00 |
2009-04-02 14:00:00 |
N/A |
| NIT_6143 |
NIT FOR HV TESTING OF 420KV COMPACT GIS - RATE CONTRACT |
BHEL |
2009-03-05 06:03:00 |
2009-03-28 14:00:00 |
N/A |
| NIT_6142 |
NIT FOR DESIGN, FABRICATION, ERECTION AND COMMISSIONING OF ACID TEXTURISATION SYSTEM |
BHEL |
2009-03-05 05:03:00 |
2009-04-02 14:00:00 |
N/A |
| NIT_6141 |
PROCUREMENT OF ULTRASONIC IMAGING SYSTEM 1 NO |
BHEL, Trichy |
2009-03-05 03:03:00 |
2009-04-06 14:30:00 |
N/A |
| NIT_6140 |
ACCOUSTIC ENCLOSURE |
BHEL, Hyderabad |
2009-03-10 03:03:00 |
2009-04-07 13:00:00 |
N/A |
| NIT_6139 |
INLET DUCTING |
BHEL, Hyderabad |
2009-03-10 02:03:00 |
2009-09-07 11:00:00 |
N/A |
| NIT_6138 |
PROCUREMENT OF CI PIPES SPECIALS AND VALVES |
BHEL, Trichy |
2009-03-05 10:03:00 |
2009-03-20 14:30:00 |
N/A |
| NIT_6137 |
OFF-LOADING OF THE WORK RELATED TO SHIFTING OF FILES/RECORDS/COMPUTERS |
BHEL, Hyderabad |
2009-03-05 09:03:00 |
2009-03-20 14:30:00 |
N/A |
| NIT_6136 |
SITE SERVICES OF SWGR IN ANDHRA PRADESH AREA |
BHEL, Bhopal |
2009-03-03 04:03:00 |
2009-03-30 14:30:00 |
N/A |
| NIT_6135 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF 4 X 125 MW TG SETS AND BOP PACKAGES AT KOSTI TPP, 4 X 125 MW UNITS, SUDAN |
BHEL, PSNR |
2009-03-04 04:03:00 |
2009-04-20 15:30:00 |
Yes 3 |
| NIT_6134 |
NIT FOR MATERIAL UNLOADING, HANDLING/MATERIALS MANAGEMENT OF PLANT MATERIAL OF BOTH THE UNITS OF 2 X 660 BARH STPS, BIHAR |
BHEL, PSER |
2009-03-04 03:03:00 |
2009-03-25 15:00:00 |
Yes 3 |
| NIT_6133 |
SUPPLY AND INITIAL SUPERVISION OF INSTALLATION OF FIELD JOINT COATING MATERIAL FOR THREE LAYER POLYPROPYLENE COATED PIPELINES FOR 4X125 MW KOSTI TPP, SUDAN |
BHEL, PSNR |
2009-03-04 02:03:00 |
2009-03-23 15:30:00 |
N/A |
| NIT_6132 |
HIRING OF 100MT CRAWLER CRANES FOR DEPLOYMENT AT PARICHHA SITE OF POWER SECTOR NORTHERN REGION. |
BHEL, PSNR |
2009-03-04 02:03:00 |
2009-03-18 15:30:00 |
Yes 1 |
| NIT_6131 |
CIVIL WORKS FOR RE-ROUTING OF COOLING WATER LINES AT NEW BALANCING TUNNEL AT BLOCK 01 WEST |
BHEL, Hyderabad |
2009-03-04 02:03:00 |
2009-03-27 13:30:00 |
N/A |
| NIT_6130 |
SUPPLY OF HEAVY DUTY PNEUMATIC WRENCH TORQUE 2700 NM |
BHEL IVP Goindval |
2009-03-03 05:03:00 |
2009-03-18 15:30:00 |
N/A |
| NIT_6129 |
SUPPLY OF COPPER CABLE |
BHEL, Haridwar |
2009-03-03 02:03:00 |
2009-03-31 14:00:00 |
Yes 2 |
| NIT_6128 |
SUPPLY, ERECTION AND COMMISSIONING OF 2 SETS OF PASSENGER CUM GOOD ELEVATOR |
BHEL, Trichy |
2009-03-02 03:03:00 |
2009-03-23 14:30:00 |
N/A |
| NIT_6127 |
DESIGN VETTING OF A PRE SUPPLIED HYDRAULIC PROFILE OF FRANCIS TYPE HYDRO TURBINE |
BHEL, Bhopal |
2009-01-08 03:03:00 |
2009-02-27 02:30:00 |
N/A |
| NIT_6126 |
NIT FOR PREPARATION AND SERVING OF LUNCH AND TEA FOR BHEL, PSER AT BHEL BHAWAN, 9/1, DJ BLOCK, SALT LAKE CITY, SECTOR-II, KOLKATA-700 091 |
BHEL, PSER |
2009-03-02 12:03:00 |
2009-03-24 15:00:00 |
Yes 1 |
| NIT_6125 |
PROCUREMENT OF BATTERY POWERED TRANSFER CAR 30 T CAPACITY 3 NOS. |
BHEL, Trichy |
2009-03-02 11:03:00 |
2009-04-04 14:30:00 |
N/A |
| NIT_6124 |
TRANSPORTATION OF IDENTIFIED CONSIGNMENTS FROM BHOPAL UNIT AND SUPPLIERS WORK TO PROJECT SITES |
BHEL, Bhopal |
2009-03-02 11:03:00 |
2009-03-27 14:30:00 |
N/A |
| NIT_6123 |
AS PER SCHEDULE A |
BHEL, Bhopal |
2009-03-02 10:03:00 |
2009-03-19 04:00:00 |
N/A |
| NIT_6122 |
PROCUREMENT OF FTNMR SPECTROMETER 1 NO. |
BHEL, Trichy |
2009-03-02 10:03:00 |
2009-04-20 14:30:00 |
Yes 1 |
| NIT_6121 |
REPAIRS AND RENOVATION OF BHEL GUEST HOUSE AT KHETAN BHAVAN |
BHEL, ROD |
2009-03-02 10:03:00 |
2009-03-23 00:00:00 |
N/A |
| NIT_6120 |
BLACK TOPPING OF EXISTING WBM SURFACE IN SHIPPING YARD |
BHEL, Ranipet |
2009-03-02 10:03:00 |
2009-03-06 15:00:00 |
N/A |
| NIT_6119 |
PROCUREMENT OF CROSS PIERCING AND ELONGATION MILL FOR SEAMLESS STEEL TUBE MANUFACTURING 1 NO. |
BHEL, Trichy |
2009-02-28 03:02:00 |
2009-03-26 14:30:00 |
N/A |
| NIT_6118 |
PROCUREMENT OF POWDER PARTICLE SIZE DISTRIBUTION ANALYSER 1 NO. |
BHEL, Trichy |
2009-02-28 02:02:00 |
2009-04-03 14:30:00 |
N/A |
| NIT_6117 |
DISMANTLING, ASSISTING IN ASSEMBLY OF OIL RIGS ITEMS AND DRILLING, TAPPING, WELDING DURING ASSEMBLY. |
BHEL, Hyderabad |
2009-02-28 12:02:00 |
2009-03-14 15:30:00 |
N/A |
| NIT_6116 |
MATERIAL HANDLING CLEANING MAINTENANCE SERVICES ACTIVITIES AND HOUSE KEEPING |
BHEL, Hyderabad |
2009-02-28 12:02:00 |
2009-03-14 15:30:00 |
N/A |
| NIT_6115 |
PROCUREMENT OF DROP TUBE FURNACE SYSTEM 1 NO. |
BHEL, Trichy |
2009-02-28 10:02:00 |
2009-05-21 14:30:00 |
Yes 3 |
| NIT_6114 |
PROCUREMENT OF INDUCTIVELY COUPLED PLASMA WITH MASS SPECTROMETER SYSTEM |
BHEL, Trichy |
2009-02-28 08:02:00 |
2009-04-10 14:30:00 |
Yes 1 |
| NIT_6113 |
NIT FOR SITE LEVELING AND GRADING, CIVIL, STRUCTURAL AND ARCHITECTURAL JOB OF POWER BLOCK _ 1 AND POWER BLOCK _2 WITH ALL AUXILIARY BUILDING AND OTHER MISC FOUNDATIONS AND STRUCTURES FOR U -1 AND 2 OF 2X500 MW MARWA PROJECT, CHATTISGARH |
BHEL, PSER |
2009-02-27 03:02:00 |
2009-03-21 15:00:00 |
Yes 7 |
| NIT_6112 |
NIT FOR SITE LEVELING AND GRADING, CIVIL, STRUCTURAL AND ARCHITECTURAL JOB OF POWER BLOCK WITH AUXILIARY BUILDING AND OTHER MISC FOUNDATIONS AND STRUCTURES FOR U-1 OF 1X500 MW KORBA -W PROJECT, CHATTISGARH. |
BHEL, PSER |
2009-02-27 03:02:00 |
2009-03-21 15:00:00 |
Yes 8 |
| NIT_6111 |
PROCUREMENT OF X-RAY FLUORESCENCE SPECTROMETER 1 NO. |
BHEL, Trichy |
2009-02-27 03:02:00 |
2009-04-15 14:30:00 |
Yes 2 |
| NIT_6110 |
MOBILE TOOL CABINET |
BHEL, Bangalore |
2009-02-27 12:02:00 |
2009-03-13 13:30:00 |
N/A |
| NIT_6109 |
RATE CONTRACT FOR PHOTOCOPYING JOB/WORK |
BHEL |
2009-02-24 12:02:00 |
2009-03-12 00:00:00 |
N/A |
| NIT_6108 |
EMPANELLING OF SERVICE PROVIDES FOR CONDUCTING 3000 NOS. OF REVERSE AUCTIONS IN ALL UNITS OF BHEL UP TO 31.03.2010 |
BHEL, Trichy |
2009-02-27 10:02:00 |
2009-03-20 14:30:00 |
N/A |
| NIT_6107 |
DESIGN, MANUFACTURE AND SUPPLY OF MEDIUM VOLTAGE, FLOOR MOUNTING, FREE STANDING, INDOOR, CUBICAL TYPE SWITCHGEAR COMPRISING AIR CIRCUIT BREAKER FEEDERS |
BHEL, Trichy |
2009-02-26 03:02:00 |
2009-03-27 14:30:00 |
N/A |
| NIT_6106 |
PROCUREMENT OF ULTIMATE ANALYSER AS PER THE TECHNICAL SPECIFICATION |
BHEL, Trichy |
2009-02-26 02:02:00 |
2009-04-01 14:30:00 |
N/A |
| NIT_6105 |
MISCELLANEOUS QUARTER REPAIR AT DARIBA CPP, RAJASAMAND, RAJASTHAN |
BHEL, PSNR |
2009-02-26 11:02:00 |
2009-03-20 15:30:00 |
Yes 3 |
| NIT_6104 |
PROCUREMENT GLOBE VALVE 3/4 INCHES 250 NOS |
BHEL, Trichy |
2009-02-26 11:02:00 |
2009-03-26 14:30:00 |
N/A |
| NIT_6103 |
PROCUREMENT OF ZETA METER AS PER THE TECHNICAL SPECIFICATION |
BHEL, Trichy |
2009-02-26 10:02:00 |
2009-03-31 14:30:00 |
N/A |
| NIT_6102 |
NIT FOR ERECTION AND COMMISSIONING OF HT-LT TRANSFORMER, HT-LT BUS DUCTS, DG SET ETC. AT 2 X 500 MW, UNIT- 1 AND 2 MEJIA PH-II PROJECT |
BHEL, PSER |
2009-02-25 07:02:00 |
2009-03-18 15:00:00 |
Yes 1 |
| NIT_6101 |
TO SUPPLY VEGETABLES TO INDUSTRIAL CANTEEN |
BHEL, Hyderabad |
2009-02-25 06:02:00 |
2009-03-19 14:30:00 |
N/A |
| NIT_6100 |
TO SUPPLY PROVISIONS TO CANTEEN ON MONTHLY BASIS |
BHEL, Hyderabad |
2009-02-25 06:02:00 |
2009-03-19 14:30:00 |
N/A |
| NIT_6099 |
ROUTE SURVEY, DESIGN INCLUDING FOUNDATION DESIGN, PROTO TESTING, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF THE TRANSMISSION LINE AND INTERMEDIATE TOWERS BETWEEN GT YARD AND 400KV SWITCHYARD AT 4X100 MW HYDROELECTRIC PROJECT, KOTESHWAR IN UTTARAKHAND |
BHEL, Industry Sector |
2009-02-25 03:02:00 |
2009-04-08 15:30:00 |
N/A |
| NIT_6098 |
SOIL INVESTIGATION WORK AND EARTH RESISTIVITY TEST AT VARIOUS SITES OF ELECTRICAL SUBSTATIONS SPREAD ALL OVER INDIA ON RATE CONTRACT BASIS FOR A PERIOD OF TWO YEARS |
BHEL, Industry Sector |
2009-02-25 01:02:00 |
2009-03-25 15:30:00 |
N/A |
| NIT_6097 |
OFF LOADING OF BALANCING TUNNEL ACTIVITIES ASSEMBLY AND DISASSEMBLY OF ROTORS FOR BALANCING TUNNEL OPERATIONS |
BHEL, Hyderabad |
2009-02-25 08:02:00 |
2009-03-12 13:30:00 |
N/A |
| NIT_6096 |
DESIGN, ENGINEERING, MANUFACTURE, SUPPLY ,ERECTION AND COMMISSIONING OF
C. CIVIL WORKS ENQUIRY NO. 88/08/6041/NSA SPECIFICATION NO. IS-1-08-2013-003 |
BHEL, Bangalore |
2009-02-25 08:02:00 |
2009-05-22 15:00:00 |
Yes 4 |
| NIT_6095 |
NIT FOR RECEIPT OF MATERIAL FROM STORES, TRANSPORTATION TO WORK SITE ERECTION, TESTING AND COMMISSIONING AND HANDING OVER OF TURBINE AND AUXILIARIES, GENERATOR AND AUXILIARIES PUMPS, PIPINGS, MISC. EQUIPMENTS ETC. FOR 1X250 MW SANTALDIH TPS, PURULIA, WEST BENGAL |
BHEL, PSER |
2009-02-24 03:02:00 |
2009-03-18 15:00:00 |
Yes 1 |
| NIT_6094 |
JUNGLE CLEANING IN FACTORY AREA |
BHEL, Jhansi |
2009-02-24 01:02:00 |
2009-03-10 14:00:00 |
N/A |
| NIT_6093 |
NIT FOR HANDLING, ERECTION, CIVIL WORKS, ETC OF CW PIPING SYSTEM FOR 1X37.2 MW LAKWA WHRP PHASE-I, ASSAM |
BHEL, PSER |
2009-02-24 09:02:00 |
2009-03-12 15:00:00 |
Yes 2 |
| NIT_6092 |
TRANSPORTATION OF URGENT CONSIGNMENT ON DOOR TO DOOR CARGO BASIS |
BHEL, Hyderabad |
2009-02-24 08:02:00 |
2009-03-12 14:30:00 |
N/A |
| NIT_6091 |
NIT FOR PC BASED 20 CHANNEL DATA ACQUISITION SYSTEM - 1NO |
BHEL |
2009-02-23 07:02:00 |
2009-03-19 14:00:00 |
N/A |
| NIT_6090 |
NIT FOR OMICRON SCRIPT FUNCTIONS |
BHEL |
| | | |