NIT No |
Description |
Unit |
Notification Date |
Date of Opening of Bids |
Corrigendum (if any) No. |
| NIT_5394 |
LIFTING OF THE BOILER DRUMS BY MEANS OF STRAND JACKS METHOD AT DIFFERENT SITES OF PSNR PROJECTS |
BHEL, PSNR |
2008-10-10 06:10:00 |
2008-10-23 15:30:00 |
N/A |
| NIT_5393 |
ERECTION TESTING AND COMMISSIONING OF 1X500MW STEAM TURBINE GENRATOR AND AUX FOR UNIT 5 AT KHAPARKHEDA TPS OF MSPGCL AT NAGPUR MAHARASTRA |
BHEL, PSWR |
2008-10-10 06:10:00 |
2008-10-22 11:00:00 |
N/A |
| NIT_5392 |
REPLACEMENT OF DAMAGED GLASS AND GLASS FACADE CLEANING WORK OF HRDI BLDG NOIDA |
BHEL |
2008-10-07 03:10:00 |
2008-10-29 00:00:00 |
N/A |
| NIT_5391 |
AL.NOTCHED BAR
AL.SHOTS
AS PER SPENC.AA11314
REV.00 |
BHEL, Haridwar |
2008-10-10 01:10:00 |
2008-10-21 14:00:00 |
N/A |
| NIT_5390 |
STEEL SHOTS
AS PER IS 4606-1983 |
BHEL, Haridwar |
2008-10-10 01:10:00 |
2008-10-29 14:00:00 |
N/A |
| NIT_5389 |
IRON POWDER |
BHEL, Haridwar |
2008-10-10 11:10:00 |
2008-10-22 14:00:00 |
N/A |
| NIT_5388 |
M.S. PIPE 8 MM DIA
M.S. PIPE 20MM DIA
FOR OXYGEN LANCING |
BHEL, Haridwar |
2008-10-10 11:10:00 |
2008-10-23 14:00:00 |
N/A |
| NIT_5387 |
SUPPLY OF 02 NOS.MOTORISED SLIDING DOORS, DELY REQD IN JAN-09 |
BHEL, Jhansi |
2008-10-10 09:10:00 |
2008-11-04 14:00:00 |
N/A |
| NIT_5386 |
SUPPLY OF 01 NO.PHACO EMULSIFICATION SYSTEM, DELIVERY REQD IN JAN-09 |
BHEL, Jhansi |
2008-10-10 08:10:00 |
2008-11-04 14:00:00 |
N/A |
| NIT_5385 |
SUPPLY OF 01 NO.CNC INSULATION PROFILE CUTTING MACHINE , DELIVERY REQD IN FEB-09 |
BHEL, Jhansi |
2008-10-10 08:10:00 |
2008-11-04 14:00:00 |
N/A |
| NIT_5384 |
ENLISTMENT OF TRANSPORT CARRIERS |
BHEL, Trichy |
2008-10-09 02:10:00 |
2008-10-30 10:30:00 |
N/A |
| NIT_5383 |
CARRYING OUT REFRACTORY WORKS IN 08 CWS SHOP- 1 YEAR PERIOD |
BHEL, Hyderabad |
2008-10-07 02:10:00 |
2008-10-22 14:30:00 |
N/A |
| NIT_5382 |
SILICATE SAND RECLAMATION
PLANT |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-19 14:00:00 |
N/A |
| NIT_5381 |
GOUGING RECTIFIER |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-18 14:00:00 |
N/A |
| NIT_5380 |
SAND MULLER |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-14 14:00:00 |
N/A |
| NIT_5379 |
CNC HORIZONTAL BORER SPINDLE
DIA 200 MM |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-14 00:00:00 |
N/A |
| NIT_5378 |
PAY LOADER
CAPACITY 600 KG. |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-12 14:00:00 |
N/A |
| NIT_5377 |
TONG |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-11 14:00:00 |
N/A |
| NIT_5376 |
TRAILER 60 T CAPACITY |
BHEL, Haridwar |
2008-10-07 02:10:00 |
2008-11-06 14:00:00 |
N/A |
| NIT_5375 |
CAST IRON MARKING TABLE |
BHEL, Haridwar |
2008-10-07 01:10:00 |
2008-10-30 14:00:00 |
N/A |
| NIT_5374 |
NIT FOR SUPPLY, ERECTION, COMMISSIONING AND PERFORMANCE DEMONSTRATION OF FUEL CELL TEST STATION |
BHEL |
2008-10-07 11:10:00 |
2008-11-04 14:00:00 |
N/A |
| NIT_5373 |
NIT FOR SUPPLY, ERECTION, COMMSIIONING OF 5T/1T EOT CRANE |
BHEL |
2008-10-07 11:10:00 |
2008-10-28 14:00:00 |
N/A |
| NIT_5372 |
NIT FOR ELECTRO MAGNETIC DESIGN SOFTWARE FOR ELECTRICAL MACHINES |
BHEL |
2008-10-07 11:10:00 |
2008-11-04 14:00:00 |
N/A |
| NIT_5371 |
NIT FOR SUPPLY OF 2 NOS OF CIRCUMFERNTIAL BARRIER SEAL |
BHEL |
2008-10-07 11:10:00 |
2008-10-28 14:00:00 |
N/A |
| NIT_5370 |
NIT FOR 2NOS OF PRESSURE SCANNER / SCANNING BOX |
BHEL |
2008-10-07 11:10:00 |
2008-10-28 14:00:00 |
N/A |
| NIT_5369 |
TENDER NOTICE FOR CIVIL WORKS - PUMP SHOP AND BIOMETRIC SYSTEMS- IN FACTORY |
BHEL, Hyderabad |
2008-10-07 08:10:00 |
2008-10-31 13:30:00 |
N/A |
| NIT_5368 |
NIT FOR BALANCE CIVIL WORKS OF 1 X 37.2 MW LAKWA WASTE HEAT RECOVERY PROJECT PH-I, ASSAM |
BHEL, PSER |
2008-10-06 03:10:00 |
2008-10-15 15:00:00 |
Yes 1 |
| NIT_5367 |
INSULATION WORKS OF BOILER AND AUXILLIARIES TG AND AUXILLIARIES PIPING ETC OF UNIT 7 STAGE III 1X500MW UNIT AT NTPC KORBA THERMAL POWER STATION |
BHEL, PSWR |
2008-10-06 03:10:00 |
2008-10-16 11:00:00 |
Yes 1 |
| NIT_5366 |
PROCUREMENT OF PRECISION PLATINUM RESISTANCE THERMOMETERS |
BHEL, PSNR |
2008-10-06 02:10:00 |
2008-10-21 15:30:00 |
N/A |
| NIT_5365 |
NIT FOR CONSTRUCTION OF 70 M HIGH RCC MULTI-FLUE CHIMNEY ALONG WITH ASSOCIATED CIVIL AND STRUCTURAL, ELECTRICAL WORK COMPLETE AT 3X18 MW POWER AND BLOWING STATION, IISCO STEEL PLANT AT BURNPUR, W.B |
BHEL, PSER |
2008-10-06 02:10:00 |
2008-10-28 15:00:00 |
N/A |
| NIT_5364 |
PROVIDING OF ELECTRICAL WIRING TO ADDITIONAL CLASS ROOMS AND TOILETS TO SPECIAL CARE SCHOOL-ELECTRICAL WORK |
BHEL, Hyderabad |
2008-10-06 11:10:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5363 |
SUPPLY OF DRIVES,PLC,INSTRUMENTS AND OTHER ITEMS. |
BHEL, Bangalore |
2008-10-05 10:10:00 |
2008-10-31 17:00:00 |
N/A |
| NIT_5362 |
CONTRACT FOR PROVIDING CANTEEN SERVICES |
BHEL |
2008-10-04 07:10:00 |
2008-10-28 14:30:00 |
N/A |
| NIT_5361 |
MAINTENANCE SUPPORTS FOR PLANTS, EQUIPMENTS AND MACHINES |
BHEL, Jhansi |
2008-10-04 04:10:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5360 |
PREVENTIVE MAINTENANCE OF PLANT AND MACHINES |
BHEL, Jhansi |
2008-10-04 03:10:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5359 |
TRANSPORATION OF HRSG MODULES TO VARIOUS SITES. |
BHEL, Trichy |
2008-10-04 03:10:00 |
2008-10-25 10:30:00 |
N/A |
| NIT_5358 |
PROCUREMENT OF COPPER WIRE, PV PIPE, EARTH FLAT, ETC. |
BHEL, Trichy |
2008-10-04 02:10:00 |
2008-10-24 14:30:00 |
N/A |
| NIT_5357 |
PROCUREMENT OF VARIOUS RANGES OF POWER CABLE |
BHEL, Trichy |
2008-10-04 01:10:00 |
2008-10-23 14:30:00 |
N/A |
| NIT_5356 |
PROCUREMENT OF MEDIUM VOLTAGE INDUSTRIAL TYPE SWITCH BOARD |
BHEL, Trichy |
2008-10-04 10:10:00 |
2008-10-24 14:30:00 |
N/A |
| NIT_5355 |
PROCUREMENT OF RETAINING RING FORGINGS |
BHEL, Hyderabad |
2008-10-03 10:10:00 |
2008-11-06 14:30:00 |
N/A |
| NIT_5354 |
PROCUREMENT OF GENERATOR ROTOR FORGINGS |
BHEL, Hyderabad |
2008-10-03 10:10:00 |
2008-10-30 14:30:00 |
N/A |
| NIT_5353 |
REPAIR TO ROOF LIGHTING INSTALLATIONS IN ALL PROCUCTION BLOCKS,STORES DEPARTMENTS - 1 YEAR PERIOD |
BHEL, Hyderabad |
2008-10-03 09:10:00 |
2008-10-17 14:30:00 |
N/A |
| NIT_5352 |
PROCUREMENT OF HYDRO TEST STATION FOR 14 INCH TO 24 INCH 120 KG/SQCM VALVE 1 NO. |
BHEL, Trichy |
2008-10-03 08:10:00 |
2008-11-01 14:30:00 |
N/A |
| NIT_5351 |
EXPRESSION OF INTEREST FOR ACQUISITION OF TECHNOLOGY FOR DESIGN AND MANUFACTURE OF 3-PHASE TRACTION MOTORS SUITABLE FOR VVVF INVERTER FED SUPPLY |
BHEL, Bhopal |
2008-10-01 06:10:00 |
2008-11-30 17:30:00 |
N/A |
| NIT_5350 |
CIVIL WORKS AT 32 STORES AND 98 STORES OF CMM |
BHEL, Hyderabad |
2008-10-01 04:10:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5349 |
ITEM 1- CEMENT CONCRETE FLOORING IN 04 BLOCK , ITEM-2.PROVIDING ALUMINIUM SECURITY GRILLS TO WINDOWS OF FACTORY CIVIL AND INFORMATIC CENTRE |
BHEL, Hyderabad |
2008-10-01 04:10:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5348 |
PROCUREMENT OF HYDRO TEST STATION FOR 6 INCH TO 12 INCH 250 KG/SQCM VALVE 1 NO. |
BHEL, Trichy |
2008-10-01 03:10:00 |
2008-10-31 14:30:00 |
N/A |
| NIT_5347 |
PROCUREMENT OF HYDRO TEST STATION FOR 2 INCH TO 6 INCH 250 KG/SQCM VALVE 1 NO |
BHEL, Trichy |
2008-10-01 03:10:00 |
2008-10-31 14:30:00 |
N/A |
| NIT_5346 |
TENDER FOR ALLOTMENT OF SHOPS IN BHEL TOWNSHIP |
BHEL, Trichy |
2008-10-01 02:10:00 |
2008-10-15 14:30:00 |
N/A |
| NIT_5345 |
SUPPLY OF 32 NB BLACK PIPE AT BARSINGSAR SITE |
BHEL, PSNR |
2008-10-01 02:10:00 |
2008-10-13 15:30:00 |
N/A |
| NIT_5344 |
PROCUREMENT OF GENERATOR ROTOR FORGINGS. |
BHEL, Hyderabad |
2008-10-01 02:10:00 |
2008-11-05 14:30:00 |
N/A |
| NIT_5343 |
PROVIDING ADDITIONAL CLASS ROOMS AND TOILETS TO SPECIAL CARE SCHOOL - CIVIL WORKS. |
BHEL, Hyderabad |
2008-10-01 02:10:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5342 |
REPAIRS AND MODIFICATIONS TO TOWNSHIP ADMINISTRATION OFFICE BUILDING. |
BHEL, Hyderabad |
2008-10-01 02:10:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5341 |
REPAIRS AND MODIFICATION TO EXTERNAL SEWER LINES IN TOWNSHIP |
BHEL, Hyderabad |
2008-10-01 02:10:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5340 |
SECURITY SERVICES |
BHEL IVP Goindval |
2008-10-01 10:10:00 |
2008-10-13 00:00:00 |
N/A |
| NIT_5339 |
E T AND C OF ELECTRICAL AND CONTROL AND INSTRUMENTATION WORKS OF CO GENRATION PLANT COMPRISING HRSG 2X 100TPH FRAME 6B GAS TURBINE 2X30 MW AND AUXILLIARIES AT IOCL GUJARAT REFINARY VADODARA |
BHEL, PSWR |
2008-09-30 07:09:00 |
2008-10-16 11:00:00 |
Yes 1 |
| NIT_5338 |
E T ANC OF 1X292TPH HRSG AND AUXILLIARIES INCLUDING PIPING THERMAL INSULATION ETC AT 1X350MW CCPP AT GSEGL HAZIRA GUJARAT |
BHEL, PSWR |
2008-09-30 07:09:00 |
2008-10-16 11:00:00 |
Yes 1 |
| NIT_5337 |
RE-ROUTING OF COOLING WATER LINES AT NEW BALANCING TUNNEL AT BLOCK 01 WEST |
BHEL, Hyderabad |
2008-09-30 06:09:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5336 |
CIVIL WORKS FOR EXTENSION OF 132 KV SUB-STATION BUILDING AND SWITCH YARD |
BHEL, Hyderabad |
2008-09-30 06:09:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5335 |
WELDING RECTIFIER |
BHEL, Haridwar |
2008-09-30 03:09:00 |
2008-11-17 14:00:00 |
N/A |
| NIT_5334 |
GOUGING SETS |
BHEL, Haridwar |
2008-09-30 03:09:00 |
2008-11-17 14:00:00 |
N/A |
| NIT_5333 |
REPAIR AND RENOVATION OF CRITICAL MACHINES IN FOUNDRY 04,05, 09 BLOCK PATTERN SHOP |
BHEL, Hyderabad |
2008-09-30 02:09:00 |
2008-10-22 14:30:00 |
N/A |
| NIT_5332 |
SUPER HEATER COILS, WATER WALL TUBES MODIFICATION AND REPAIR OF BOILER FRONT REFRACTORY IN 30 TON BOILER |
BHEL, Hyderabad |
2008-09-30 02:09:00 |
2008-10-22 13:30:00 |
N/A |
| NIT_5331 |
PAINTING OF 30 METERS ELEVATED CHIMNEY FOR 30 TPH BOILER |
BHEL, Hyderabad |
2008-09-30 02:09:00 |
2008-10-17 14:00:00 |
N/A |
| NIT_5330 |
CLEANING OF CABLE TRENCHES AND PIPE LINE TRENCHES IN PRODUCTION BLOCKS- 14,100 RUNNING METERS |
BHEL, Hyderabad |
2008-09-30 12:09:00 |
2008-10-17 14:30:00 |
N/A |
| NIT_5329 |
PROVIDING SUPPORT SERVICES FOR MAINTENANCE OF PARKS IN TOWNSHIP. |
BHEL, Hyderabad |
2008-09-30 11:09:00 |
2008-10-04 13:30:00 |
N/A |
| NIT_5328 |
PROVIDING SUPPORT SERVICES FOR MAINTENANCE OF STDP, NRSP, INTERNAL DRAINAGE LINES |
BHEL, Hyderabad |
2008-09-30 11:09:00 |
2008-10-04 13:30:00 |
N/A |
| NIT_5327 |
PROVIDING SUPPORT SERVICES FOR MAINTENANCE OF WATER WORKS, SWIMMING POOL. |
BHEL, Hyderabad |
2008-09-30 10:09:00 |
2008-10-04 13:30:00 |
N/A |
| NIT_5326 |
ERECTION, TESTING, COMMISSIONING AND TRIAL OPERATION OF P.F. FIRED BOILER WITH AUXILIARIES AND TOTAL MATERIAL HANDLING WORK OF 2 UNITS OF EACH 80 MW CPP AT DARIBA MINES, HZL, RAJASTHAN |
BHEL, PSNR |
2008-09-30 10:09:00 |
2008-10-20 15:30:00 |
N/A |
| NIT_5325 |
TRANSPORTATION.OF 4 NOS.FLOW METERS TO DADRI-6 SITE / UP. |
BHEL, Trichy |
2008-09-30 09:09:00 |
2008-10-07 10:35:00 |
N/A |
| NIT_5324 |
ENVIRONMENTAL TEST CHAMBER |
BHEL, Bangalore |
2008-09-30 09:09:00 |
2008-10-22 13:30:00 |
N/A |
| NIT_5323 |
DC VOLT-CURRENT SOURCE, BENCH TOP |
BHEL, Bangalore |
2008-09-30 08:09:00 |
2008-10-22 13:30:00 |
N/A |
| NIT_5322 |
3 PHASE PROGRAMMABLE VOLT-CURRENT SOURCE WITH MEASUREMENT |
BHEL, Bangalore |
2008-09-30 08:09:00 |
2008-10-22 13:30:00 |
N/A |
| NIT_5321 |
SMT AUTOAMTIC VERTICAL STORAGE SYSTEM |
BHEL, Bangalore |
2008-09-30 08:09:00 |
2008-10-22 13:30:00 |
N/A |
| NIT_5320 |
AUTOMATIC PCB CONVEYING SYSTEM |
BHEL, Bangalore |
2008-09-30 08:09:00 |
2008-10-22 13:30:00 |
N/A |
| NIT_5319 |
ELECTRIFICATION OF WRI LAB |
BHEL, Trichy |
2008-09-29 06:09:00 |
2008-10-25 14:30:00 |
N/A |
| NIT_5318 |
ERECTION AND COMMISSIONING OF 750KVA AND 1000 KVA COMPACT SUB-STATIONS. |
BHEL, Trichy |
2008-09-29 06:09:00 |
2008-10-25 14:30:00 |
N/A |
| NIT_5317 |
ELECTRIFICATION OF BAYS 9 AND B, EXTN. OF BUILDING50 |
BHEL, Trichy |
2008-09-29 06:09:00 |
2008-10-25 14:30:00 |
N/A |
| NIT_5316 |
INSTALLATION OF CABLE RACKS, LAYING AND TERMINATION OF POWER CABLES UNDER CAS / PHASE-II. |
BHEL, Trichy |
2008-09-29 06:09:00 |
2008-10-25 14:30:00 |
N/A |
| NIT_5315 |
INSTALLATION OF DISTRIBUTION SWITCH BOARDS, FIXING OF LIGHTS AND WIRING IN BUILDINGS 107 AND 108. |
BHEL, Trichy |
2008-09-29 06:09:00 |
2008-10-25 02:30:00 |
N/A |
| NIT_5314 |
ANNUAL CLEANING, INSPECTION AND LICENCE OF 30 TPH AND 20 TPH BOILERS |
BHEL, Hyderabad |
2008-09-29 03:09:00 |
2008-10-07 14:30:00 |
N/A |
| NIT_5313 |
REPAIR OF MECHANICAL WINCH FOR MATERIAL HANLDLING OF IMPREGNATION PLANT 02- 1676 JOBS IN 02 SHOP |
BHEL, Hyderabad |
2008-09-29 12:09:00 |
2008-10-17 14:30:00 |
N/A |
| NIT_5312 |
TENDER NOTICE FOR CIVIL WORKS IN FACTORY |
BHEL, Hyderabad |
2008-09-29 11:09:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5311 |
PROCUREMENT OF COMBUSTION SYSTEM WITH INSTRUMENTATION PANEL 1 NO. |
BHEL, Trichy |
2008-09-27 02:09:00 |
2008-10-28 14:30:00 |
N/A |
| NIT_5310 |
SHIFTING AND RE ERECTION OF 15 TON GANTRY CRANE FROM 05 SHOP TO 09 CDC |
BHEL, Hyderabad |
2008-09-27 02:09:00 |
2008-10-07 14:30:00 |
N/A |
| NIT_5309 |
PROCUREMEN OF POWER TROLLEY 1 NO. |
BHEL, Trichy |
2008-09-27 02:09:00 |
2008-10-30 14:30:00 |
N/A |
| NIT_5308 |
TENDER NOTICE FOR CIVIL WORKS |
BHEL, Hyderabad |
2008-09-27 01:09:00 |
2008-10-18 13:30:00 |
N/A |
| NIT_5307 |
15T GANTRY CRANE |
BHEL, Bangalore |
2008-09-27 10:09:00 |
2008-10-20 13:30:00 |
N/A |
| NIT_5306 |
CABLES |
BHEL, Bangalore |
2008-09-27 09:09:00 |
2008-10-20 13:30:00 |
N/A |
| NIT_5305 |
MATLAB SIMULATION SOFTWARE |
BHEL, Bangalore |
2008-09-27 09:09:00 |
2008-10-20 13:30:00 |
N/A |
| NIT_5304 |
CONVERTER TRANSFORMERS |
BHEL, Bangalore |
2008-09-27 09:09:00 |
2008-10-20 13:30:00 |
N/A |
| NIT_5303 |
PROCUREMENT OF PLASMA TRANSFERRED ARC WELDING EQUIPMENT 1 NO. |
BHEL, Trichy |
2008-09-26 03:09:00 |
2008-10-29 14:30:00 |
N/A |
| NIT_5302 |
SUPPLY ANS SUPERVIOSION OF CONSTRUCTION ELEVATORS |
BHEL, PSNR |
2008-09-26 12:09:00 |
2008-10-10 15:30:00 |
N/A |
| NIT_5301 |
DEVELOPMENT AND CONSTRUCTION OF BHEL STORAGE AND STORE SHED COMPLEX AT SITE FOR 3X15 MW NIMOO BAZGO HYDRO ELECTRIC PROJECT SITE, VILLAGE ALCHI, DISTRICT LEH, JAMMU AND KASHMIR. |
BHEL, PSNR |
2008-09-26 11:09:00 |
2008-10-13 15:30:00 |
N/A |
| NIT_5300 |
DEVELOPMENT AND CONSTRUCTION OF BHEL STORAGE AND STORE SHED COMPLEX AT SITE FOR 4X11 MW CHUTAK HYDRO ELECTRIC PROJECT SITE, DISTRICT KARGIL, JAMMU AND KASHMIR. |
BHEL, PSNR |
2008-09-26 11:09:00 |
2008-10-13 15:30:00 |
N/A |
| NIT_5299 |
INDVICTA PLUG AND SOCKET BOARD |
BHEL, Haridwar |
2008-09-25 04:09:00 |
2008-11-12 14:00:00 |
N/A |
| NIT_5298 |
TRANSPORTATION OF REFRACTORY MATERIALS. |
BHEL, Trichy |
2008-09-25 03:09:00 |
2008-10-16 10:45:00 |
N/A |
| NIT_5297 |
REFURBISHMENT OF ELECTRICAL SYSTEM PERTAINING TO REHABILITATION OF 2X110 MW UNITS 9 AND 10 AT PATRATU TPS |
BHEL, Bhopal |
2008-09-24 05:09:00 |
2008-10-06 14:00:00 |
N/A |
| NIT_5296 |
E AND C MECHANICAL WORKS FOR R AND M/ UP RATING OF 2X110 MW GND TPS UNITS 3 AND 4 AT BATHINDA FOR PSEB, PUNJAB |
BHEL, Bhopal |
2008-09-24 05:09:00 |
2008-10-06 14:00:00 |
N/A |
| NIT_5295 |
RECEIPT OF EQUIPMENT/ MATERIAL AT SITE, UNLOADING, INSPECTION, VERIFICATION, STORAGE, UP-KEEPING DURING STORAGE, ERECTION, TESTING, COMMISSIONING AND HANDING OVER OF 400 KV SWITCHYARD AT KODERMA IN JHARKHAND |
BHEL, Industry Sector |
2008-09-24 04:09:00 |
2008-10-22 15:30:00 |
N/A |
| NIT_5294 |
EXECUTION AND HANDING OVER OF CIVIL WORKS FOR 400 KV SWITCHYARD AT SRINAGAR IN UTTARAKHAND. |
BHEL, Industry Sector |
2008-09-24 04:09:00 |
2008-10-22 15:30:00 |
N/A |
| NIT_5293 |
SOIL INVESTIGATION WORK AND EARTH RESISTIVITY TEST AT VARIOUS SITES OF ELECTRICAL SUBSTATIONS SPREAD ALL OVER INDIA ON RATE CONTRACT BASIS FOR A PERIOD OF TWO YEARS |
BHEL, Industry Sector |
2008-09-24 04:09:00 |
2008-10-22 15:30:00 |
N/A |
| NIT_5292 |
MOVEMENT OF RAW MATERIALS TO VARIOUS SUB-CONTRACTORS IN AND AROUND TWIN CITIES OF HYDERABAD, SECUNDERABAD, BHEL ANCILLARIES AND PATANCHERU AREA ETC., BY LORRIES / TRUCKS, TRAILORS AND VAN FOR THE YEAR 2008-09. |
BHEL, Hyderabad |
2008-09-24 09:09:00 |
2008-10-15 14:30:00 |
N/A |
| NIT_5291 |
BUILD AND RUN VEG. AND NON-VEG RESTAURANT |
BHEL, Trichy |
2008-09-23 08:09:00 |
2008-10-09 14:00:00 |
N/A |
| NIT_5290 |
NIT FOR UPGRADATION AND INTEGRATION OF EXISTING HIGH PERFORMANCE COMPUTING FACILITY |
BHEL |
2008-09-23 08:09:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5289 |
NIT FOR SUPPLY OF MINIATURE PRESSURE TRANSDUCERS |
BHEL |
2008-09-23 08:09:00 |
2008-10-07 12:00:00 |
N/A |
| NIT_5288 |
NIT FOR SUPPLY, ERECTION, COMMISSIONING OF 500KW SQUIRREL CAGE INDUCTION MOTOR ALONG WITH VFD |
BHEL |
2008-09-23 08:09:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5287 |
NIT FOR PROCUREMENT OF DIGITAL PRESSURE INDICATOR - LOW PRESSURE - DUAL RANGE |
BHEL |
2008-09-23 08:09:00 |
2008-10-07 14:00:00 |
N/A |
| NIT_5286 |
NIT FOR SUPPLY, ERECTION, COMMISSIONING OF HIGH PRESSURE AIR COMPRESSOR SYSTEM |
BHEL |
2008-09-23 08:09:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5285 |
NIT FOR SUPPLY, ERECTION, COMMISSIONIG, TRAINING ETC OF FUEL CELL TEST STATION AS PER ATTACHED SPECIFICATIONS |
BHEL |
2008-09-23 07:09:00 |
2008-09-25 14:00:00 |
N/A |
| NIT_5284 |
CATERING AND HOUSEKEEPING SERVICES |
BHEL |
2008-09-17 03:09:00 |
2008-10-08 00:00:00 |
N/A |
| NIT_5283 |
COLLECTION OF C FORMS FROM BHEL CUSTOMERS WITHIN INDIA |
BHEL, Ranipet |
2008-09-23 02:09:00 |
2008-11-27 15:00:00 |
N/A |
| NIT_5282 |
KALWAKURTHY LIFT IRRIGATION SCHEME STAGE I _ TRANSPORTATION FROM STROES TO SITE, HANDLING OF EQUIPMENTS AT SITE, ERECTION, TESTING AND COMMISSIONING OF ELECTRICAL AND C AND I SYSTEMS FOR 5X30MW CAPACITY PUMP SETS |
BHEL, PSSR |
2008-09-23 09:09:00 |
2008-10-14 11:00:00 |
N/A |
| NIT_5281 |
PROVIDING COMPOUND WALL WITH SOLAR FENCING AROUND THE PROPOSED NEW BLADE SHOP |
BHEL, Hyderabad |
2008-09-22 07:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5280 |
CIVIL WORKS FOR PROVIDING STORAGE YARD FOR RAW MATERIALS AT 51 BLOCK STORES |
BHEL, Hyderabad |
2008-09-22 07:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5279 |
CIVIL WORKS FOR 5T OPEN GANTRY YARD AT OIL RIGS -8MX135M |
BHEL, Hyderabad |
2008-09-22 07:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5278 |
RENOVATION -PROVIDING GALVALUME SHEETS ROOFING TO 51 BLOCK - BC BAY |
BHEL, Hyderabad |
2008-09-22 07:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5277 |
PROVIDING MACHINE FOUNDATION FOR CNC FLOOR TYPE MILLING ROTARY TK 920 |
BHEL, Hyderabad |
2008-09-22 06:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5276 |
CONSTRUCTION OF FOUNDATION FOR TRAVELLING COLUMN DRILLING MACHINE IN 51 BLOCK |
BHEL, Hyderabad |
2008-09-22 06:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5275 |
HIRIRNG OF TRACTORS 3 NUMBERS WITH ONE DRIVER AND ONE HELPER FOR 12 HRS OPERATION AND 15MT TO 20MT TRAILORS 7 NUMBERS FOR 24 HRS OPERATION. |
BHEL, Ranipet |
2008-09-22 03:09:00 |
2008-10-12 14:30:00 |
Yes 1 |
| NIT_5274 |
MOTORISED ROTATOR WITH POLYURETHANE CLADDED ROLLERS CAP. 50 T |
BHEL, Haridwar |
2008-09-20 04:09:00 |
2008-11-06 14:00:00 |
N/A |
| NIT_5273 |
MOTORISED ROTATOR WITH STEEL ROLLERS CAP. 100 T |
BHEL, Haridwar |
2008-09-20 04:09:00 |
2008-11-06 14:00:00 |
N/A |
| NIT_5272 |
NIT FOR SUPPLY, INSTALLATION, DEMONSTRATION AND TRAINING OF ONE NO. MULTIFUNCTION DIGITAL CALIBRATOR FOR TSX DEPARTMENT, KOLKATA |
BHEL, PSER |
2008-09-20 01:09:00 |
2008-10-13 15:00:00 |
N/A |
| NIT_5271 |
NIT FOR 10NOS OF BUSHINGS WITH MOULD FOR 210/250MW THRI GENERATOR |
BHEL |
2008-09-20 12:09:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5270 |
NIT FOR EPOXY INSULATORS - 300 NOS |
BHEL |
2008-09-20 12:09:00 |
2008-10-14 14:00:00 |
N/A |
| NIT_5269 |
REPAIRS TO 20T CAPACITY FLAT WAGON |
BHEL, Hyderabad |
2008-09-20 12:09:00 |
2008-10-03 13:30:00 |
N/A |
| NIT_5268 |
SUPPLY OF 4 MVA 33/0.433 KV OIL FILLED TRANSFORMER AS PER TENDER SPECIFICATION |
BHEL, New Delhi |
2008-09-20 12:09:00 |
2008-10-10 16:30:00 |
N/A |
| NIT_5267 |
NIT FOR SUPPLY OF DATA LOGGER 1 SET FOR PPERFORMANCE GUARANTEE TESING OF POWER PLANT EQUIPMENT IN LINE WITH ASME-PTC-6 FOR BHEL-PSERS KOLKATA OFFICE |
BHEL, PSER |
2008-09-20 11:09:00 |
2008-10-14 15:00:00 |
Yes 1 |
| NIT_5266 |
SUPPLY OF SCREW TYPE AIR COMPRESSOR WITH MINIMUM AIR DELIVERY 1465 CFM AS PER TENDER SPECIFICATION |
BHEL, New Delhi |
2008-09-20 11:09:00 |
2008-10-10 16:30:00 |
N/A |
| NIT_5265 |
SUPPLY OF PROJECTION WELDING MACHINE AS PER TENDER SPECIFICATION |
BHEL, New Delhi |
2008-09-20 11:09:00 |
2008-10-10 16:30:00 |
N/A |
| NIT_5264 |
SUPPLY OF DIE GRINDING MACHINE AS PER TENDER SPECIFICATION |
BHEL, New Delhi |
2008-09-20 10:09:00 |
2008-10-10 16:30:00 |
N/A |
| NIT_5263 |
CIVIL WORKS IN FACTORY AREA - TENDER NOTICE |
BHEL, Hyderabad |
2008-09-20 07:09:00 |
2008-10-11 13:30:00 |
N/A |
| NIT_5262 |
TENDER FOR PRINTING OF BHEL WALL AND TABLE CALENDARS 2009 |
BHEL, New Delhi |
2008-09-19 06:09:00 |
2008-10-04 15:00:00 |
N/A |
| NIT_5261 |
SUPPLY OF PIPES AND BENDS AS PER SA 106 GR B SPECN WITH THREE LAYER POLYPROPYLENE COATING AS PER DIN STANDARD 30678 |
BHEL, Piping Centre |
2008-09-19 03:09:00 |
2008-09-29 14:30:00 |
Yes 2 |
| NIT_5260 |
ENLISTMENT OF TRANSPORT CARRIERS FOR ALL INDIA TRANPORT RATE CONTRACT |
BHEL, Ranipet |
2008-09-19 03:09:00 |
2008-10-14 14:30:00 |
Yes 1 |
| NIT_5259 |
WELDING WORKS FOR PUMPS COMPONENT FOR THE YEAR 2008-09 |
BHEL, Hyderabad |
2008-09-19 01:09:00 |
2008-10-04 14:00:00 |
N/A |
| NIT_5258 |
ELECTRIFICATION OF BAYS,STORAGE YARDS ETC |
BHEL IVP Goindval |
2008-09-18 04:09:00 |
2008-09-30 03:30:00 |
N/A |
| NIT_5257 |
CONSTRUCTION OF BUILDING FOR CENTRE OF EXCELLENCE AT EDN PREMISES |
BHEL, Bangalore |
2008-09-18 03:09:00 |
2008-10-13 15:15:00 |
N/A |
| NIT_5254 |
SUPPLY OF 630 KVA 11/0.433 KV,3 PHASE TRANSFORMER |
BHEL, PSNR |
2008-09-17 05:09:00 |
2008-09-29 15:30:00 |
Yes 1 |
| NIT_5253 |
ERECTION AND COMMISSIONING OF 2X250 MW BOILER AND AUX INCLUDING PIPING, ESP, PAINTING AND INSULATION AT SIKKA TPS UNIT 3 AND 4, OF GSECL, GUJARAT |
BHEL, PSWR |
2008-09-17 05:09:00 |
2008-10-09 11:00:00 |
Yes 2 |
| NIT_5252 |
COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, ASSISTANCE FOR COMMISSIONING AND HANDING OVER OF ELECTRICAL PACKAGES AND ASSOCIATED ITEMS FOR UNIT 2, 250 MW AT MAHARASHTRA STATE POWER GENERATION CO. LTD.PARAS THERMAL POWER STATION, DIST AKOLA,MAHARASHTRA |
BHEL, PSWR |
2008-09-17 02:09:00 |
2008-10-10 11:00:00 |
Yes 1 |
| NIT_5251 |
COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, ASSISTANCE FOR COMMISSIONING AND HANDING OVER OF ELECTRICAL PACKAGES AND ASSOCIATED ITEMS FOR UNIT 2, 250 MW AT MAHARASHTRA STATE POWER GENERATION CO. LTD.PARLI THERMAL POWER STATION DIST , BEED MAHARASHTRA |
BHEL, PSWR |
2008-09-17 02:09:00 |
2008-10-10 11:00:00 |
Yes 1 |
| NIT_5250 |
CONSTRUCTION OF SINLGE FLUE RCC CHIMNEY OF HEIGHT 275M WITH AR BRICK LINERS USING SLIPFORM SHUTTERING EQUIPMENT INCLUDING SUPPLY AND ERECTION OF STACK ELEVATOR ETC COMPLETE AT 1X500MW TPS UNIT - 6. GUJARAT STATE ELECTRICITY CORPORATION LIMITED AT UKAI, DISTT. VAPI ,GUJARAT |
BHEL, PSWR |
2008-09-17 02:09:00 |
2008-10-10 11:00:00 |
Yes 1 |
| NIT_5249 |
CONSTRUCTION OF CIVIL, STRUCTURAL, ARCHITECTURAL AND LAND GRADING AND LEVELING WORKS FOR MAIN POWER BLOCK COMRISES OF GT, GTG, STG, HRSG, STACK INCLUDING ITS AUXILIRIES AND BALANCE OF PLANTS FOR 2X350MW COMBINED CYCLE POWER PLANT AT GSPC PIPAVAV POWER CO. LTD. PIPAVAV, DISTT. AMRELI ,GUJARAT |
BHEL, PSWR |
2008-09-17 01:09:00 |
2008-10-10 11:00:00 |
Yes 2 |
| NIT_5248 |
HIRING OF TAXIES ON CONTINGENCY REQUIREMENT |
BHEL, Bangalore |
2008-09-17 10:09:00 |
2008-10-13 14:45:00 |
N/A |
| NIT_5247 |
PROCUREMENT OF SRM ROLL GROOVING MACHINE AS PER SPECIFICATION |
BHEL, Trichy |
2008-09-16 08:09:00 |
2008-11-14 14:30:00 |
N/A |
| NIT_5246 |
PROCUREMENT OF CROSS PIERCING AND ELONGATION MILL FOR SEAMLESS STEEL TUBE MANUFACTURING |
BHEL, Trichy |
2008-09-16 08:09:00 |
2008-11-12 14:30:00 |
N/A |
| NIT_5245 |
NIT FOR PROVIDING FQA AND SAFETY SERVICES FOR CIVIL WORKS, BOP, E AND C OF STG 3X18MW, HRSG 3X200TPH, BACK PRTG 1X8.275MW, TURBO-BLOWER 3X2,28,600 NM3-HR AT IISCO STEEL PLANT BURNPUR, WEST BENGAL |
BHEL, PSER |
2008-09-16 05:09:00 |
2008-10-05 15:00:00 |
N/A |
| NIT_5244 |
SUPPLY OF 440 KVA 4 WIRE 1000 AMP POWER DISTRIBUTION BOARDS |
BHEL, PSNR |
2008-09-16 05:09:00 |
2008-09-26 15:30:00 |
N/A |
| NIT_5243 |
TRANSPORTATION OF CONSIGNMENTS AT CSU JAGDISHPUR |
BHEL, Jagdishpur |
2008-09-16 05:09:00 |
2008-10-03 15:00:00 |
N/A |
| NIT_5242 |
PHOTOCOPY AND ALLIED SERVICES LIKE SPRIAL BINDING ETC IN OUR OFFICE AT NAGPUR |
BHEL, PSWR |
2008-09-16 11:09:00 |
2008-10-08 11:00:00 |
N/A |
| NIT_5241 |
DESIGN,SUPPLY,ERECTION AND COMMISSIONING OF PUSH POINTING MACHINE WITH THE EXISTING
TABLE AND TROUGH. |
BHEL, Trichy |
2008-09-15 03:09:00 |
2008-10-15 15:00:00 |
N/A |
| NIT_5240 |
TO SUPPLY FLOW SWITCHES |
BHEL, Hyderabad |
2008-09-15 03:09:00 |
2008-09-20 00:00:00 |
N/A |
| NIT_5239 |
TO SUPPLY PR.SWITCHS |
BHEL, Hyderabad |
2008-09-15 03:09:00 |
2008-09-20 00:00:00 |
N/A |
| NIT_5238 |
CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS RELATED TO SOLID MATERIALS LIKE PET COKE, LIME STONE HANDLING SYSTEM INCLUDING BUNKERS, CONVEYER GALLERIES, TRANSFER TOWERS, CRUSHER HOUSES, STACKER RECLAIMER COMPLEX, HOPPERS, WAGON TIPPLER STRUCTURES INCLUDING PIT AND TUNNEL, CONTROL ROOM, MILL FEED SILO, COMPRESSOR HOUSE, TRANSFORMER FOUNDATIONS, RAILS ETC. FOR 3 X 33 MW STG PROJECT. FOR 3 X 33 MW STG PROJECT , BHARAT OMAN REFINARY LIMITED BORL ,BINA M P |
BHEL, PSWR |
2008-09-15 09:09:00 |
2008-09-30 11:00:00 |
N/A |
| NIT_5237 |
FIRE ALARM AND DETECTION SYSTEM |
BHEL, Haridwar |
2008-09-13 04:09:00 |
2008-10-30 14:00:00 |
N/A |
| NIT_5236 |
NIT FOR FABRICATION OF POWER HOUSE STRUCTURE PART AND MILL BAY STRUCTURE PART AT MEJIA TPS PROJECT PREMISES |
BHEL, PSER |
2008-09-12 11:09:00 |
2008-09-21 15:00:00 |
Yes 1 |
| NIT_5235 |
LOADING, UNLOADING AND DESTUFFING OF CSU MACHINES |
BHEL, Jagdishpur |
2008-09-11 02:09:00 |
2008-09-19 15:00:00 |
N/A |
| NIT_5234 |
NIT FOR SEMI AUTOMATIC SCREEN PRINTER |
BHEL |
2008-09-10 08:09:00 |
2008-10-18 14:00:00 |
N/A |
| NIT_5233 |
UPGRADATION OF EXISTING 80KJ HV IMPULSE MAGNETISER TO 120KJ |
BHEL |
2008-09-10 08:09:00 |
2008-10-04 14:00:00 |
N/A |
| NIT_5232 |
NIT FOR 1000W RF POWER SUPPLY WITH MATCHING NETWORK AND CABLES |
|